| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAccepted-Finance | ₹41.3 L | L1 | Accepted-Finance Lowest rate Quoted |
| 2 | L2₹41.5 LRejected-Finance | ₹41.5 L | L2 | Rejected-Finance Highest rate Quoted |
| Sl No | Description | Qty | Unit | PKP BOREWELLS L1 | D.MOHAN L2 |
|---|---|---|---|---|---|
| 1.001..Construction of 60000 litre OHT @ near by Kaniyur panchayat Primary school H/O Kaniyur | |||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B. First depth of 2m - Hard Soil | 16.38 | Cum | 390 ₹6,388.20 | 395 ₹6,470.10 |
| 3.00 | 0 to 2m column foundation -MR&DMR | 32.8 | Cum | 690 ₹22,632 | 695 ₹22,796 |
| 4.00 | Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. | 4.23 | Cum | 5,395 ₹22,820.85 | 5,400 ₹22,842 |
| 5.00 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete PLANE SURFACE Below Ground level and upto 3.30m above ground level | 16.16 | sqm | 1,095 ₹17,695.20 | 1,095 ₹17,695.20 |
| 6.00 | 0m to 3.30m | 10.64 | sqm | 1,095 ₹11,650.80 | 1,095 ₹11,650.80 |
| 7.00 | 3.31m to 4.30m | 21.34 | sqm | 1,130 ₹24,114.20 | 1,135 ₹24,220.90 |
| 8.00 | 6.31m to 7.30m | 61.84 | sqm | 1,235 ₹76,372.40 | 1,240 ₹76,681.60 |
| 9.00 | CURVED SURFACE 0m to 3.30m | 96.51 | sqm | 1,640 ₹1.6 L | 1,645 ₹1.6 L |
| 10.00 | 3.31m to 4.30m | 14.49 | sqm | 1,675 ₹24,270.75 | 1,680 ₹24,343.20 |
Tender Value
₹42.2 L
EMD Value
₹43,000
Closing Date
10 Mar 2026, 3:00 pmClosed
The Special Officer, Kaniyur
Village Panchayat office ,Kaniyur, Coimbatore
1.Construction of 60000 litre OHT near by Kaniyur panchayat Primary school H/O Kaniyur.2.Construction of 1.00lakh litre OHT near by Community hall Kollupalayam H/O Kaniyur in Sulur Block of Coimbatore District under PGF 2025-26
2026_RDTN_671579_1
251/2026 / A2 Dt.19.02.2026
Open Tender
Civil Works
180 days
Sulur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹43,000
2 Jun 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
1..Construction of 60000 litre OHT @ near by Kaniyur panchayat Primary school H/O Kaniyur
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B. First depth of 2m - Hard Soil
0 to 2m column foundation -MR&DMR
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete PLANE SURFACE Below Ground level and upto 3.30m above ground level
CURVED SURFACE 0m to 3.30m
SQUARE COLUMN Below GL and upto 3.30m
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete.RTS rod upto16mm
RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete. For works in 1.5m to 4.5m below Ground Level
For works in 0m to 1.50m below Ground level
For works in 0m to 4.5m above Ground level
For works in 4.51m to 7.32m above Ground level
For works in 7.33m to 10.98m above Ground level
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete
Fabrication, supply, delivery at site and fixing in position of MS ladder with easy inclination in two parts with width 45cm made out of 50mm x 50mm x 6mm MS angle using 16 mm dia round bar at 30cm centre to centre as steps with handrails at the top for 2.00m inclined height and also with necessary projecting arms at the top and bottom for proper resting with one coat of red oxide paint , loading,transit,unloading, insurance charges, taxes etc., complete
Providing and fixing of RCC inner access ladder in RCC 1:1½:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring, shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm×15cm and step slab of 25mm×25mm etc., complete and as directed by the departmental officers.
Supply, fixing of RCC manhole frame with cover of size 0.6m x 0.6m including cost of all materials, fixing of MS clamps, Bolt and nuts etc, complete and as directed by TWAD Board officers.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by the departmental officers.
Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc.,
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for liftin, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below. 65mm dia GI pipes for inlet connection
65mm dia GM Gatevalve
65mm dia GI coupler
65mm dia GI Flange set
Earth work excavation and depositing an bank with initial lead of 10m and lift of 2m as per SS20B
Cost and Supply of 90mm 6KSC PVC regid Pipes including all conveyance charges etc., complete
Towards the charges for PVC & GI Pipe Laying with PVC, GI Specials properly and with solvent cement etc.,
Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc.,
2.Construction of 1.00lakh litre OHT @ near by Community hall Kollupalayam H/O Kaniyur
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B. First depth of 2m - Hard Soil
First depth of 2m
Second depth of 1m
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete PLANE SURFACE Below Ground level and upto 3.30m above ground level
CURVED SURFACE 0m to 3.30m
SQUARE COLUMN Below GL
Circular COLUMN Below GL
Supplying, fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc., complete.RTS rod upto16mm
RCC 1:1.5:3 (One cement, one and half sand and three agreegates) using 20mm HBG stone excluding cost of reinforce ment, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishsing, curing etc., complete. For works in 1.5m to 4.5m below Ground Level
For works in 0m to 1.50m below Ground level
For works in 0m to 4.5m above Ground level
For works in 4.51m to 7.32m above Ground level
For works in 7.33m to 10.98m above Ground level
Painting two coats with approved Emulsion over one priming coat of Emulsion over cement plastered Wall surface and ceiling including cleaning preparing the surface and curing etc. complete
Fabrication, supply, delivery at site and fixing in position of MS ladder with easy inclination in two parts with width 45cm made out of 50mm x 50mm x 6mm MS angle using 16 mm dia round bar at 30cm centre to centre as steps with handrails at the top for 2.00m inclined height and also with necessary projecting arms at the top and bottom for proper resting with one coat of red oxide paint , loading,transit,unloading, insurance charges, taxes etc., complete
Providing and fixing of RCC inner access ladder in RCC 1:1½:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring, shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm×15cm and step slab of 25mm×25mm etc., complete and as directed by the departmental officers.
Supply, fixing of RCC manhole frame with cover of size 0.6m x 0.6m including cost of all materials, fixing of MS clamps, Bolt and nuts etc, complete and as directed by TWAD Board officers.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by the departmental officers.
Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc.,
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for liftin, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below. 80mm dia GI pipes for inlet connection
80mm dia GI coupling
65mm dia GI Elbow
65mm dia GM Gatevalve
65mm dia GI Flange set
Earth work excavation and depositing an bank with initial lead of 10m and lift of 2m as per SS20B
Cost and Supply of 90mm 6KSC PVC regid Pipes including all conveyance charges etc., complete
Towards the charges for PVC & GI Pipe Laying with PVC, GI Specials properly and with solvent cement etc.,
Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
technicalbid.pdf
Tender Documents • 0.80 MB
BOQ_807055.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid