Loading…
Loading…
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
13 Aug 2026, 5:00 pm
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Construction of 8 nos VIP suites inside campus of circuit House Nayagarh Buildings.
2026_EICCL_137245_1
CCE-05/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Nayagarh
3 documents required · 3 mandatory
₹10,000
₹3.8 L
Yes
28 Jul 2026
28 Jul 2026
14 Aug 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
28 Jul 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect for the work as directed by the Engineer-in-charge. | 980.05 | cum | 282.88 | ₹2,77,236.54 |
| 2 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect and as per direction of Engineer-in-Charge. | 532.73 | cum | 484.16 | ₹2,57,926.56 |
| 3 | Cement Concrete (1:3:6) using 4cm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete. | 133.32 | cum | 5,760.24 | ₹7,67,955.2 |
| 4 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 34.5 | cum | 7,414.95 | ₹2,55,815.78 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, centering shuttering etc complete but excluding cost of reinforcement. | 125.53 | cum | 6,220.43 | ₹7,80,850.58 |
| 6 | RCC work of M-20 grade concrete in Column Super Structure G floor | 32.16 | cum | 15,603.27 | ₹5,01,801.16 |
| 7 | First Floor | 21.78 | cum | 17,679.55 | ₹3,85,060.6 |
| 8 | Second Floor | 21.78 | cum | 20,164.81 | ₹4,39,189.56 |
| 9 | Head Room | 7.52 | cum | 23,139.98 | ₹1,74,012.65 |
| 10 | RCC work of M-20 grade concrete in Plinth Band | 21.23 | cum | 7,094.82 | ₹1,50,623.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.17 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_603545.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].