Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,080
Closing Date
1 Sept 2026, 4:00 pm4d left
Wildlife Warden Chenab Division,Kishtwar
Kishtwar
Construction of Inspection Path 10 Km Including Wooden Crossing and Rain Shed in Kibber Wildlife Chenab Division Kishtwar for the Year 2026 27
2026_FD_321116_1
NIT 28 OF 2026 27 Inspection path kibbar
Open Tender
Civil Works
Item Wise
90 days
Kibbar, Dachhan.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Wildlife Warden Chenab Division,Kishtwar
₹7,080
17 Aug 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Wooden crossing Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 10.71 | Cum | - | - |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 10.51 | Cum | - | - |
| 3 | Extraction , transportation and Labur of Drift Wood for making Wooden Croosing complete job as per directed by the site incharge Engage 4 Carpenter for 18 days for making Wooden Crossing | 72 | No | - | - |
| 4 | Engage 4 Labour for 18 days for making Wooden Crossing | 72 | No | - | - |
| 5 | Providing and fixing of Nails | 30 | Kg | - | - |
| 6 | Carriage of materials from source to site of work Stone av. Distance HL 550 Mtr | 10.51 | Cum | - | - |
| 7 | Inspection path Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 164.26 | Cum | - | - |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 21.98 | Sqm | - | - |
| 9 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 1,858 | Mtr | - | - |
| 10 | Carriage of materials from source to site of work Stone av. Distance HL 550 Mtr | 21.98 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_1071109.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].