| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74.1 LAdmitted-Finance | -1.75% | ₹74.1 L | L1 | Admitted-Finance |
| 2 | L2₹74.9 L+₹75,450 (1.02%)Admitted-Finance GRAM SONPURA PADMA HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | -0.75% | ₹74.9 L+₹75,450 (1.02%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | PASHCHIM CHAMPARAN | BIHAR | 845101 | - | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹75.5 L
EMD Value
₹1.5 L
Closing Date
14 Feb 2026, 5:00 pmClosed
EE RDSD HZB
EE RDSD HZB
Construction of bridge over Barsoti river at Panchayat Malkoko under Block Barhi
2026_RDSPL_110142_1
RDSPL/SD/HZB/35/2025-26
Open Tender
Civil Works
Percentage
270 days
HAZARIBAGH BARHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
19 Sept 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
14 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. Ordinary Soils | 257.77 | M³ | 316.2 | ₹81,506.87 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. Ordinary Rocks | 601.47 | M³ | 395.2 | ₹2,37,700.94 |
| 3 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 90 | M² | 330.34 | ₹29,730.6 |
| 4 | Embankment construction with material obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads,transporting to site, spreading grading to required slope and compacting to meet requirement of table 300-2)
Rolling with smooth wheeled roller | 297.15 | M³ | 129.9 | ₹38,599.78 |
| 5 | Granular sub-base with Close Graded Material (Table:400-1) Plant Mix Method (Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401)
With Grading -III Material
S.O.R. Item No. 4.1 B (iii) Factor =1.01 | 73.58 | M³ | 1,680.3 | ₹1,23,636.47 |
| 6 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 49.08 | M³ | 5,360.4 | ₹2,63,088.43 |
| 8 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 108 | M³ | 138.3 | ₹14,936.4 |
| 9 | Sand Filling in foundation trenches as per drawing & technical specification S.O.R. Item No.12.03 (RDD) | 6.75 | M³ | 567.8 | ₹3,832.65 |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed) | 56.7 | M³ | 3,458.6 | ₹1,96,102.62 |
| 11 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. Grade-M15 S.O.R. Item No.12.08 A (RDD) | 13.5 | M³ | 3,541.9 | ₹47,815.65 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Tender_Documents.pdf
Tender Documents • 1.07 MB
BOQ_148842.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .