Loading…
Loading…
Tender Value
₹5.4 L
EMD Value
₹10,864
Closing Date
5 Aug 2026, 6:00 pm
xen rew udhampur
xen rew udhampur
BOQ
2026_RDPR_316868_10
e-NIT No. 65 REW UDHAMPUR of 2026-27 Dated 20-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
NIT
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹10,864
21 Jul 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 50.94 | cum | 187.5 | ₹9,551.25 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 25.47 | cum | 256.5 | ₹6,533.05 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 37.16 | cum | 91.75 | ₹3,409.43 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 5.4 | cum | 479.3 | ₹2,588.22 |
| 5 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.59 | cum | 4,826.5 | ₹17,327.14 |
| 6 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 9.74 | cum | 5,733.6 | ₹55,845.26 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 2 coarse sand : 4 graded stone aggregates 20mm nominal size. | 0.76 | cum | 9,395.7 | ₹7,140.73 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork. A.Foundation,Footing,Base of Columns etc | 43.75 | Sqm | 286.35 | ₹12,527.81 |
| 9 | Cetring and shuttering including strutting, propping etc and removal of the form work Columns | 6.5 | Sqm | 742.55 | ₹4,826.58 |
| 10 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 37 | Sqm | 416.5 | ₹15,410.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1035746.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].