| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAccepted-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹25.1 L+₹1.7 L (7.30%)Rejected-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹25.4 L+₹2.0 L (8.49%)Rejected-Finance ANAND NAGAR DHANORA ROAD BEED TA JI BEED | BEED | BEED | MAHARASHTRA | 431122 | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹25.4 L+₹2.0 L (8.69%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | L5₹26.1 L+₹2.8 L (11.8%)Rejected-Finance | L5 | Rejected-Finance Agreement With L1 |
| Sl No | Description | Qty | Unit | ARTIST BRO L1 | M/S SHREE JEE CONSTRUCTIONS L7 | DALMENDRA SINGH L5 | M/S PRABHAT CONTRACTOR AND ENGINEERS L6 | M/s Ajay Kumar Contractor L2 | M/S RAJKAMAL CONSTRUCTION COMPANY L3 | M/S SHREE JI CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 24.11 | CUM | 500 ₹12,054 | 100 ₹2,410.8 | 300 ₹7,232.4 | 300 ₹7,232.4 | 450 ₹10,848.6 | 518 ₹12,487.94 | 41 ₹988.43 Lowest |
| 2.00 | Dismantling R.C.C Including stacking of dismantled materials with in 60 Meter. Distance | 10.12 | CUM | 600 ₹6,075 | 100 ₹1,012.5 Lowest | 300 ₹3,037.5 | 400 ₹4,050 | 450 ₹4,556.25 | 633 ₹6,409.12 | 179 ₹1,812.38 |
| 3.00 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 205.4 | CUM | 70 ₹14,377.86 | 20 ₹4,107.96 | 50 ₹10,269.9 | 70 ₹14,377.86 | 9 ₹1,848.58 Lowest | 100 ₹20,539.8 | 141 ₹28,961.12 |
| 4.00 | Providing and laying C.C. (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 30.38 | CUM | 5,100 ₹1,54,922.7 | 4,500 ₹1,36,696.5 | 5,200 ₹1,57,960.4 | 5,700 ₹1,73,148.9 | 5,400 ₹1,64,035.8 | 6,452 ₹1,95,992.4 | 61 ₹1,853 Lowest |
| 5.00 | Providing and laying C.C. (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | 55 | CUM | 5,600 ₹3,08,022.4 Lowest | 6,500 ₹3,57,526 | 6,300 ₹3,46,525.2 | 6,500 ₹3,57,526 | 6,300 ₹3,46,525.2 | 6,300 ₹3,46,525.2 | 5,700 ₹3,13,522.8 |
| 6.00 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 105.71 | CUM | 6,100 ₹6,44,824.9 | 7,800 ₹8,24,530.2 | 6,700 ₹7,08,250.3 | 7,300 ₹7,71,675.7 | 7,200 ₹7,61,104.8 | 6,600 ₹6,97,679.4 | 5,900 ₹6,23,683.1 Lowest |
| 7.00 | Providing and laying C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 3.8 | CUM | 6,100 ₹23,155.6 | 7,500 ₹28,470 | 6,965 ₹26,439.14 | 7,500 ₹28,470 | 7,200 ₹27,331.2 | 7,963 ₹30,227.55 | 6,000 ₹22,776 Lowest |
| 8.00 | Shuttering for R.C.C. work - For Bridge Slabs up to 3M span. | 59.1 | SQM | 500 ₹29,549.5 | 500 ₹29,549.5 | 550 ₹32,504.45 | 800 ₹47,279.2 | 180 ₹10,637.82 Lowest | 860 ₹50,825.14 | 359 ₹21,216.54 |
| 9.00 | Shuttering for R.C.C. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 316.59 | SQM | 600 ₹1,89,953.4 | 600 ₹1,89,953.4 | 800 ₹2,53,271.2 | 500 ₹1,58,294.5 | 180 ₹56,986.02 Lowest | 600 ₹1,89,953.4 | 376 ₹1,19,037.46 |
| 10.00 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 9.95 | M.T. | 70,000 ₹6,96,290 Lowest | 80,000 ₹7,95,760 | 72,000 ₹7,16,184 | 70,000 ₹6,96,290 Lowest | 99,000 ₹9,84,753 | 71,000 ₹7,06,237 | 90,000 ₹8,95,230 |
Tender Value
₹33.0 L
EMD Value
₹66,100
Closing Date
1 Oct 2026, 11:00 amClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 26.440 of Kithaur Rajbaha.Lot No-06
2026_UPIDC_1176988_39
TN-05/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹66,100
14 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge | 24.11 | CUM | - | - |
| 2 | Dismantling R.C.C Including stacking of dismantled materials with in 60 Meter. Distance | 10.13 | CUM | - | - |
| 3 | Earth work in foundation in dry ordinary soil i/c all lift & lead and i/c back filling ,watering & ramming of exavated earth in to tranch or in to the space between the structure & the side of foundation tranches or in to the plinth with removal & disposal or surplus earth as dircted by Engg.-in-Charge. | 205.4 | CUM | - | - |
| 4 | Providing and laying C.C. (A-20 M15) (1:2:4) including all cost of materials, labour and T&P etc complete. | 30.38 | CUM | - | - |
| 5 | Providing and laying C.C. (A-20 M20) (1:1.5:3) including all cost of materials, labour and T&P etc complete. | 55 | CUM | - | - |
| 6 | Providing and laying R.C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 105.71 | CUM | - | - |
| 7 | Providing and laying C.C. (A-20 M25) (1:1:2) including all cost of materials, labour and T&P etc complete. | 3.8 | CUM | - | - |
| 8 | Shuttering for R.C.C. work - For Bridge Slabs up to 3M span. | 59.1 | SQM | - | - |
| 9 | Shuttering for R.C.C. work - T-beam bridge, syphon,aqueduct & box culvert above 3M span | 316.59 | SQM | - | - |
| 10 | Supplying and laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 9.95 | M.T. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2240891.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .