| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMUDHA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Excavation of Pole pit of size 2'x2'x1/6 of the height of the pole upto 8 mtr pole by using JCB or Manual | 1 | Each pit | 500 ₹590 Lowest |
| 2.00 | Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole above 8mtr by using JCB or Manual | 1 | Each pit | 650 ₹767 Lowest |
| 3.00 | Excavation of pit in Hard soil (common to all size of poles) | 1 | Each pit | 1,000 ₹1,180 Lowest |
| 4.00 | Excavation of pit in Rocky area (common to all size of poles) by blasting /Manual | 1 | Each pit | 1,000 ₹1,180 Lowest |
| 5.00 | Excavation of Stay pit 2'x2'x5' depth by using JCB or manual | 1 | Each pit | 500 ₹590 Lowest |
| 6.00 | Excavation of Stay pit 2'x2'x5' depth in hard rock soil | 1 | Each pit | 900 ₹1,062 Lowest |
| 7.00 | Erection of RCC poles/PSC poles/Metal poles up to 8.00 M (27' ) by using JCB or manual | 1 | Each pole | 550 ₹649 Lowest |
| 8.00 | Erection of RCC poles/PSC poles/Metal poles above 8.00 M by using JCB or maual | 1 | Each pole | 650 ₹767 Lowest |
| 9.00 | Erection of metal supports above 9m/RSJ/Rail pole/Tubular poles | 1 | Each pole | 700 ₹826 Lowest |
| 10.00 | Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting | 1 | Each Set | 300 ₹354 Lowest |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
9 Mar 2026, 2:00 pmClosed
THE SUPERINTENDING ENGINEER / KANCHIPURAM
OFFICE OF THE SUPERINTENDING ENGINEER KANCHIPURAM.ELECY.DISTN.CIRCLE NO.1, OLIMOHAMEDPETTAI, ANNA MAALIGAI, TNPDCL, KANCHIPURAM 631502
Running Work Contract for AEE / Construction / Sriperumbudur inrespect of Sriperumbudur Division
2026_EB_669628_1
SE/KEDC/KPM/WC/Enq.107/2025-26
Open Tender
Electrical and Maintenance Works
Works
365 days
Sriperumbudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
13 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
9 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Excavation of Pole pit of size 2'x2'x1/6 of the height of the pole upto 8 mtr pole by using JCB or Manual | 1 | Each pit | - | - | 0.18% |
| 2 | Excavation of Pole pit of size 2'x2'x1/6' of the height of the pole above 8mtr by using JCB or Manual | 1 | Each pit | - | - | 0.18% |
| 3 | Excavation of pit in Hard soil (common to all size of poles) | 1 | Each pit | - | - | 0.18% |
| 4 | Excavation of pit in Rocky area (common to all size of poles) by blasting /Manual | 1 | Each pit | - | - | 0.18% |
| 5 | Excavation of Stay pit 2'x2'x5' depth by using JCB or manual | 1 | Each pit | - | - | 0.18% |
| 6 | Excavation of Stay pit 2'x2'x5' depth in hard rock soil | 1 | Each pit | - | - | 0.18% |
| 7 | Erection of RCC poles/PSC poles/Metal poles up to 8.00 M (27' ) by using JCB or manual | 1 | Each pole | - | - | 0.18% |
| 8 | Erection of RCC poles/PSC poles/Metal poles above 8.00 M by using JCB or maual | 1 | Each pole | - | - | 0.18% |
| 9 | Erection of metal supports above 9m/RSJ/Rail pole/Tubular poles | 1 | Each pole | - | - | 0.18% |
| 10 | Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc., / rocky area by blasting | 1 | Each Set | - | - | 0.18% |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_804719.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .