Construction work of community building-cum-workshed in village Silour Mahadalit Tola of Panchayat Pakribarwan North of Pakribarwan block. (Mouza- Pakribarwan Police Station No.- 45, khata No.-2616, Khesra-4490)
130463
NIT-01/2026-27/E-TENDER/LAEO/WD-1 NAWADA/GR-01
Open Tender
CIVIL
Nawada
• NAME OF BIDDER WITH ADDRESS
CIVIL
PERCENTAGE
L1
1
14 documents required · 14 mandatory
₹5,000
Processing Fee: 590
₹58,600
16 Oct 2026
4 May 2026
8 May 2026
4 May 2026
7 May 2026
4 May 2026
पकरीबरवाँ प्रखण्ड के पंचायत पकरीबरवाँ उत्तरी के ग्राम सिलौर महादलित टोला में सामुदायिक भवन -सह वर्कशेड का निर्माण कार्य | ( मौजा - पकरीबरवाँ थाना सं0- 45 , खाता सं0 -2616 , खेसरा -4490 )
PROJECT-PROPOSED COMMUNITY HALL CUM WORK SHED WITH SEPTIC TANk AND WATER POINT FOR PILE FOUNDATION
FOR BIHAR MAHADALIT VIKAS MISSION , PATNA
PILE FOUNDATION
AREA GROUND FLOOR 100.96 Sq.Mtr
plot area 15X18 270 Sq.Mtr
ITEMS COVERED UNDER( S.O.R. -B.C.D 01.01.2022)
DETAILED ABSTRACT OF COST
BUILDING TYPE AREA (Sq.Mtr) UNIT TOTAL COST (Rs)
1 CIVIL COST OF BUILDING
2 COMPLETE P.H.E. WORKS COST
3 Cost of Septic Tank and Soak Pit
3 ELECTRIC WORKS
4 BOUNDARY WALL
6 Quality controll @ 0.5%
7 CONTINGENCY @ .5.% upto Rs.100 Lac 500
LAEO WD-01 NAWADA LAEO WD-01 NAWADA
Construction work of community building-cum-workshed in village Silour Mahadalit Tola of Panchayat Pakribarwan North of Pakribarwan block. (Mouza- Pakribarwan Police Station No.- 45, khata No.-2616, Khesra-4490)
UNDER BIHAR MAHADALIT VIKASH MISSON ,PATNA
COST OF B.O.Q AMOUNT RS.
COST OF B.O.Q RS. 5000
EARNEST MONEY RS.
SL.NO DESCRIPTION UNIT QTY. Rate AMOUNT
1 20.2.1 Boring, Providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :
20.2.1 300 mm dia piles metre 902.6
2 2.29 Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m
2.29.1 All kinds of soil. 100sqm 1355.4
3 2.8 Earth work in excavation in foundtion trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
2.8.1 All kinds of soil Cum 360.7
4 2.26 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead. Cum 123.9
5 2.28 Supplying and Filling in plinth with local sand and under floors including watering, ramming consolidating and dressing complete. cum 287.3
6 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level:
4.1.3 1:2:4(1 Cement:3 coarse sand: 6 graded stone aggregate 20mm nominal size) cum 3998.1
7 4.1.8 1:4:8(1 Cement: 4 coarse sand:8 graded stone aggregate 40 mm nominal size) cum 2975.2
8 4.11 Providing 50 mm th. DPC at plinth level cum 245.6
9 4.12 Extra for providing and mixing water profing material in cement concrete work in the proportion recommended by the manufacturers. cum 57.16 109
12 5.2.2 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Cum 5670
13 5.11.1 Suspended floors, roots, laning, beams and balconies (Plan area to be measured) sqm 174
14 5.3 Providing and laying in position machine batched and mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved desing mix, Including pumping of concrete to site for laying but excluding the cost of centering, shuttering, finishing an including retard setting of concrete, Improve workability withoutt impairing strength and admixtures in recommended proportions as per IS:9103 to accelerate, reinforcement, durability as per direction of Engineer-incharge, Note:- Cement content considered in this item is @ 330kg/cum, Excess or less cement used as per design mix is payable or recoverable separetely.
All work up to plinth level cum 5335.9
15 5.33B.4 Add or deduct for providing richer or leaner mixes respectively at all floor levels Providing M-15grade R.C.C instead of M-20 grade R.C.C. cum 383.8
16 5.9 Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete. Sqm 211.1
17 5.9.3 Suspended floors, roofs, landings, balconies and access platform. sqm 437.5
18 5.9.4 Shelves (Cast in situ) sqm 437.5
19 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers. sqm 404.7
20 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts. sqm 494.4
21 5.9.16 Edges of slabs and breaks in floors and walls.
5.9.16.1 Under 20cm wide Metre 130.2
22 5.9.19 Weather shade, Chajjas, corbels, etc. including edges. sqm 550.9
5.22 Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.
23 5.22.7A Thermo-Mechanically Treated bars TMTC-500-8mm dia Kg 94.5
24 5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia Kg 92.6
25 5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia Kg 90.8
26 5.22.7D Thermo-Mechanically Treated bars TMTC-500-16mm dia Kg 91.7
27 6.1A Brick work with bricks of class designation 100A in foundation and plinth in:
28 6.1.14A Cement mortar 1:6(1 cement:6 coarse sand) cum 47.78 4819.9
29 6.3A Extra for Brick work in superstructure above plinth level upto floor V Level cum 842.2
30 6.13A Brick work 7cm thick with F.P.S brick of class designation 100A in cement mortar 1:3(1 cement: 3 coarse sand) in superstructure. sqm 482
31 6.18A Half brick masonry with bricks of class designation 100A in foundations and plinth in :
6.18.4A Cement mortar 1:4 (1 cement: 4 coarse send) sqm 599.3
32 6.21A Extra for providing and placing in position 2 nos. 6mm dia, MS bars at every third course of half brick masonry (with F.P.S bricks) sqm 113.6
33 6.19A Extra for half Brick masonry in superstructure above pinth level upto floor V level. sqm 89.7 1064
34 9.48.1 P& F M.S grills Kg 144.5
35 9.48.2 P& F M.S grills Kg 161.1
36 10.5.2 Providing and fixing 1 mm thicks M.S sheet door with frame of 40x40x6mm angal iron and 3mm M.S gusset plates at the junction and corners. All necessary fittings completejncluding applying a priming coat of approved primer using flats 30x6mm for diagonal braces and central cross piece. metre 3467.9
37 10.14.1 providing and fixing T-iron frames for doors . Window and ventilation of mils steel tee -sections , joints miltred and welded with 15x4 mm luge 10cm long embedded in cement cocerete block 15x10x10cm of 1:3:6(1 cement:3 coarse sand :6 graded stone aggregate 20mm nominal size) or with woodden plugs and screws or rawl plugs and screws or with fixing clips or with bolts and nuts as required including. kg 110.4
38 10.32 Steel work welded in built up sections/framed worK including cutting hoisting, rixing in position and applying a priming coat of approved steel primer using structural steel, etc. as required.
10.32.2 Fixed to steel windows by welding Kg 114.6
39 10.18 Providing and fixing circular cast iron box for ceiling fan clamp 140 mm internal dia, 73 mm height, 5 mm thick rim bottom and top lids, 1.5 mm thick M.S sheet with its top surface hacked for proper bonding top lid shall be screwed into the cast iron box by means of 3.3 mm dia round headed screws, one ;pcf at the corners. Clamps shall be made of 12 mm dia M.S. bar bent to shape as per standard drawing. Each 165.4
40 10.33 Providing and fixing hand rail by welding etc. to steel ladder railings & staircases railing including applying apriming coat of approved steel primer
10.33.3 G.I pipes 40mm nominal bore(class B) Kg 150
41 11.3 Cement concrete flooring 1:2:4(1 cement:2 coarse:sand:4 graded stone agregate) finished with a floating coat of neat cement including cement slurry, etc. but excluding the cost of nosing of steps etc. complete.
11.3.1 40 mm thick with 20 mm nominal size stone aggregate sqm 289.1
42 11.6 Cement plaster skirting (upto 30 cm hieght) with cement mortar 1:3 (1 cement:3 coarse sand) finished with a floating coat of neat cement
11.6.1 18 mm thick sqm 304.15
43 11.13 Providing and fixing glass strips in joints of terrazo/cement concrete floors.
11.13.1 40 mm wide and 4 mm thick metre 56.1
44 11.38 Providing and laying Ceramic glazed floor tiles 300x300mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS:15622 of approved make in all colours, shades, except White, Ivory, Grey, Fume Red Brow laid on 20mm thick bed of Cement Mortar 1:4 (1 Cement: 4 Coarse sand) including pointing the joints with white cement and matching pigments etc. complete. sqm 862.4
45 11.36 Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS:15622(thickness to be specified by the manufacture) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12mm thick bed of cement Mortar 1:3(1 cement: 3 coarse sand ) and jointing with grey cement slurry @ 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete. sqm 795
46 11.72 Providing designation 100A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/I. sqm 283.3
47 11.76 Providing average 150mm thick dry rammed khoa beaten to 112mm (compacted with water) made of well burnt or jhama bricks including ramming properly till compacted thickness is achieved, curing and carriage of water with all leads, making proper slope and blinding the top with cement mortar (1: 10) all complete as per building specification and direction of E/l, sqm 388.3
48 12.39 Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4( 1 cement: 2 coarse sand: 4 graded stone aggregate of 20mm nominal size) over P.V.C sheet 1mx1mx400 micron, finished with 12mm cement plaster 1:3(1 cement: 3 coarse sand) and a coat of neat cement rounding the edge sand making and finishing the outlet complete. Each 189.4
49 13.11 12mm cement plaster of mix:
13.11.4 1:6(1 cement: 6 coarse sand) sqm 141.5
50 13.12 15mm cement plaster on the rough side of single or half brick wall of mix:
13.12.4 1:6(1 cement: 6 course sand) sqm 162.8
51 13.17.1+13.36.1 12 mm thick cement plaster with water proofing in cm (1:3) with neat cement punning…E/I. (over tarrece) sqm 212.6
52 11.77 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. sqm 721.1
53 2.25(A) Excavating,supplying and filling of local earth by mechanical transport up to lead of 3 km cum 116.5 411.7
54 13.24 6mm cement plaster to ceiling of mix:
13.24.2 1:4( 1 cement: 4 coarse sand) sqm 125.6
55 13.17.1 12 mm cement plaster 1:3( 1 cement: 3 coarse sand) finished with a floating coat of neat cement sqm 203.6
56 285 50mmize bricks aggrigate outerside soak pit cum 1247
57 13.7 White washing with lime to give an ever shade
13.70.1 New work (three or more coats) sqm 18.9
58 13.79 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade
13.79.1 New work (three or more coats) sqm 81.2
59 13.81 Applying priming coat:
13.81.3 With ready mixed red oxide zinc chromate yellow primer of approved brand and manufacture on steel galvanised iron/steel works sqm 34.6
60 13.94 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:
13.94.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. sqm 116.5
61 13.116 Forming groove of uniform size from 12x12mm and upto 25x15mm in plastered surface as per approved pattern using wooden battens, nailed to the under layer including removal of wooden battens, repairs to the edges of plaster panel and finishing the groove complete as per specifications and direction of the Engineer-in-Charge. Metre 47.1
62 Carriage of Materials:-
Bricks -8 KM %0 nos
Coarse sand 10 km (P ) Cum
Stone chips -86 km Cum 2053.89
Local Sand - 3 KM( Lead 1K+2P) Cum 316.34
cement Mt 323.69
Steel Mt 323.69
SANITARY INSTALLATION
63 17.1.1 Providing and fixing water closet squatting pan (Indian type W.C pan) with 100mm sand cast Iron P or S trap, 10 litre low level white P.V.C flushing cistern with manually controlled device (handle lever) conforming to IS:7231, with all fittings and fixtures complete including cutting and making good the walls and floors wherever required:
White Vitreous china Orissa pattern W.C. pan of size 580 x 440 mm with integral type foot rests. Each 2 1192
64 SOR 17.35 Provding and fixing soil,waste and vent pipes
SOR 17.35.1 100 mm dia
SOR 17.35.1.1 Sand cast iron S & S pipe as per IS:1729 metre 4 978.3
65 SOR 17.40 Provding and fixing heel rest sanitary bend
SOR 17.40.1 100 mm dia
SOR 17.40.1.1 Sand cast iron S & S pipe as per IS:1729 Each 5 513.3
66 SOR 17.43 Provding and fixing single equal plain junction of required degree with access door ,insertion rubber washer 3mm thick ,bolt and nuts complete
SOR 17.43.1.1 Sand cast iron S & S pipe as per IS:1729 Each 2 671.2
67 SOR 17.56 Provding and fixing terminal guard
SOR 17.56.1 100 mm dia
SOR 17.56.1.1 Sand cast iron S & S pipe as per IS:1729 Each 2 392.9
RAIN WATER PIPE
68 SOR 12.78 Providing and fixing on wall face unplasticised-PVC (working pressure 4 Kgf per sqm) rain water pipes conforming to IS:4985including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion
SOR 12.78.2 110mm diameter Metre 8 257.5
69 SOR 12.79 Providing and fixing on wall face unplasticised -PVC moulded fittings/ accessories for unplasticised PVC rainwater pipes conforming to IS:4985 including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion.
SOR 12.79.1 Coupler
SOR 12.79.1.2 110mm Each 2 120
SOR 12.79.5 Bend 87.50
SOR 12.79.5.2 110mm bend Each 2 132
SOR 12.79.6 Shoe (Plain)
SOR 12.79.6.2 110mm Shoe Each 2 115.95
70 SOR 12.80 Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised-PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S screws of required length including cutting brick work and fixing in cement mortar 1:4( 1 cement: 4 coarse sand) and making good the wall etc. complete.
71 SOR 12.81 Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diameter and weighing not less than 440 grams. Each 2 47.9
72 SOR 2.10 Excavating trenches of required width for pipes, cables etc including excavation for sockets and dressing of sides, ramming of bottoms depth upto 1.5m ,including getting out the excavated soil , and then returning the soil as required,in the layers not exceeding 20 cm in depth including consolidating each deposited layers by ramming watering and desposing of surplus excavated soil as dirceted within a lead of 50m
(A) SOR 2.10.1.2 pipes cables etc exceeding 80mm dia but not exceeding 300 mm dia Meter 6 391.7
73 SOR 19.6 Providing and laying non -pressure NP2 class(light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 including testing of joints etc. complete
(A) SOR 19.6.2 150 mm dia R.C.C. pipe Meter 6 410.7
74 SOR 19.7 Constructing brick masonary manhole in cement mortar 1:4 (1 cement, 4 coarse sand.) R.C.C. top slab with1:2:4 mix(1 cement, 2 coars e sand, 4 graded stone aggregate 20 mm nominal size) foundation cocrete 1:4:8 mix (1cement, 4 coarse sand, 8 graded stone aggregate 40 mm nominal size.) inside plastering 12 mm thick with cement mortar 1:3 (1 cement, 3 coarse sand.) finished with floating coat of neat cement and making channels in cement concrete 1:2:4. finished with floating coat of neat cement complete as per standard design.
(a) SOR 19.7.1 Inside size 90x80cm and 45 cm deep including C.I. cover with frame ( light duty) 455x610 mm internal diamension tatal weight of cover and fram to be not less than 38 kg (weight of cover23 kg and weight of frame 15 kg )
SOR 19.7.1.1 With cmmon burnt clay F.P.S. (non modular)bricks with class designation 7.5 Each 1 7914.7
Part 'A' Cost of Materials
75 PHED Boring / drilling bore well of required dia for casing / strainer pipe by suitable method prescribed in IS: 2800(part l) including collecting samples from different strata, preparing and submitting strata chart / bore log, including hire & machineries required for the job, all complete as per direction of Engineer - in - charge. upto 90 metre depth below ground level 300/250 mm dia bore hole for inserting of 125 mm dia U.P.V.C. casing pipe / slotted pipe U.P.V.C screen pipes for installation mark ll hand pump.
76 PHED All types of soil
PHED From G.L. to 90 mtrs depth P/M 55 486.8
77 PHED Providing all equipments and labour lowering 125 mm dia U.P.V.C. casing slotted U.P.V.C / U.V.C. ribbed screen pipe imperfect vertically confirming to the available strata ( slotted pipe / screen pipe area to be lowered in water bearing aquifer and as per direction of E/I at site and also where casing pipe will be lowered. P/M 53 20.2
78 PHED Supplying fitting and fixing the following G.I. fitting of approved make and specification at work site copmlete job.
BCD 18.7.5 125 mm center guide Nos in each T/W. each 4 151.5
79 BCD 25 mm dia well plug . each 1 75.75
80 BCD Clamp for 125 mm pipe. each 1 141.4
81 Gravel packing in tubewell construction in accordance with IS: 4097,including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. cum 1.3 1343.2
82 Carriage of pea gravel average 400 km lead. cum 1.3 5616.2
83 PHED Supplying all materials labours and aquipments to seal T/W up to the depth of 10 mtrs below G.L. by stick clay to prevent contamination from surface from all complete job as per direction of E/I. each 1 50.5
(a) Providing all material and labour and construction 1.85 mtrs dia circular PCC ( 1:2:4 ) UNICEF design platform with foot rest etc all complete. each 0 5950
(b) Providing all materials, labours, equipments for construction PCC (1:2:4) 1drain as per specification and UNICEF design etc all complete job. P/M 2 671
84 PHED Supplying all tools equipment and labour for flushing washing and developing the T/W to give clean and clear water and all complete job as per direction of E/I. L.S. 1 601.8
85 PHED Supplying all tools for lowering 32 mm dia G.I. pipe. P/M 30.5 20.12
86 PHED Fixing cylinder. each 1 218.5
87 PHED Fixing India Marka ll hand pump. each 1 156.7
109 PHED Cost of Materials:-
PHED UPVC Ribbed strainer 125mm ( each of 3 mtrs in length ) conform to the I.S. 12818-1983/1992. each 2 1536
UPVC Pipe 125mm conform to I.S.12818-1983/1992. P/M 50 427
Hand Pump India Marka ll conforming to I.S.:15500 (pt-1to8) /2004 each 1 9192
G.I. Pipe 32mm confirming to I.S.:1239 (part 1-4) P/M 30.5 232
add extra 5.36% gst RS
88 1.1.2 Wiring for light point/ fan point/ exhaust fan point / call bell point with 1.5 Sq.mm FR PVC insulated copper conductor single core cable in surface/ recessed PVC conduit with piano type switch, modular plate, suitable size G.I. box and earthing the point with 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required. Group- B a. Light/ call bell points - 27 b. Ceiling fan points - 07 c. Ex. Fan points - 02 Total - 36 Point
89 1.24.4 Supplying and fixing 3 pin 5/6 amps socket outlet & 6A switch piano type on the existing switch box including connections etc. as required. Point
90 Supplying and fixing suitable size GI/PVC box on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 5/6 amps socket outlet & 6A switch piano type connection painting etc. as required. Point
91 Supplying and drawing low resistance co-axial T.V cable RJ-6 grade copper conductor PE insulated, with PVC sheath in the existing PVC concuit etc. as required. Meter
92 1.23.7 Supplying and fixing piano type T.V antenna socket on the existing metal box including making connection, etc. as required. Each
93 Wiring for circuit/ submain wiring along with earth wire with the following sizes PVC insulated copper conductor, single core cable in surface / recessed PVC conduit as required.
94 1.7.1 2 x 1.5 sq. mm + 1 x 1.5 sq. mm earth wire (Circuit wiiring) Meter
1.7.11 4 x 6.0 sq. mm + 1 x 6.0 sq. mm earth wire Meter
95 Supplying and fixing metal box of following size in recess with suitable size of phenolic laminated sheet cover in the front including painting etc. as required.
1.22.1 75mmX75mmX60mm Each
MAIN PANEL & D.B.s
96 2.8.6 Supplying and fixing 8 way double door sinle pole and Neutral sheet steel M.C.B. D.B, 240 Volts in recess, complete with tinned copper busbar, neutral bus bar, earth bar, din bar , detachable gland plate, interconnection, phosphatized and powder painted including nting, earthing etc. as required ( But without MCB/ RCCB/Isolator)(UPS DB) Each
72 Supplying and fixing of following rating C series MCB suitable for inductive and other loads of following poles in the existing MCB DB complete witth connections ,testing and commissioning etc. as required .
2.12.1 6 Amp. To 32 Amp. SP MCB 240 Volt Each
2.12.3 32 Amp SPN MCB 240 Volt Each
97 Earthing with G.I earth pipe 4.5 mt. long 40mm dia including accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe etc. including providing salt and charcoal for pipe earth electrode as required. Set
98 Providing and laying earth connections from earth electode with 4.00 mm. Dia copper wire in 15 mm. Dia G.I.pipe from earth electrode as required. Meter
99 Providing and fixing 25mmX5mm GI strip on surface for connection etc as required. Meter
100 Providing and fixing 4mm dia copper wire on surface or in recess for loop earthing etc as required. Meter
SUPPLY AND INSTULATION FIXTURES
101 Supplying and fixing bulkhead fitting die cast aluminium alloy body with prismatic glass cover suitable for the GLS/CFL lamp directly on wall/ ceiling including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each
102 Supplying and fixing 2 pin 5 Amp ceiling rose on the existing junction box/ PVC box including connection etc as required. Each
103 Supplying and fixing batten / angle holder including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each
Supplying and fixing following types lamp in existing electrical fitting/ fixture etc as required.
20 watt CFL lamp Each
104 Supplying and installation of regular/standard model A.C. ceiling fan of 1200 mm sweep including wiring the down rods of stanard length ( upto 30 cm) with 1.5 sq. mm FR PVC insulated insulated copper conductor etc as required. Each
105 8.17.1 Supply and Installation of 300 mm, 230 V A.C. exhaust fan in the existing opening, including making good the damage, including making good the damage, connection, testing, commissioning etc. as required. Each 5143
106 Supplying and fixing powder coated strip fitting complete with electronic ballast, 4'x20 watt fluorescent lamp etc. directly on ceiling / wall including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each
108 Add 10% S.F coast of materials
Bricks -8 KM(local lead 1K+7P) %0 nos 485.2
Coarse sand 10 km (P ) Cum 17.58
Stone chips - Cum 59.53
Local Sand - 3 KM( Lead 1K+2P) Cum 14.19
CONSTRUCTION OF COMMUNITY HALL CUM WORK SHED AT SILOUR MAHADALIT TOLA MOUZA -PAKRIBARAWAN, THANA NO. -45 , KHATA -2616 , KHESRA-4490 AT PAKRIWARABAN UTTARI PANCHAYAT UNDER BLOCK PAKRIWARABAN ,NAWADA
PROJECT : PROPOSED COMMUNITY HALL CUM WORK SHED WITH URINAL & WATER POINT AT NAWADA
ABSTRACT OF COST FOR CIVIL WORKS
FOR , BIHAR MAHADALIT VIKAS MISSION, PATNA
ITEMS COVERED UNDER( S.O.R. -B.C.D 01.01.2022)
SL.NO DESCRIPTION UNIT QTY. Rate AMOUNT
1 20.2.1 Boring, Providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :
20.2.1 300 mm dia piles metre 902.6
2 2.29 Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m
2.29.1 All kinds of soil. 100sqm 1355.4
3 2.8 Earth work in excavation in foundtion trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
2.8.1 All kinds of soil Cum 360.7
4 2.26 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead. Cum 123.9
5 2.28 Supplying and Filling in plinth with local sand and under floors including watering, ramming consolidating and dressing complete. cum 287.3
6 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level:
4.1.3 1:2:4(1 Cement:3 coarse sand: 6 graded stone aggregate 20mm nominal size) cum 3998.1
7 4.1.8 1:4:8(1 Cement:4 coarse sand: 8 graded stone aggregate 20mm nominal size) cum 2975.2
8 5.9.1 Centering and shuttering including strutting, proping etc. and removal of form work for:
5.9.1 Foundations, footings, bases for columns Sqm 211.1
9 4.11 Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4(1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size). Sqm 245.6
10 4.12 Extra for providing and mixing water profing material in cement concrete work in the proportion recommended by the manufacturers. per 50 kg cement 57.16
11 5.1 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring ,shuttering ,finishing and reinforcement-All work puto plinth level
5.1.2 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) cum 4688.3
12 5.2 Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement.
5.2.2 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Cum 5670
13 5.3 Reinforced cement conrete work in beams, suspended floors, roofs having slope upto 15, landings,balconiec, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excludingthe cost of centring, shuttering, finishing and reinforement with 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size). cum 5335.9
14 5.33B.4 Add or deduct for providing richer or leaner mixes respectively at all floor levels Providing M-15grade R.C.C instead of M-20 grade R.C.C. cum 383.8
15 5.9 Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete. Sqm 211.6
5.9.3 Suspended floors, roofs, landings, balconies and access platform. sqm 437.5
5.9.4 Shelves (Cast in situ) sqm 437.5
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers. sqm 404.7
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts. sqm 494.4
5.9.16 Edges of slabs and breaks in floors and walls.
5.9.16.1 Under 20cm wide Metre 130.2
5.9.19 Weather shade, Chajjas, corbels, etc. including edges. sqm 550.9
16 5.11 Extra for additional height in centring, shuttering where ever required with adequate bracing, propping etc. including cost of de-shutering and de centring at all levels over a height of 3.5 m ,for every additional height of 1 metre or part thereof (Plan area to be measured)
5.11.1 Suspended floors, roots, laning, beams and balconies (Plan area to be measured) sqm 174
17 5.22 Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.
5.22.1 Mild steel 6.00mm dia Kg 96.7
5.22.7A Thermo-Mechanically Treated bars TMTC-500-8mm dia Kg 94.5
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia Kg 92.6
5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia Kg 90.8
5.22.7D Thermo-Mechanically Treated bars TMTC-500-16mm dia Kg 91.7
18 6.1A Brick work with bricks of class designation 100A in foundation and plinth in:
6.1.14A Cement mortar 1:6(1 cement:6 coarse sand) cum 4819.9
19 6.3A Extra for Brick work in superstructure above plinth level upto floor V Level cum 842.2
20 6.13A Brick work 7cm thick with F.P.S brick of class designation 100A in cement mortar 1:3(1 cement: 3 coarse sand) in superstructure. sqm 482
21 6.18A Half brick masonry with bricks of class designation 100A in foundations and plinth in :
6.18.4A Cement mortar 1:4 (1 cement: 4 coarse send) sqm 599.3
22 6.19A Extra for half Brick masonry in superstructure above pinth level upto floor V level. sqm 89.7
23 6.21A Extra for providing and placing in position 2 nos. 6mm dia, MS bars at every third course of half brick masonry (with F.P.S bricks) sqm 113.6
24 10.14.1 Providing and fixing T-iron frame Kg 110.4
25 10.5.2 Providing and fixing 1 mm thick M.Sheet sqm 3467.9
26 9.48.1 P& F M.S grills Kg 144.5
27 10.18 Providing and fixing circular cast iron box for ceiling fan clamp 140 mm internal dia, 73 mm height, 5 mm thick rim bottom and top lids, 1.5 mm thick M.S sheet with its top surface hacked for proper bonding top lid shall be screwed into the cast iron box by means of 3.3 mm dia round headed screws, one ;pcf at the corners. Clamps shall be made of 12 mm dia M.S. bar bent to shape as per standard drawing. Each 165.4
28 10.32 Steel work welded in built up sections/framed worK including cutting hoisting, rixing in position and applying a priming coat of approved steel primer using structural steel, etc. as required.
10.32.2 In gratings, frames, guard bar, ladders, Kg 114.6
29 10.33 Providing and fixing hand rail by welding etc. to steel ladder railings & staircases railing including applying apriming coat of approved steel primer
10.33.3 G.I pipes 40mm nominal bore(class B) Kg 150
30 11.3 Cement concrete flooring 1:2:4(1 cement:2 coarse:sand:4 graded stone agregate) finished with a floating coat of neat cement including cement slurry, etc. but excluding the cost of nosing of steps etc. complete.
11.3.1 40 mm thick with 20 mm nominal size stone aggregate sqm 289.1
31 11.6 Cement plaster skirting (upto 30 cm hieght) with cement mortar 1:3 (1 cement:3 coarse sand) finished with a floating coat of neat cement
11.6.1 18 mm thick sqm 304.15
32 11.13 Providing and fixing glass strips in joints of terrazo/cement concrete floors.
11.13.1 40 mm wide and 4 mm thick metre 56.1
33 11.38 Providing and laying Ceramic glazed floor tiles 300x300mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS:15622 of approved make in all colours, shades, except White, Ivory, Grey, Fume Red Brow laid on 20mm thick bed of Cement Mortar 1:4 (1 Cement: 4 Coarse sand) including pointing the joints with white cement and matching pigments etc. complete. sqm 862.4
34 11.36 Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS:15622(thickness to be specified by the manufacture) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12mm thick bed of cement Mortar 1:3(1 cement: 3 coarse sand ) and jointing with grey cement slurry @ 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete. sqm 795
35 11.72 Providing designation 100A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/I. sqm 283.3
36 11.76 Providing average 150mm thick dry rammed khoa beaten to 112mm (compacted with water) made of well burnt or jhama bricks including ramming properly till compacted thickness is achieved, curing and carriage of water with all leads, making proper slope and blinding the top with cement mortar (1: 10) all complete as per building specification and direction of E/l, sqm 388.3
37 12.39 Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4( 1 cement: 2 coarse sand: 4 graded stone aggregate of 20mm nominal size) over P.V.C sheet 1mx1mx400 micron, finished with 12mm cement plaster 1:3(1 cement: 3 coarse sand) and a coat of neat cement rounding the edge sand making and finishing the outlet complete. Each 189.4
38 13.11 12mm cement plaster of mix:
13.11.4 1:6(1 cement: 6 coarse sand) sqm 141.5
39 13.12 15mm cement plaster on the rough side of single or half brick wall of mix:
13.12.4 1:6(1 cement: 6 course sand) sqm 162.8
40 13.24 6mm cement plaster to ceiling of mix:
13.24.2 1:4( 1 cement: 4 coarse sand) sqm 125.6
41 13.17.1 12 mm C.P with punning
1:3 (1 cement: 3 corse sand) sqm 203.6
42 13.7 White washing with lime to give an ever shade
13.70.1 New work (three or more coats) sqm 18.9
43 13.79 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade
13.79.1 New work (three or more coats) sqm 81.2
44 13.81.3 With ready mixed red oxide zinc chromate yellow primer of approved brand and manufacture on steel galvanised iron/steel works sqm 34.6
45 13.94 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:
13.94.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. sqm 116.5
46 13.116 Forming groove of uniform size from 12x12mm and upto 25x15mm in plastered surface as per approved pattern using wooden battens, nailed to the under layer including removal of wooden battens, repairs to the edges of plaster panel and finishing the groove complete as per specifications and direction of the Engineer-in-Charge. Metre 47.1
47 13.17.1+13.36.1 12 mm thick cement plaster with water proofing in cm (1:3) with neat cement punning…E/I. (over tarrece) sqm 212.6
48 11.77 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. sqm 721.1
49 2.25(A) Excavating,supplying and filling of local earth by mechanical transport up to lead of 3 km cum 411.7
50 Carriage of Materials:-
Bricks -8 KM(local lead 1K+7P) %0 nos 950.96
Coarse sand 10 km (P ) Cum 461.14
Stone chips 86 km (P) Cum 2053.89
Local Sand - 3 KM( Lead 1K+2P) Cum 316.34
Cement M.T 323.69
steel M.T 323.69
ADD EXTRA 5.36% GST
51 Add s.f.of materials:-
Bricks %0 nos 485.2
Coarse sand Cum 17.58
Stone chips Cum 59.53
Local Sand Cum 14.19
LAEO WD-01 NAWADA LAEO WD-01 NAWADA
S.O.R w.e.f 17.10.2016 Say Rs.
Materials Lead Houlage with O.H & C.P Loading/ Unloading with O.H &C.P Add 14.05%GST CARRIAGE COST
Ls Lu Lk Hs Hu Hk Labour Cess(%) with O.H &C.P
STONE CHIPS 182 0 1 192.9 1
CORSE SAND 69 0 1 192.9 1
LOCAL SAND 2 0 1 192.9 1
CEMENT 3 0 0 203 1
9.4 Ls= Lead on surface road Hs = Houlage on surface road
11.3 Lu= Lead on unsurface road Hu= Houlage on unsurface road
22.8 Lk= Lead on kuchcha road Hk = Houlage on kuchcha road
RATE OF AS PER SOR OF RCD , DATED : 20.9.18
Domchanch to Kodarma rly st
STONE CHIPS 16 0 1 1
Danapur to work site
STONE CHIPS 59 0 0 1
PROJECT : PROPOSED COMMUNITY HALL CUM WORK SHED
ABSTRACT OF COST FOR BOUNDARY WALL
FOR , BIHAR MAHADALIT VIKAS MISSION, PATNA
BASED ON S.O.R. B.C.D.GOVT. OF BIHAR EFFECTIVE FROM 01/01/2022
SL.NO DESCRIPTION UNIT RATE QTY. AMOUNT
1 20.2.1 Providing and installing cast in situ single under reamed piles R/M 902.6
2 2.8.1 P/V earth work excavation in foundation trench……as per E/I. cum 360.7
3 2.28 Supplying and Filling in plinth with local sand and under floors including watering, ramming consolidating and dressing complete. cum
4 11.72 Providing designation 100A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/I. sqm
5 5.1 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work puto plinth level
5.1.3 1:2:4(1 cement: 2 coarse sand:4 graded stone aggregate 20 mm nominal size) cum 4232.4
6 5.2 Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement.
5.2.2 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) Cum
7 5.3 Reinforced cement conrete work in beams, suspended floors, roofs having slope upto 15, landings,balconiec, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excludingthe cost of centring, shuttering, finishing and reinforement with 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size). cum
8 5.33B.4 Add or deduct for providing richer or leaner mixes respectively at all floor levels Providing M-15grade R.C.C instead of M-20 grade R.C.C. cum
9 5.9 Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.1 Centering&shuttering in foundation trench…. sqm 211.6
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers. sqm
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts. sqm
10 5.22 Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.
5.22.1 Mild steel 6.00mm dia Kg 0
5.22.7A Thermo-Mechanically Treated bars TMTC-500-8mm dia Kg
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia Kg
5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia Kg
5.22.7D Thermo-Mechanically Treated bars TMTC-500-16mm dia Kg
11 6.1A Brick work with bricks of class designation 100A in foundation and plinth in:
6.1.14A Cement mortar 1:6(1 cement:6 coarse sand) cum
12 9.48 Providing and fixing M.S grills of required pattern in frames of windows etc. with M.S flats, square or round bars etc. all complete.
9.48.2 Fixed to openings / wooden frames with rawl plugs screws etc. Kg 161.1
13 10.32 Steel work welded in built up sections/framed worK including cutting hoisting, rixing in position and applying a priming coat of approved steel primer using structural steel, etc. as required.
10.32.2 In gratings, frames, guard bar, ladders, Kg
14 13.12 15mm cement plaster on the rough side of single or half brick wall of mix:
13.12.4 1:6(1 cement: 6 course sand) sqm
15 13.79 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade
13.79.1 New work (three or more coats) sqm
16 13.81 Applying priming coat:
17 13.94 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:
13.94.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. sqm
18 Carriage of Materials:-
Bricks -8 KM(local lead 1K+7P) %0 nos
Coarse sand 10 km (P ) Cum
Stone chips 86 km (P) Cum
Local Sand - 3 KM( Lead 1K+2P) Cum
Steel m.t 323.69
cement m.t 323.69 1.04
ADD EXTRA 5.36% GST
19 Add s.f.of materials:-
Bricks %0 nos 485.2
Coarse sand Cum 17.58
Stone chips Cum 59.53
Local Sand Cum 14.19
LAEO WD-01 Nawada LAEO WD-01 Nawada
DETAIL ESTIMATE OF CONSTRUCTION OF SEPTIC TANK AND SOAK PIT
PROPOSED COMMUNITY HALL , BIHAR MAHADALIT VIKKASH MISSION,PATNA
Estimated Cost:
SL Ref. NO L B H Quantity Unit Rate(m2/m3) Amount in Rs.
1 2.8.1 Providing earth work in excavation
Septic tank 1 2.95 1.85 1.82 cum
Soakpit 1 3.35 2.13 cum
2 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete.
Septic tank 1 0.075 cum
Soakpit 1 4.14 0.5 0.075 cum
3 11.72 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l,
Septic tank 1 2.95 1.85 sqm
Soakpit 1 4.14 0.5 sqm
Total sqm 283.3
4 4.1.3 Providing P.C.C(1:2:4) in F&P ……do….do…..all complete job
Septic tank 1 2.95 1.85 0.15 cum
Soakpit 1 4.14 0.5 0.15 cum
5 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring,shuttering,finishing and reinforcement-All work puto plinth level 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Cover slab(S/T) 1 2.8 1.7 0.1 cum
Bend(S/T) 3 1.5 0.125 0.15 cum
Cover slab(S/P) 1 2.47 0.1 cum
6 6.1.12/1 Providign 100A B/W(1:4) in superstructure etc. all complete job.
Septic tank 2 2.8 0.25 1.5 cum
Total cum 5017.9
7 6.1.14A Providign 100A B/W(1:6) in superstructure etc. all complete job.
Soakpit 1 4.14 0.25 2.43 cum
8 6.18.4A P/V 100A half brick massonary in c.m (1:4) in foundation trench up to plinth…
Septic tank 1 1.2 0.45 sqm
Total sqm 599.3
9 5.9.1 P/V centering and shuttering in foundation trench….
Cover slab 2 2.8 0.1 sqm
Bend 6 1.2 0.15 sqm
Total sqm 211.6
10 5.22.7B Providing M-S reinfrocement etc .all complete job.
RCC qty vide item no 05 cum
75.00 kg per cum Total Kg
11 13.17.1 12 mm cement plaster 1:3( 1 cement: 3 coarse sand) finished with a floating coat of near cement
Septic tank 2 2.3 1.5 sqm
Total sqm 203.6
12 0285D 63 mm size brick aggrigate outer side of soak pit
13 Carriage of materials
a)Brick(8 KM) Nos.
b) local sand (3 km.) cum
c)Coarse sand (10km) cum
d) Stone chips(86km) cum
e)Cement 0.08 M.T 323.69
f)steel 1.37 M.T 323.69
ADD EXTRA 5.36% GST
14 S.F. of material
a)Brick(8 KM) Nos.
b) local sand (3 KM.) cum
c)Coarse sand (10km) cum
d) Stone chip(70km) cum
LAEO WD-01 Nawada LAEO WD-01 Nawada
Consumtion of material
S no Item Qty Unit Cement Chips Sand Brick L.Sand
MT cum cum nos cum
1 Local sand filling cum
4 Half brick work(1:4) sqm
5 PCC 1:2:4 cum
7 Brick Flat Soling sqm
8 150 mm thick Dry rammed khoa 0 sqm
9 52 mm thick Concrete flooring (1:2:4) 0 sqm
10 12 mm plaster 1:3 with punning sqm
11 15 mm plaster 1:6 0 sqm
12 6 mm plaster 1:4 0 sqm
Detailed Estimate of CIVIL Works
SL NO ITEM NO DESCRIPTION UNIT NO LENGTH WIDTH H/D QUANTITY
1 20.2 Providing and installing cast in situ single under reamed piles
20.2.1 300 mm dia pile
2.29.1 Surface dressing of the ground
Total Qty. in term of 100sqm
2.8.1 Earth work in excavation in foundation
Trench for ramp cum 1 9.4 0.65 1
Trench for ramp cum 3 1.05 0.65 1
2.26 Earth work in back filling
Total E/W in excavation cum
Less local sand filling in foundation cum
LessPCC in foundation cum
LessRCC in foundation cum
2.28 S/Filing Local sand in Foundation&Plinth
Sub Total of (a ) cum
plinth area sqm 1 9.14 9.14
Room sqm 1 3.55 3.3
Urinal sqm 2 1.35 2
Landing platform sqm 1 3 1.5
Total plinth area sqm 0.75
Qty of sand cum 0.75
Ramp cum 1 6 1.5
under step cum 1 3.45 0.000 0.1
under step cum 2 1.35 0.475 0.1
lesss Urinal cum 2 1.35 2 0.45
Less PCC in plinth cum 0.1
Less RCC in tie beam cum
Less brick work in plinth cum
Sub Total of (b ) cum
Total sand filling(a+b) cum
Room:- cum 1 3 3 0.075
Toilet:- cum 2 1.5 1.1 0.075
Sub total:- cum
(b)in plinth under floor:-
Ramp sqm 1 5.8 1.25
under step sqm 1 3.2 1.075
under step sqm 2 1.05 0.325
Sub Total of PCC area sqm
Qty of PCC in plinth cum 0.075
PCC band over Ramp wall cum 1 11.55 0.25 0.05
Tube well platform cum 1 1.2 1.2 0.075
Sub total:- cum
Total PCC Qty:- cum (a+b)
7 4.1.8 PCC 1:4:8 in foundation
8 5.9.1 Centering and shuttering for PCC work
PCC band over Ramp wall sqm 1 0.1
Tube well platform sqm 1 0.175
4.11 Providing 50 mm th. DPC at plinth level sqm 21.39 0.25
4.12 Extra for providing water proofing material per 50 kg of cement… 0.32
5.1 Prov.RCC M20
5.1.2 All work up to plinth level
Ramp trench cum 1 9.4 0.5 0.125
Ramp trench cum 3 1.05 0.5 0.125
along grid-A,B,C cum 3 7.94 0.25 0.3
along grid-C' cum 1 1.1 0.25 0.3
along grid-D cum 1 3.05 0.25 0.3
along grid-D' cum 1 1.1 0.25 0.3
along grid-E cum 1 1.5 0.25 0.3
along grid-1 cum 1 11.02 0.25 0.3
along grid-1' cum 1 0.000 0.25 0.3
along grid-2 cum 1 12.12 0.25 0.3
along grid-2' cum 1 1.5 0.25 0.3
along grid-3 cum 1 8.11 0.25 0.3
along grid-4 cum 1 8.11 0.25 0.3
Sub total of tie beam cum
(c ) Column cum
Column C1 cum 4 0.25 0.25 0.375
Column C2 cum 2 0.25 0.35 0.75
Column C3 cum 12 0.3 0.3 0.75
Sub total of column cum
Total RCC up to plinth (a+b+c) cum
12 5.2 All work from plinth level upto floor V level
5.2.2 (a)Walls columns, pillars, posts cind struts
13 5.3 roof beam, Roof slab,Lintel,Stair case,Chajja, Band
(i) Lintel level beam
along grid-A cum 1 7.94 0.25 0.25
along grid-C cum 1 4.99 0.25 0.25
along grid-C cum 1 2.97 0.25 0.25
along grid-C' cum 1 1.1 0.25 0.25
along grid-D cum 1 3.05 0.25 0.25
along grid-D' cum 1 1.1 0.25 0.25
along grid-E cum 1 1.5 0.25 0.25
along grid-1 cum 1 11.02 0.25 0.25
along grid-1' cum 1 0.000 0.25 0.25
along grid-2 cum 1 4.01 0.25 0.25
along grid-2' cum 1 1.5 0.25 0.25
along grid-4 cum 1 8.11 0.25 0.25
sub total of Lintel beam cum
(ii) Gr. Floor roof beam cum
along grid-A,B,C cum 3 7.94 0.25 0.4
along grid-D cum 1 3.05 0.25 0.4
along grid-1 cum 1 11.02 0.25 0.4
along grid-2 cum 1 11.02 0.25 0.4
along grid-3 cum 1 8.11 0.25 0.4
along grid-4 cum 1 8.11 0.25 0.4
sub total of Gr. Floor roof beam cum
Total of beam cum
(i) Gr. floor roof slab
Slab area (hall) sqm 1 9.14 9.14
Slab area (room) sqm 1 3.55 3.3
Slab area (toilet) sqm 2 1.5 1.1
Gr. Floor roof area sqm
floor slab cum 0.125
Projection slab 1 43.8 0.15 0.125
Less -1st floor beam 1 65.13 0.25 0.125
sub total of Gr. Floor roof slab cum
(d )Lintel & band - over 250mm thick wall
(i) Lintel over 250mm thick wall
(ii) band over 250mm thick wall
parapet 0 0 0 0.1
parapet 0 0 0 0.1
(iii) Lintel over 125mm thick wall
(iv) band over 125mm thick wall
parapet 0 0 0 0.1
parapet 0 0 0 0.1
Total in Lintel(d ) cum 0.24
chajja cum 1 42.94 0.45 0.075
Sub Total (f) cum
(g) Shelves cast in situ cum
T.V.shelf cum 1 1.7 0.425 0.075
T.V.shelf cum 1 1.7 0.3 0.075
Sub Total (g) cum
Total of Beam, Slab ,etc cum
14 5.35 Add for using extra cement in the items of design mix
Total in quintel quintel
15 5.9 Centering&shuttering
5.9.1 Foundation
Ramp trench sqm
Ramp trench sqm
5.9.3 Roof&landing
5.9.4 Shelves (Cast in situ)
Shelves sqm 1 1.2 0.336
Tie beam at EGL sqm 1 72.53 0.6
Lintel level beam sqm 1 42.15 0.75
Roof beam sqm 1 45.13 0.925
column up to plinth
Column avove plinth sqm
5.9.15 lintel (up to 1.5m span)
Lintel 1 0 0.55 .
Lintel 1 0 0.425
band at plinth level 1 0
band at Lintel level 1 0 0.2
band at parapet level 1 0.2
5.9.16.1 Edges of slab under 20 cms wide
face of chajja sqm 1 44.14 0.45
5.11.1 Extra for additional height in centring,
Roof slab sqm 1
Roof slab sqm 1
Projection slab sqm 1 42.02 0.15
5.22 Reinforcement for RCC work
300 mm dia pile:
pile: cum 1 0.7857
Less in stem cum 32 0.7857 0.375
under ream cum 0.999
Total of 300 mm dia pile Conc. cum
Pile 300mm dia kg 57.03
Pilecap kg 10.89 80.15
Tie beam kg 5.44 115.3
Column kg 6.27 129.54
Lintel ,staircase,chajja,stiffner etc kg 1.87 150.38
Total Reinforcement kg 0 .
5.22.1 Ms 6 mm dia kg 0 0 0
5.22.7A TMT 8mm dia kg 0.199%
5.22.7B TMT 10mm dia kg 0.639%
5.22.7C TMT 12 mm dia kg 0.000%
5.22.7D TMT 16mm dia kg 0.079%
GR Floor area sqm 100.65
Mumty sqm 0 0 0
Total area - sqm
i.e. Per Sqm of roof area cum
Check:- steel Kg
Steel In KG Per Sqm of Roof area kg
Steel - In Kg Per Cum of RCC kg
% of steel-along with RCC(by volume) %
6.1.14A 100A Brick work in Cm 1:6 in F/p
(a) in foundation & plinth
Front step cum 1 3 1 0.45
In ramp foundation cum 1 1.4 0.25 0.75
Sub total of(a-i) cum
External cum 1 0.25 0.35
Ramp platform cum 1 4.5 0.25 0.75
Sub total of(a-ii) cum
Total of (a) cum
Gr floor cum 1 16.99 0.25 3.075
Toilet wall cum 1 4.4 0.25 2.3
Less 125mm th wall cum 1 1.2 0.25 2.1
Total B/W inS/S cum
Total of (a+b) cum
6.3A Extra for Brick work in superstructure above plinth level
Total B/W inS/S cum
6.13A 7 cm Brick work with bricks ofclass 100A in CM
1:3 in superstructure
in sailing coarse along parapet
main sqm 1 1.2 1.2
Below T.V. floor sqm 1 1.2 0.83
6.18.4A Half brick work with bricks of100 in cm 1:4
Total 125 mm Th B/W up to plinth sqm
Gr floor sqm 2 1.5 2.515
above terrace sqm
Parapet sqm 1 41.74 0.15
Total 125 mm Th B/W inS/S sqm
6.19A Extra for half Brick masonry in superstructure above pinth level
6.21A Extra for providing 2 nos 6 mm dia ms bars
Qty same as 125 mm Th B/W sqm
10.14.1 Providing and fixing T-iron frame
wardrobe:- R/M 4 1.3
for toilet:- R/M 2 0.000
for room door:- R/M 1 5.35
for window:- R/M 1 4.15
Total:- @ 3.5 kg /m Kg
10.5.2 Providing and fixing 1 mm thick M.Sheet
wardrobe:- sqm 1 1.2 1.2
for toilet:- sqm 2 0.75 2.13
for room door:- sqm 1 1.07 2.13
for window:- sqm 1 0.915 1.22
9.120.1 Providing and fixing factory made panel PVC door shutter
DSR wardrobe:- 0 0.74 2.085
9.142 P/F non decorative flush door shutter
9.142.2 35mm thick non decorative flush door shutter
9.21.3 25mm thick non decorative flush door shutter
Parapet 0 1.2 2.055
9.82 P& F M.S grills
9.82.1 For ventilator:- sqm 2 0.6 0.6
For window:- sqm 1 0.9 1.22
Wt of grill @ 15 kg per Sqm of grill area kg 0.0
9.79 P & F cupboard or ward robe locks
9.95 Providing and fixing aluminium but hinge
9.96 P&F Alluminium sliding door bolt
9.96.1 300x16 mm nos
9.96.4 250x16 mm nos
9.976 P&F Alluminium sliding tower bolt
9.97.1 300x10mm nos
9.97.2 150x10mm nos
9.1 P&F Alluminium handles
9.101.2 P&FAlluminium hanging floor door stopper nos
9.103 Bright finished 100mm mortice lock nos 0
9.104 Providing and fixing aluminium tee curtain rod
10.12.1 P&F steel windows& ventilator
10.13 Extra for steel beading
10.13B steel windows - Sqm
10.13c steel ventilator -
10.15.1 Providing and fixing pressed steel door
10.21 Providing and fixing circular cast iron box for ceiling fan clamp nos 7
10.28 Steel window fastner nos 0
10.29 Steel window peg stays nos 0
10.32.2 Steel work welded in built up sections
Ramp railing 1 10.5 0.9
Total railing area sqm
(Wt. @ 18kg per sqm m)
10.33.3 40mm dia G.I pipe in stair hand rail
(Wt. @3.72 kg per m) Total kg
11.3.1 40 MM Th.Cement concrete flooring 1:2:4(
Hall sqm 1 8.98 8.76
below T.V. shelf sqm 1 1.2 0.25
room sqm 1 3.05 3
Door sill D1 sqm 1 1.05 0.25
Ramp platform sqm 1 3 1.5
ramp sqm 1 6 1.5
Ent step sqm 4 3.05 0.25
back step sqm 2 1 0.25
Tube well platform sqm 1 1.2 1.2
11.6.1 18 mm th.Cement plaster 1:3 in skirting
Side of below T.V. shelf R/M 2 0.3
column R/M 8 1.2
Total length of skirting R/M
skirting sqm 0.15
Tube well platform sqm 1 4.8 0.05
Total skirting sqm
11.13.1 Providing and fixing glass strips
glass [email protected] m/sqm of floor area
Vide-11.4.2 R/M 2.5
11.38 Providing and Laying 300 x300 mmCeramic
glazed floor tiles in toilets
Urinal sqm 2 1.5 1.2
Sii D2 sqm 1 0.73 0.25
Sii D2 sqm 1 0.73 0.125
Total Ceramic glazed floor tiles sqm
11.36 Ceramic glazed wall tiles in dado
Urinal sqm 2 5.44 0.75
Door jambs sqm 4 0.075 0.75
Less D2 sqm 2 0.75 0.75
11.72 100A one brick flat soling in plinth
Foundation Vide-/4.1.3(a) sqm
Ramp trench sqm 1 9.25 0.5
Ramp trench sqm 3 1.05 0.5
under plinth Vide-/4.1.3(b) sqm 16.26
under tie beam sqm 1 55.25 0.25
For road:- sqm 1 15 3
11.76 Providing average 150mm thick dry rammed khoa
Vide-/2.28(b) sqm 0
Ramp sqm 1 8.25 1.25
under step sqm 1 3.2 1.075
under step sqm 2 1.05 0.325
Less plan area of beam at plinth sqm 1 72.53 0.25 0
Tube well platform 1 1.35 1.35
12.39 Making Khurras nos 2
13.11.4 12 mm thick Internal Cement Plaster
Hall:- sqm 4 8.48 1.525
Column:- sqm 18 0.3 2.14
Shelf:- sqm 2 1.2 0.3
Room:- sqm 4 3 3.63
Toilet:- sqm 4 1.1 2.92
Deduction:- sqm
12 mm C P (1:6) sqm (a-b)
13.12.4 15mm CP 1:6 in internal surfaces
External(all around) sqm 1 42.5 3.94
toilet wall sqm 4 1.35 2.94
chajja sqm 2 39.84 0.45
toilet chajja sqm 2 4.3 0.45
parapet sqm 1 41.74 0.000
Hall opening sqm 1 24 2.14
Total External plaster sqm
13.24.2 6mm CP 1:4 in ceiling
Hall sqm 1 8.46 8.43
T-Beam sqm 2 7.78 0.375
Toilet sqm 2 1.5 1.2
T.V. shelf sqm 2 1.2 0.3
13.17.1 12 mm cement plaster 1:3 with punning up to plinth.
Up to plinth:- sqm 1 12.32 0.8
13.70.1 White Lime wash
Vide-/13.11.4 sqm
Vide-/13.24.2 sqm
13.79.1 Water proof cement paint
External portion
vide-/13.11.4 sqm
vide-/13.24.2 sqm
Vide-/13.12.4 sqm
13.81 Applying priming coat
13.81.1 Pink or grey primer on wooden surfaces
wardrobe shutter 0 1.2 2.1 2.4
13.81.3 yellow primer on steel surfaces
qty vide /10.5.2 sqm
Total sqm 2.5 times of total area
13.94.1 synthetic enamel paint on wooden & steel
Door,window,M.sheet door sqm
2.5 times of total area
Railing sqm 1 10.25 0.9
window &ventilator grill sqm
13.116 Forming groove of12x12mm and up to
all around: horizontal R/M 1 45
13.17.1+13.36.1 12 mm thick cement plaster with water proofing in cm (1:3) with neat cement punning…E/I.
over tertrace sqm 1 8.73 8.76
61 11.77 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
62 2.25(A) Excavating,supplying and filling of local earth by mechanical transport up to lead of 3 km
62 MATERIAL CONSUMPTION
S.N. Item Unit Quan. Cement Sand S.C Bricks
(In MT) (M3) (M3) (Nos)
1 Local Sand cum
2 Brick Flat Soling sqm
4 125 Th. B/W 1:4 sqm
5 70 mmth B/W 1:3 sqm
6 PCC 1:2:4 cum
7 PCC 1:4:8 cum
8 PCC 1:3:6 cum 0
9 50mm DPC 1:2:4 sqm
10 RCC M20 cum 56.07
11 RCC M25 cum 0
12 12mm C.P 1:6 sqm
13 15mm C.P 1:6 sqm
14 20mm C.P 1:4 sqm 0
15 6mm C.P 1:4 sqm
16 12mm C.P 1:3 Neat sqm
17 40mm Th C.C. Flooring sqm
18 18mm Th C.P 1:3 In Skirting sqm
19 Ceramic Tiles in dado sqm
20 Kota+Marble Flooring sqm 0
21 Kota+Marble Skirting sqm 0
22 20mm Th C.P 1:3 In Water Proofing sqm 0
23 12 mm C.P (1:3)with water proofing Based Water Proofing cum
24 Ceramic floor tiles sqm
25 60 mm Paver block sqm 0
25 L.sand (cum)
Brick Flat Soling sqm
60 mm Paver block sqm
26 Brick bats in M3
120mm Th I.C. Based Water Proofing sqm 0
Dry rammed khoa sqm
LAEO WD-01 Nawada LAEO WD-01 Nawada
L.sand Cement Sand S.C Bricks
1 Local Sand M3 1
2 Brick Flat Soling M2 0.0153 38
12 Kota+Marble Flooring M2 0.2982 0.1999
13 Kota+Marble Skirting M2 0.2748 0.1999
14 Ceramic Tiles in dado M2 0.2484 0.015
15 20mm Th C.P 1:3 In Water Proofing M2 0.02 0.0238
16 120mm Th I.C. Based Water Proofing M2 0.4968 0.5599
17 Ceramic Floor Tiles M2 0.2484 0.1999
18 Mosaic Tiles in skirting over 12mm th.CP (1:3) M2 0.1468 0.121
19 Mosaic Tiles Flooring over 20mm th. (1:4) M2 0.268 0.224
Tube well & sanitary installation work
PROPOSED COMMUNITY HALL
CLINT-BIHAR MAHADALIT VIKKASH MISSION,PATNA
ESTIMATE OF COST (P.H.E. WORKS)
ITEMS COVERED UNDER( S.O.R. -B.C.D 01.01.2022)
S.N. Ref. Description Unit Quantity Rate Amount
SANITARY INSTALLATION
1 0.0 Providing and fixing white vitreous china water closet squatting pan (Indian type):
17.13.1 Long pattern W.C. pan of size 580mm 2 each 1192.8
2 SOR 17.35 Provding and fixing soil,waste and vent pipes
SOR 17.35.1 100 mm dia
SOR 17.35.1.1 Sand cast iron S & S pipe as per IS:1729 metre 4 978.3
3 SOR 17.40 Provding and fixing heel rest sanitary bend
SOR 17.40.1 100 mm dia
SOR 17.40.1.1 Sand cast iron S & S pipe as per IS:1729 Each 5 513.3
4 SOR 17.43 Provding and fixing single equal plain junction of required degree with access door ,insertion rubber washer 3mm thick ,bolt and nuts complete
SOR 17.43.1.1 Sand cast iron S & S pipe as per IS:1729 Each 2 671.2
5 SOR 17.56 Provding and fixing terminal guard
SOR 17.56.1 100 mm dia
SOR 17.56.1.1 Sand cast iron S & S pipe as per IS:1729 Each 2 392.9
RAIN WATER PIPE
6 SOR 12.78 Providing and fixing on wall face unplasticised-PVC (working pressure 4 Kgf per sqm) rain water pipes conforming to IS:4985including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion
SOR 12.78.2 110mm diameter Metre 8 257.5
7 SOR 12.79 Providing and fixing on wall face unplasticised -PVC moulded fittings/ accessories for unplasticised PVC rainwater pipes conforming to IS:4985 including jointing with seal ring conforming to IS:5382 leaving 10mm gap for thermal expansion.
SOR 12.79.1 Coupler
SOR 12.79.1.2 110mm Each 2 120
SOR 12.79.5 Bend 87.50
SOR 12.79.5.2 110mm bend Each 2 132
SOR 12.79.6 Shoe (Plain)
SOR 12.79.6.2 110mm Shoe Each 2 115.95
8 SOR 12.80 Providing and fixing unplasticised -PVC pipe clips of approved design to unplasticised-PVC rain water pipes by means of 50x50x50mm hard wood plugs, screwed with M.S screws of required length including cutting brick work and fixing in cement mortar 1:4( 1 cement: 4 coarse sand) and making good the wall etc. complete.
9 SOR 12.81 Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diameter and weighing not less than 440 grams. Each 2 47.9
1 SOR 2.10 Excavating trenches of required width for pipes, cables etc including excavation for sockets and dressing of sides, ramming of bottoms depth upto 1.5m ,including getting out the excavated soil , and then returning the soil as required,in the layers not exceeding 20 cm in depth including consolidating each deposited layers by ramming watering and desposing of surplus excavated soil as dirceted within a lead of 50m
(A) SOR 2.10.1.2 pipes cables etc exceeding 80mm dia but not exceeding 300 mm dia Metr. 6 391.7
2 SOR 19.6 Providing and laying non -pressure NP2 class(light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 including testing of joints etc. complete
(A) SOR 19.6.2 150 mm dia R.C.C. pipe Metr. 6 410.7
3 SOR 19.7 Constructing brick masonary manhole in cement mortar 1:4 (1 cement, 4 coarse sand.) R.C.C. top slab with1:2:4 mix(1 cement, 2 coars e sand, 4 graded stone aggregate 20 mm nominal size) foundation cocrete 1:4:8 mix (1cement, 4 coarse sand, 8 graded stone aggregate 40 mm nominal size.) inside plastering 12 mm thick with cement mortar 1:3 (1 cement, 3 coarse sand.) finished with floating coat of neat cement and making channels in cement concrete 1:2:4. finished with floating coat of neat cement complete as per standard design.
(a) SOR 19.7.1 Inside size 90x80cm and 45 cm deep including C.I. cover with frame ( light duty) 455x610 mm internal diamension tatal weight of cover and fram to be not less than 38 kg (weight of cover23 kg and weight of frame 15 kg )
SOR 19.7.1.1 With cmmon burnt clay F.P.S. (non modular)bricks with class designation 7.5 Each 1 7914.7
3 SOR 19.33 Constructing soak pit 1.20x1.20x1.20 filled with brick bats including S.W.drain pipe 100 mm diameter and 1.20 m long complete as per standard design
1 Boring / drilling bore well of required dia for casing / strainer pipe by suitable method prescribed in IS: 2800(part l) including collecting samples from different strata, preparing and submitting strata chart / bore log, including hire & machineries required for the job, all complete as per direction of Engineer - in - charge. upto 90 metre depth below ground level 300/250 mm dia bore hole for inserting of 125 mm dia U.P.V.C. casing pipe / slotted pipe U.P.V.C screen pipes for installation mark ll hand pump.
24.1.1.1 All types of soil
(i) From G.L. to 90 mtrs depth P/M 55 486.8 90
2 Providing all equipments and labour lowering 125 mm dia U.P.V.C. casing slotted U.P.V.C / U.V.C. ribbed screen pipe imperfect vertically confirming to the available strata ( slotted pipe / screen pipe area to be lowered in water bearing aquifer and as per direction of E/I at site and also where casing pipe will be lowered. P/M 53 20.2 88
Supplying fitting and fixing the following G.I. fitting of approved make and specification at work site copmlete job.
(a) 125 mm center guide Nos in each T/W. each 4 151.5
(b) 25 mm dia well plug . each 1 75.75
( c ) Clamp for 125 mm pipe. each 1 141.4
3 24.8 Gravel packing in tubewell construction in accordance with IS: 4097,including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. cum 1.3 1343.2
4 Carriage of pea gravel average 400 km lead. cum 1.3 5616.2
5 Supplying all materials labours and aquipments to seal T/W up to the depth of 10 mtrs below G.L. by stick clay to prevent contamination from surface from all complete job as per direction of E/I. each 1 50.5
6 Providing all material and labour and construction 1.85 mtrs dia circular PCC ( 1:2:4 ) UNICEF design platform with foot rest etc all complete. each 0 5950
7 Providing all materials, labours, equipments for construction PCC (1:2:4) 1drain as per specification and UNICEF design etc all complete job. P/M 2 671
8 Supplying all tools equipment and labour for flushing washing and developing the T/W to give clean and clear water and all complete job as per direction of E/I. L.S. 1 601.8
(a) Supplying all tools for lowering 32 mm dia G.I. pipe. P/M 30.5 20.12
(b) Fixing cylinder. each 1 218.5
( c ) Fixing India Marka ll hand pump. each 1 156.7
Cost of Materials:-
9 UPVC Ribbed strainer 125mm ( each of 3 mtrs in length ) conform to the I.S. 12818-1983/1992. each 2 1536
UPVC Pipe 125mm conform to I.S.12818-1983/1992. P/M 50 427 83
Hand Pump India Marka ll conforming to I.S.:15500 (pt-1to8) /2004 each 1 9192
G.I. Pipe 32mm confirming to I.S.:1239 (part 1-4) P/M 30.5 232
Cost of India Marka ll Hand pump (B)
Total Cost(A+B):-
ADD EXTRA 5.36% GST
DETAILED ESTIMATE OF CONSTRUCTION OF PROPOSED BOUNDRY WALL FOR CUMMUNITTY HALL -CUM- WORK SHED CAMPUS AT NAWADA.
SL NO ITEM NO DESCRIPTION UNIT NO LENGTH WIDTH H/D QUANTITY
Total length of boundary wall m 65
1 20.2 Providing and installing cast in situ single under reamed piles
20.2.1 300 mm dia pile m 30 2.43
2 2.8.1 Providing E/W in excavation in foundation trenches etc…..all com. Job
G.Beam cum 1 0.25 0.15
Deduction Pile cum 0.25 0.25 0.15
2.28 S/Filing Local sand in Foundation & Plinth
under tie beam cum 1 0.075
Total sand filling cum
11.72 100A one brick flat soling
under tie beam sqm 1 0.25
Deduction Pile sqm
5.1.3 Prov.RCC M15 up to plinth level
6 5.2.2 P/V RCC M20 IN Stiffner…. 30
7 5.3+5.33B.4 P/v R.C.C M20 in Top Band
Band cum 1 0.25 0.075
Copping cum 2 0.5 0.5 0.075
Less Entry Gate 1 3 0.25 0.075
Column cum 30 0.075
8 5.9 Centering&shuttering
5.9.1 G. beam sqm 2
column above to plinth C1 sqm 28 1
Top band sqm 2 0.075
Copping sqm 4 0.35 0.125
Deduction:-Stiffners 30 0.5 0.075
5.22 Reinforcement for RCC work
300 mm dia pile:
pile: cum 30 0.07
Pile 300 mm dia kg 85.15
Tie beam kg 48.87
Column kg 103.42
5.22.7A TMT 8mm dia kg 0.400%
5.22.7B TMT 10mm dia kg 0.200%
5.22.7C TMT 12 mm dia kg 0.400%
5.22.7D TMT 16mm dia kg 0.199%
6.1.14A 100A Brick work in Cm (1:6) in F/p
in foundation & plinth
L.H.S/R.H.S Wall cum 2 18 0.25 0.9
Frount wall cum 1 15 0.25 0.9
Back side wall cum 1 15 0.25 1.65
Less Gate cum 1 3 0.25 0.9
Less Column (Back side):- cum 8 0.25 0.25
Less Column (LHS/RHS):- cum 18 0.25 0.25
Less Column (Front):- cum 0.25 0.25 0.9
11 9.82 P& F M.S grills
9.82.2 Fixed to opening on wall (LHS/RHS) sqm 1.935 0.775
" (FROUNT) sqm 1.635 0.775
Wt of grill @ 15kg per Sqm of grill area 0.0
10.32.2 Steel work welded in built up sections
Grill gate 1 2.95 1.9
(Wt. @ 20kg per sqm )
13.12.4 15mm th. Cement Plaster with C.M(1:6)
inner side wall 1 14.5 1.975
Outer side wall 1 15
Wall top 1 61.5 0.25
side of Cloumn 8 1 0.1
Side of gate column 2 0.35 0.999
Copping 2 0.5 0.5
Less- Gate sqm 2 3
14 13.79.1 Water proof cement paint
Qty vide item no 13. sqm
15 13.94.1 synthetic enamel paint on steel
Qty vide item no 11
Qty vide item no 12 sqm
MATERIAL CONSUMPTION
S.N. Item Unit Quan. Cement Sand S.C Bricks
(In Mt) (M3) (M3) (Nos)
1 Local Sand cum
2 Brick Flat Soling sqm
4 R.C.C M15 cum
6 15mm C.P 1:4 sqm
Brick Flat Soling sqm
Junior Engineer Assistant Engineer Executive Engineer L.A.E.O, Nawada.
L.sand Cement Sand S.C Bricks
1 Local Sand M3 1
2 Brick Flat Soling M2 0.0153 38
12 Kota+Marble Flooring M2 0.2982 0.1999
13 Kota+Marble Skirting M2 0.2748 0.1999
14 Ceramic Tiles in dado M2 0.2484 0.015
15 20mm Th C.P 1:3 In Water Proofing M2 0.02 0.0238
16 120mm Th I.C. Based Water Proofing M2 0.4968 0.5599
17 Ceramic Floor Tiles M2 0.2484 0.1999
18 Mosaic Tiles in skirting over 12mm th.CP (1:3) M2 0.1468 0.121
19 Mosaic Tiles Flooring over 20mm th. (1:4) M2 0.268 0.224
PROJECT :PROPOSED COMMUNITY HALL CUM WORK SHED WITH URINAL & WATER POINT
NAME OF WORK : BOQ & ESTIMATE FOR ELECTRICAL INSTALLATION & FIXTURES
Sl. No sor no Item of work Unit Quantity Rate (Rs) Amount (Rs.) Remarks
1 Wiring for light point/ fan point/ exhaust fan point / call bell point with 1.5 Sq.mm FR PVC insulated copper conductor single core cable in surface/ recessed PVC conduit with piano type switch, modular plate, suitable size G.I. box and earthing the point with 1.5 sq mm FR PVC insulated copper conductor single core cable etc as required. Group- B a. Light/ call bell points - 27 b. Ceiling fan points - 07 c. Ex. Fan points - 02 Total - 36 Point 36 922 1.1.2 5
2 Supplying and fixing 3 pin 5/6 amps socket outlet & 6A switch piano type on the existing switch box including connections etc. as required. Point 3 112 1.24.4
3 Supplying and fixing suitable size GI/PVC box on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 5/6 amps socket outlet & 6A switch piano type connection painting etc. as required. Point 2 424 1.31
4 Supplying and drawing low resistance co-axial T.V cable RJ-6 grade copper conductor PE insulated, with PVC sheath in the existing PVC concuit etc. as required. Meter 10 42 1.17
5 Supplying and fixing piano type T.V antenna socket on the existing metal box including making connection, etc. as required. Each 1 74 1.23.7
6 Wiring for circuit/ submain wiring along with earth wire with the following sizes PVC insulated copper conductor, single core cable in surface / recessed PVC conduit as required. 1.7
2 x 1.5 sq. mm + 1 x 1.5 sq. mm earth wire (Circuit wiiring) Meter 90 201 1.7.1
4 x 6.0 sq. mm + 1 x 6.0 sq. mm earth wire Meter 30 660 1.7.11
7 Supplying and fixing metal box of following size in recess with suitable size of phenolic laminated sheet cover in the front including painting etc. as required. 1.22
75mmX75mmX60mm Each 4 139 1.22.1
MAIN PANEL & D.B.s
8 Supplying and fixing 8 way double door sinle pole and Neutral sheet steel M.C.B. D.B, 240 Volts in recess, complete with tinned copper busbar, neutral bus bar, earth bar, din bar , detachable gland plate, interconnection, phosphatized and powder painted including nting, earthing etc. as required ( But without MCB/ RCCB/Isolator)(UPS DB) Each 1 2591 2.8.6
9 Supplying and fixing of following rating C series MCB suitable for inductive and other loads of following poles in the existing MCB DB complete witth connections ,testing and commissioning etc. as required . 2.12
6 Amp. To 32 Amp. SP MCB 240 Volt Each 2 237 2.12.1
32 Amp SPN MCB 240 Volt Each 1 1044 2.12.3
10 Earthing with G.I earth pipe 4.5 mt. long 40mm dia including accessories and providing masonary enclosure with cover plate having locking arrangement and watering pipe etc. including providing salt and charcoal for pipe earth electrode as required. Set 1 6323 3.2
11 Providing and laying earth connections from earth electode with 4.00 mm. Dia copper wire in 15 mm. Dia G.I.pipe from earth electrode as required. Meter 5 367 3.13
12 Providing and fixing 25mmX5mm GI strip on surface for connection etc as required. Meter 5 195 3.15
13 Providing and fixing 4mm dia copper wire on surface or in recess for loop earthing etc as required. Meter 5 144 3.17
SUPPLY AND INSTALLATION OF FIXTURES
14 Supplying and fixing bulkhead fitting die cast aluminium alloy body with prismatic glass cover suitable for the GLS/CFL lamp directly on wall/ ceiling including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each 12 926 5.7
15 Supplying and fixing 2 pin 5 Amp ceiling rose on the existing junction box/ PVC box including connection etc as required. Each 7 64 1.33
16 Supplying and fixing batten / angle holder including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each 6 80 1.34
17 Supplying and fixing following types lamp in existing electrical fitting/ fixture etc as required. 6.1.7
20 watt CFL lamp Each 6 267
18 Supplying and installation of regular/standard model A.C. ceiling fan of 1200 mm sweep including wiring the down rods of stanard length ( upto 30 cm) with 1.5 sq. mm FR PVC insulated insulated copper conductor etc as required. Each 7 2482 8.15
19 Supply and Installation of 300 mm, 230 V A.C. exhaust fan in the existing opening, including making good the damage, including making good the damage, connection, testing, commissioning etc. as required. Each 2 2572 8.17.1
20 Supplying and fixing powder coated strip fitting complete with electronic ballast, 4'x20 watt fluorescent lamp etc. directly on ceiling / wall including connections with 1.5 sq.mm FR PVC insulated, copper conductor single core cable etc. as required. Each 7 762 5.3
ADD S.F 2% 1610
LAEO WD-01 Nawada LAEO WD-01 Nawada
1 Footing nos L B H/D no of col.
3 Area area Perimeter
plinth area sqm 1 9.14 9.14
Room sqm 1 3.55 3.3
Urinal sqm 2 1.35 2
Total sqm 48.56
4 plinth protection
Doors Gr 1st 2nd mumty Total Width H/D
W 1 0 0.9 1.2 Steel glazed
D&W having 125 mm th wall
Doors Gr 1st 2nd mumty Total
(Planning and Development Department , Govt. Of Bihar.)
District - Nawada
Block - Pakribarawan
Estimated Cost `
Construction of Ghaat in Badki pond near Inter school at Dumrawan village, panchayat :- Dumrawan under block Pakribarawan (Nawada).
Executive Engineer
L.A.E.O, Works Division-1
ANALYSIS OF RATE FOR CARRIAGE OF MATERIALS FROM SOURCE TO WORK SITE BY RAIL & BY ROAD
Sl.No. Materials Source Surfaced Road Lead Kutcha Road Lead Cost of Loading & Unloading Unit Per Trip Truck Capacity By Weight Per Trip Truck Capacity Multiplying Factor Per TripTruck Capacity (Net Payable Volume)
1 Stone Chips / Aggregate 69 1 192.9 Cu m 8 MT 5.4 cum 0.000 cum
Coarse Sand 9 1 Cu m 8 MT 5.4 cum 0.000 cum
Local Sand Local 2 1 Cu m 8 MT 5.4 cum 0.000 cum
Bricks Local 7 1 432.3 %0 Nos 8 MT 2000 Nos 1 2000 Nos
Cement Local 10 0 278 M T 8 MT 8 M T 1 8 M T
Steel Local 0 M T 8 MT 8 M T 1 8 M T
Haulage Rate Excluding Cost of Loading, Unloading & Stacking Unit : - Tonne.KM
I Surfaced Road 11.2
II Kutcha Road 27.2
Sl.No. Materials Haulage Cost Cost of Loading & Unloading Carriage Cost By Rail Total(P+K)+Loading & un loading Add GST14.05% Total Carriage CostIncluding1%cess.
Surfaced(P) Kutcha(K)
Stone Chips / Aggregate / x x = / x x 0"K12" = 195.1 0 1,477.77
Coarse Sand / x x = / x x = 195.1 0 400.33
Local Sand / x x = / x x = 195.1 0 274.62
Junior Engineer Assistant Engineer Executive Engineer
L.A.E.O Works Division-1 , Nawada
COMMUNITY HALL CUM WORK SHED AT NAWADA.
Detailed Estimate of CIVIL Works
SL NO ITEM NO DESCRIPTION UNIT NO LENGTH WIDTH H/D QUANTITY
1 20.2 Providing znd installing cast in situ single under reamed piles
20.2.1 300 mm dia pile
2.29.1 Surface dressing of the ground
Total Qty. in term of 100sqm
2.8.1 Earth work in excavation in foundation
Trench for ramp cum 1 9.4 0.65 1
Trench for ramp cum 3 1.05 0.65 1
2.26 Earth work in back filling
Total E/W in excavation cum
Less local sand filling in foundation cum
LessPCC in foundation cum
LessRCC in foundation cum
2.28 S/Filing Local sand in Foundation&Plinth
Sub Total of (a ) cum
plinth area sqm 1 9.14 9.14
Room sqm 1 3.55 3.3
Urinal sqm 2 1.35 2
Landing platform sqm 1 3 1.5
Total plinth area sqm
Qty of sand cum 0.9
Ramp cum 1 6 1.5
under step cum 1 3.45 0.000 0.1
under step cum 2 1.35 0.475 0.1
For Road cum 0 15 3 0.075
lesss Urinal cum 2 1.35 2 0.45
Less PCC in plinth cum 0.1
Less RCC in tie beam cum
Less brick work in plinth cum
Sub Total of (b ) cum
Total sand filling(a+b) cum
Room:- cum 1 3 3 0.07
Toilet:- cum 2 1.5 1.1 0.07
For Road cum 0 15 3 0.125
Sub total:- cum
(b)in plinth under floor:-
Ramp sqm 1 5.8 1.25
under step sqm 1 3.2 1.075
under step sqm 2 1.05 0.325
Sub Total of PCC area sqm
Qty of PCC in plinth cum 0.075
PCC band over Ramp wall cum 1 11.55 0.25 0.05
Tube well platform cum 1 1.2 1.2 0.075
Sub total:- cum
Total PCC Qty:- cum (a+b)
7 4.1.8 PCC 1:4:8 in foundation
8 5.9.1 Centering and shuttering for PCC work
PCC band over Ramp wall sqm 1 0.1
Tube well platform sqm 1 0.175
4.11 Providing 50 mm th. DPC at plinth level sqm 21.39 0.25
4.12 Extra for providing water proofing material per 50 kg of cement… 0.32
5.1 Prov.RCC M20
5.1.2 All work up to plinth level
Ramp trench cum 1 9.4 0.5 0.125
Ramp trench cum 3 1.05 0.5 0.125
along grid-A,B,C cum 3 7.94 0.25 0.3
along grid-C' cum 1 1.1 0.25 0.3
along grid-D cum 1 3.05 0.25 0.3
along grid-D' cum 1 1.1 0.25 0.3
along grid-E cum 1 1.5 0.25 0.3
along grid-1 cum 1 11.02 0.25 0.3
along grid-1' cum 1 0.000 0.25 0.3
along grid-2 cum 1 12.12 0.25 0.3
along grid-2' cum 1 1.5 0.25 0.3
along grid-3 cum 1 8.11 0.25 0.3
along grid-4 cum 1 8.11 0.25 0.3
Sub total of tie beam cum
(c ) Column cum
Column C1 cum 4 0.25 0.25 0.6
Column C2 cum 2 0.25 0.35 0.000
Column C3 cum 12 0.3 0.3 0.000
Sub total of column cum
Total RCC up to plinth (a+b+c) cum
12 5.2 All work from plinth level upto floor V level
5.2.2 (a)Walls columns, pillars, posts cind struts
13 5.3 roof beam, Roof slab,Lintel,Stair case,Chajja, Band
(i) Lintel level beam
along grid-A cum 1 7.94 0.25 0.25
along grid-C cum 1 4.99 0.25 0.25
along grid-C cum 1 2.97 0.25 0.25
along grid-C' cum 1 1.1 0.25 0.25
along grid-D cum 1 3.05 0.25 0.25
along grid-D' cum 1 1.1 0.25 0.25
along grid-E cum 1 1.5 0.25 0.25
along grid-1 cum 1 11.02 0.25 0.25
along grid-1' cum 1 0.000 0.25 0.25
along grid-2 cum 1 4.01 0.25 0.25
along grid-2' cum 1 1.5 0.25 0.25
along grid-4 cum 1 8.11 0.25 0.25
sub total of Lintel beam cum
(ii) Gr. Floor roof beam cum
along grid-A,B,C cum 3 7.94 0.25 0.4
along grid-D cum 1 3.05 0.25 0.4
along grid-1 cum 1 11.02 0.25 0.4
along grid-2 cum 1 11.02 0.25 0.4
along grid-3 cum 1 8.11 0.25 0.4
along grid-4 cum 1 8.11 0.25 0.4
sub total of Gr. Floor roof beam cum
Total of beam cum
(i) Gr. floor roof slab
Slab area (hall) sqm 1 9.14 9.14
Slab area (room) sqm 1 3.55 3.3
Slab area (toilet) sqm 2 1.5 1.1
Gr. Floor roof area sqm
floor slab cum 0.125
Projection slab 1 43.8 0.15 0.125
Less -1st floor beam 1 65.13 0.25 0.125
sub total of Gr. Floor roof slab cum
(d )Lintel & band - over 250mm thick wall
(i) Lintel over 250mm thick wall
(ii) band over 250mm thick wall
parapet 0 0 0 0.1
parapet 0 0 0 0.1
(iii) Lintel over 125mm thick wall
(iv) band over 125mm thick wall
parapet 0 0 0 0.1
parapet 0 0 0 0.1
Total in Lintel(d ) cum
chajja cum 1 42.94 0.45 0.075
Sub Total (f) cum
(g) Shelves cast in situ cum
T.V.shelf cum 1 1.7 0.425 0.075
T.V.shelf cum 1 1.7 0.3 0.075
Sub Total (g) cum
Total of Beam, Slab ,etc cum
14 5.35 Add for using extra cement in the items of design mix
Total in quintel quintel
15 5.9 Centering&shuttering
5.9.1 Foundation
Ramp trench sqm
Ramp trench sqm
5.9.3 Roof&landing
5.9.4 Shelves (Cast in situ)
Shelves sqm 1 1.2 0.336
Tie beam at EGL sqm 1 72.53 0.6
Lintel level beam sqm 1 42.15 0.75
Roof beam sqm 1 45.13 0.925
column up to plinth
Column avove plinth sqm
5.9.16.1 Edges of slab under 20 cms wide
face of chajja sqm 1 44.14 0.45
5.11.1 Extra for additional height in centring,
Roof slab sqm 1
Roof slab sqm 1
Projection slab sqm 1 42.02 0.15
5.22 Reinforcement for RCC work
300 mm dia pile:
pile: cum 1 0.7857
Less in stem cum 32 0.7857 0.375
under ream cum 0.999
Total of 300 mm dia pile Conc. cum
Pile 300mm dia kg 57.03
Pilecap kg 80.15
Tie beam kg 115.3
Column kg 129.54
Lintel ,staircase,chajja,stiffner etc kg 150.38
Total Reinforcement kg 0
5.22.1 Ms 6 mm dia kg 0 0
GR Floor area sqm 100.65
Mumty sqm 0 0 0
Total area - sqm
i.e. Per Sqm of roof area cum
Check:- steel Kg
Steel In KG Per Sqm of Roof area kg
Steel - In Kg Per Cum of RCC kg
% of steel-along with RCC(by volume) %
6.1.14A 100A Brick work in Cm 1:6 in F/p
(a) in foundation & plinth
Front step cum 1 3 1 0.45
In ramp foundation cum 1 1.4 0.25 0.75
Sub total of(a-i) cum
External cum 1 0.25 0.75
Ramp platform cum 1 4.5 0.25 0.75
Sub total of(a-ii) cum
Total of (a) cum
Gr floor cum 1 16.99 0.25 3.075
Toilet wall cum 1 4.4 0.25 2.3
Less 125mm th wall cum 1 1.2 0.25 2.1
Total B/W inS/S cum
Total of (a+b) cum
6.3A Extra for Brick work in superstructure above plinth level
Total B/W inS/S cum
6.13A 7 cm Brick work with bricks ofclass 100A in CM
1:3 in superstructure
in sailing coarse along parapet
main sqm 1 1.2 1.2
Below T.V. floor sqm 1 1.2 0.83
6.18.4A Half brick work with bricks of100 in cm 1:4
Total 125 mm Th B/W up to plinth sqm
Gr floor sqm 2 1.5 2.515
above terrace sqm
Parapet sqm 1 41.74 0.15
Total 125 mm Th B/W inS/S sqm
6.19A Extra for half Brick masonry in superstructure above pinth level
6.21A Extra for providing 2 nos 6 mm dia ms bars
Qty same as 125 mm Th B/W sqm
10.14.1 Providing and fixing T-iron frame
wardrobe:- R/M 4 1.3
for toilet:- R/M 2 0.000
for room door:- R/M 1 5.35
for window:- R/M 1 4.15
Total:- @ 4.5 kg /m Kg
10.5.2 Providing and fixing 1 mm thick M.Sheet
wardrobe:- sqm 1 1.2 1.2
for toilet:- sqm 2 0.7 2.065
for room door:- sqm 1 1.02 2.065
for window:- sqm 1 0.85 1.15
26 9.82 P& F M.S grills
9.82.1 For ventilator:- sqm 2 0.6 0.6
For window:- sqm 1 0.9 1.22
Wt of grill @ 15 kg per Sqm of grill area kg 0.0
27 10.21 Providing and fixing circular cast iron box for ceiling fan clamp nos 7
28 10.32.2 Steel work welded in built up sections
Ramp railing 1 10.5 0.9
Total railing area sqm
(Wt. @ 18kg per sqm m)
10.33.3 40mm dia G.I pipe in stair hand rail
(Wt. @3.72 kg per m) Total kg
11.3.1 40 MM Th.Cement concrete flooring( 1:2:4)
Hall sqm 1 8.98 8.76
below T.V. shelf sqm 1 1.2 0.25
room sqm 1 3.05 3
Door sill D1 sqm 1 1.05 0.25
Ramp platform sqm 1 3 1.5
ramp sqm 1 6 1.5
Ent step sqm 4 3.05 0.25
back step sqm 2 1 0.25
Tube well platform sqm 1 1.2 1.2
11.6.1 18 mm th.Cement plaster 1:3 in skirting
Side of below T.V. shelf R/M 2 0.3
column R/M 8 1.2
Total length of skirting R/M
skirting sqm 0.15
Tube well platform sqm 1 4.8 0.05
Total skirting sqm
11.13.1 Providing and fixing glass strips
glass [email protected] m/sqm of floor area
Vide-11.4.2 R/M 2.5
11.38 Providing and Laying 300 x300 mmCeramic
glazed floor tiles in toilets
Urinal sqm 2 1.5 1.2
Sii D2 sqm 1 0.73 0.25
Sii D2 sqm 1 0.73 0.125
Total Ceramic glazed floor tiles sqm
11.36 Ceramic glazed wall tiles in dado
Urinal sqm 2 5.44 0.75
Door jambs sqm 4 0.075 0.75
Less D2 sqm 2 0.75 0.75
11.72 100A one brick flat soling in plinth
Foundation Vide-/4.1.3(a) sqm
Ramp trench sqm 1 9.25 0.5
Ramp trench sqm 3 1.05 0.5
under plinth Vide-/4.1.3(b) sqm
under tie beam sqm 1 55.25 0.25
For Road sqm 1 15 3
11.76 Providing average 150mm thick dry rammed khoa
Vide-/2.28(b) sqm 0
Ramp sqm 1 8.25 1.25
under step sqm 1 3.2 1.075
under step sqm 2 1.05 0.325
Less plan area of beam at plinth sqm 1 72.53 0.25 0
Tube well platform 1 1.35 1.35
12.39 Making Khurras nos 2
13.11.4 12 mm thick Internal Cement Plaster
Hall:- sqm 4 8.48 1.525
Column:- sqm 18 0.3 2.14
Shelf:- sqm 2 1.2 0.3
Room:- sqm 4 3 3.63
Toilet:- sqm 4 1.1 2.92
Deduction:- sqm
12 mm C P (1:6) sqm (a-b)
39 13.12.4 15mm CP 1:6 in internal surfaces
External(all around) sqm 1 42.5 3.94
toilet wall sqm 4 1.35 2.94
chajja sqm 2 39.84 0.45
toilet chajja sqm 2 4.3 0.45
parapet sqm 1 41.74 0.000
Hall opening sqm 1 24 2.14
Total External plaster sqm
13.24.2 6mm CP 1:4 in ceiling
Hall sqm 1 8.46 8.43
T-Beam sqm 2 7.78 0.375
Toilet sqm 2 1.5 1.2
T.V. shelf sqm 2 1.2 0.3
41 13.17.1 12 mm C.P (1:3) with punning
Up to plinth:- sqm 1 12.32 0.8
42 13.70.1 White Lime wash
Vide-/13.11.4 sqm
Vide-/13.24.2 sqm
13.79.1 Water proof cement paint
External portion
vide-/13.11.4 sqm
vide-/13.24.2 sqm
Vide-/13.12.4 sqm
13.81 Applying priming coat
13.81.3 yellow primer on steel surfaces
qty vide /10.5.2 sqm
Total sqm 2.5 times of total area
13.94.1 synthetic enamel paint on wooden & steel
Door,window,M.sheet door sqm
2.5 times of total area
Railing sqm 1 10.25 0.9
window &ventilator grill sqm
13.116 Forming groove of12x12mm and up to
all around: horizontal R/M 1 45
13.17.1+13.36.1 12 mm thick cement plaster with water proofing in cm (1:3) with neat cement punning…E/I.
over tertrace sqm 1 8.73 8.76
48 11.77 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
49 2.25(A) Excavating,supplying and filling of local earth by mechanical transport up to lead of 3 km
50 MATERIAL CONSUMPTION
S.N. Item Unit Quan. Cement Sand S.C Bricks
(In MT) (M3) (M3) (Nos)
1 Local Sand cum
2 Brick Flat Soling sqm
4 125 Th. B/W 1:4 sqm
5 70 mmth B/W 1:3 sqm
6 PCC 1:2:4 cum
7 PCC 1:4:8 cum
8 PCC 1:3:6 cum 0
9 50mm DPC 1:2:4 sqm
10 RCC M20 cum 56.07
11 RCC M25 cum 0
12 12mm C.P 1:6 sqm
13 15mm C.P 1:6 sqm
14 20mm C.P 1:4 sqm 0
15 6mm C.P 1:4 sqm
16 12mm C.P 1:3 Neat sqm
17 40mm Th C.C. Flooring sqm
18 18mm Th C.P 1:3 In Skirting sqm
19 Ceramic Tiles in dado sqm
20 Kota+Marble Flooring sqm 0
21 Kota+Marble Skirting sqm 0
22 20mm Th C.P 1:3 In Water Proofing sqm 0
23 12 mm C.P(1:3) with water proofing cum
24 Ceramic floor tiles sqm
25 60 mm paver block sqm 0
26 L.sand (cum)
Brick Flat Soling sqm
60 mm paver block sqm
27 Brick bats in M3
120mm Th I.C. Based Water Proofing sqm 0
Dry rammed khoa sqm
LAEO WD-01 Nawada LAEO WD-01 Nawada
L.sand Cement Sand S.C Bricks
1 Local Sand M3 1
2 Brick Flat Soling M2 0.0153 38
12 Kota+Marble Flooring M2 0.2982 0.1999
13 Kota+Marble Skirting M2 0.2748 0.1999
14 Ceramic Tiles in dado M2 0.2484 0.015
15 20mm Th C.P 1:3 In Water Proofing M2 0.02 0.0238
16 120mm Th I.C. Based Water Proofing M2 0.4968 0.5599
17 Ceramic Floor Tiles M2 0.2484 0.1999
18 Mosaic Tiles in skirting over 12mm th.CP (1:3) M2 0.1468 0.121
19 Mosaic Tiles Flooring over 20mm th. (1:4) M2 0.268 0.224
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 01 Year 2026-27.pdf
NIT • 4.95 MB
ACE Scanner_2026_05_02.pdf
NIT • 0.26 MB
NIT 01 Year 2026-27.pdf
NIT • 4.95 MB
GR-01.xls
NIT • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .