Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.4 Cr
EMD Value
₹46.9 L
Closing Date
25 Nov 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer, WRD, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Construction of R.C.C flood wall along B/B of Khanajan Channel in between NH 27 to outfall including allied works. PH-II.
2026_DoWR_54813_1
KAMRUP METRO/2026-27/RIDF XXXII/II
Open Tender
Civil Works
Works
450 days
KAMRUP METRO
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹46.9 L
Yes
4 Nov 2026
4 Nov 2026
25 Nov 2026
4 Nov 2026
25 Nov 2026
16 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specificationsClause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches with excavated suitable material.
(I) Ordinary soil
Upto 3 m depth | 8,487.91 | m³ | 137.96 | ₹11,70,992.06 |
| 2 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
I Sand filling | 477 | m³ | 1,776.5 | ₹8,47,390.5 |
| 3 | Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks:
1:4 (1 cement : 4 coarse sand) | 4,960.61 | m² | 1,031.52 | ₹51,16,968.43 |
| 4 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 753.62 | m³ | 6,038.47 | ₹45,50,711.76 |
| 5 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
(A) With crushed stone
(I) R.C.C grade M 20
(i) For nominal mix 1:2:4(a) Height upto 5m | 3,874.03 | m³ | 8,816.74 | ₹3,41,56,315.26 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | 1,908 | m² | 401.72 | ₹7,66,481.76 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 11,499.02 | m² | 863.06 | ₹99,24,344.2 |
| 8 | Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications
(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/SAIL/ Esser Steel/Jindal panther steel/ Shyam steel or equivalent) | 307.79 | Tonne | 69,443.65 | ₹2,13,74,061.03 |
| 9 | Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications
(a)TMT-IS 1786 (Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) | 458.5 | Tonne | 76,312.32 | ₹3,49,89,198.72 |
| 10 | Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :
500 mm dia piles | 14,036 | Rm | 4,230.72 | ₹5,93,82,385.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
bid_khanajan_ii.pdf
Tender Documents • 0.67 MB
BOQ_85831.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .