| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC | 1 | Accepted-AOC 1st Lowest | |
| 2 | 2₹2.9 L+₹48,708.03 (20.3%)Rejected-AOC | 2 | Rejected-AOC 2nd Lowest | |
| 3 | 3₹3.0 L+₹59,735.60 (24.8%)Rejected-AOC | 3 | Rejected-AOC 3rd Lowest |
Tender Value
₹3.9 L
EMD Value
₹3,860
Closing Date
16 Mar 2020, 4:00 pmClosed
Executive Engineer, RCC Upper Division Kathua
Executive Engineer, RCC Upper Division Kathua
Restoration of Channel Section of D-5 of Main Ravi, Canal between RD 9500 to 10100M at places.
2020_IFC_94744_3
e-Nit No 12/RCC Upper/RTIC Kathua 2019-20
Open Tender
Civil Works - Canal
Item Rate
30 days
kathua
As per SBD
4 documents required · 4 mandatory
₹200
Yes
Executive Engineer, RCC Upper Division Kathua
₹3,860
Yes
17 Sept 2020
10 Mar 2020
17 Mar 2020
10 Mar 2020
16 Mar 2020
11 Mar 2020
Amount
Clearing Jungle including uprooting of rank vegetation, grass, brushwood trees and saplings of girth up to 30 cm measured at height of 1m above ground level and removal of rubbish up to a distance of 50mtr. outside the periphery of the area cleared.
Silt clearance from canals Inclusive initial lead and lift(50M and 1.5m respectively) a/Dry
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50metres lead a)In cement mortar
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level. a)1:3:6(1cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) “Crushed”
Centering and shuttering including strutting, propping etc. and removal of from work for:-
Foundations, footings, bases of columns
Edges of slabs and breaks in floors and walls “under 20cms wide”
Dry stone pitching (any thickness) excluding cost of stones
On Horizontal
On slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregate; 20 mm nominal) @ (6〖 m〗^3)⁄(100〖 m〗^2 ) on horizontal/side slopes; complete including curing “Crushed”
Dumping stone excluding cost of stones In Horizontal on level
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 150 landing, balconies, shelves, chajjas, lintels, bands, plain window sills and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:2:4(1cement 2:coarse sand :4 graded stone aggregate 20mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Carriage of sand and stone aggregate below 40mm nominal size av. distance 15KM by Mech. Transport.
RAMANDEEP SINGH CONSTRUCTIONS
SHIVA CONSTRUCTION WORK
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .