| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 CrAdmitted-Finance BASHAT CHENANI TEH CHENANI DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | -38.67% | ₹5.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.9 CrAdmitted-Finance | -37.44% | ₹5.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
Tender Value
₹12.0 Cr
EMD Value
₹24.0 L
Closing Date
17 Jun 2026, 5:00 pmClosed
Chief Engineer PMGSY JKRRDA Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road Jammu
Construction and Maintenance of Road L041-(Link Road)Km 2nd of Bharat Keshwan road to Gujjar Basti-Drumri Package No. JK04-4037, PMGSY-IV, Batch-I of 2026-27, Block-Dali Udhyanpur, District Doda Length 4.000 Kms
2026_JKRRD_147974_1
JK044037
Open Tender
Civil Works - Roads
Percentage
450 days
Dali Udhyanpur
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹24.0 L
Chief Engineer PMGSY JKRRDA Jammu
25 Aug 2026
26 May 2026
19 Jun 2026
26 May 2026
17 Jun 2026
1 Jun 2026
29 May 2026 - 30 May 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Hilly Roads:- Excavation in all kinds of soil, Soft Rock & Hard Rock, by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with all lift and leads as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 . | - | Cum | 0.6 | - |
| 2 | Excavation for Structures:- Earthwork in excavation for structures in all kinds of soil, soft and hard rock as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides and bottom and backfilling in trenches with excavated suitable material including de watering if required. | 1 | Cum | - | - |
| 3 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | - | Cum | 1 | - |
| 4 | Providing and laying of plain cement concrete of Grade M-15 in Foundation complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing and form work, all leads, lifts and carriages of materials by MT complete. | - | Cum | - | - |
| 5 | Providing and laying of plain Cement concrete of Grade M-20 in foundations complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing, form work , all leads, lifts and carriages of materials by MT complete. | - | Cum | 1 | - |
| 6 | Providing and laying reinforced cement concrete of Grade M-25 in super structure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204, 1205.4 & 1205.5 . Including cost of curing ,and form work , all leads, lifts and carriages of materials by MT complete. | - | Cum | 1 | - |
| 7 | Supplying , fitting and placing of HYSD bar reinforcement (Fe415) for RCC work in structure including bending, binding complete as per drawings & Technical specification Clauses 1002, 1005, 1010 and 1202 including cost of binding wire and also including, all leads , lifts, handling & re-handling and carriage of materials by MT complete. | 1 | MT | 1 | ₹1 |
| 8 | Polygonal/Random Rubble Masonry laid Dry un coursed brought to course in sub structure including cost of bond/through stones, all leads, lifts, carriages,of materials by MT handling and re-handling complete. | 1 | Cum | 1 | ₹1 |
| 9 | Polygonal/Random Rubble Masonry un coursed brought to course in cement mortar 1:6 (1 cement :6 fine sand) in sub- structure including leveling up as specified level with M-5 including cost of through/bond stones , all leads, lifts, carriages of materials by MT handling, and re-handling complete. | - | Cum | 1 | - |
| 10 | Back filling with stones behind abutment, wing walls and return walls complete a s per drawing and technical specification clause 1204.3.8 including all leads, lifts and carriages of materials by MT complete. | - | Cum | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 4.37 MB
BOQ_230904.xls
BOQ • 0.27 MB
15BharatKeshwanRoadToGujjarBastiDrumri.pdf
Tender Documents • 1.33 MB
CorrigendumNIT818.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].