Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance | ₹12.7 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹13.2 L+₹47,380 (3.73%)Accepted-Finance MOHALLA SUBHASHNAGAR DEOKALI ROAD DISTT LAKHIMPUR KHERI | LAKHIMPUR KHERI | LAKHIMPUR KHERI | UTTAR PRADESH | ₹13.2 L+₹47,380 (3.73%) | L2 | Accepted-Finance Accepted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.7 L
EMD Value
₹13,000
Closing Date
12 Sept 2024, 5:00 pmClosed
se edc
sonbhadra
Electrical work
2024_PVVNV_941117_2
35/edc(so)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹13,000
28 Sept 2024
31 Aug 2024
13 Sept 2024
31 Aug 2024
12 Sept 2024
31 Aug 2024
Amount
CENTRALIZED MATERIALS Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.)
ST Pole 11 Mtr Long
PCC Pole 11 Mtr Long
MS Channal 125x65x1300 Sq MM (T-off)
11 KV Pin Insulator With Pin
11 KV Disc Insulator with Fitting
ACSR Weasal conductor
MS Dropper Angle
11 KV V-type Cross Arm
LT AB Cable (1x16+1x25) Sq MM
MS Top Channel With Nut/Bolt
Stay Complete
S/S Base Angle
Gi Pipe 6" Dia
Earthing Complete
10 KVA T/F
25 KVA T/F
63 KVA T/F
DE-CENTRALIZED MATERIALS provided by contractor)
X-Arm Holding Clamp with Nut&Bolt
F-Bracket
Danger Board with Nut&Bolt
Clamp for T/F
Stone Pad
I Hook with Dead End Clamp
I Hook with Suspenstion Clamp
LT Shackle Insulator
LT Shackle Insulator for Clamp With Nut & Bolt
Nut & Bolt Washear
PG Clamp
Barbed Wire
Clamp With Nut & Bolt
Number Plate
Work of following materials as Per RESSPO/PuVVNL norms at the work site.
Errection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing Complete
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of Weasal Conductor, binding with insulators & jumpering.
Laying LT AB Cable (1x16+1x25) Sq MM
10 KVA T/F
25 KVA T/F
63 KVA T/F
Tree Cutting Compensation
Hard Rock Broken
Cable Laying Charges along with cast of bricks and sand
Road restoration charges for pucca road crossing
OM SAI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .