Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -4.34% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹3,419.95 (1.19%)Admitted-Fee/PreQual/Technical/Finance | -3.20% | ₹2.9 L+₹3,419.95 (1.19%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.0 L+₹13,019.81 (4.54%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.0 L+₹13,019.81 (4.54%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
8 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CHAIN LINK FENCING AND UPGRADATION ALONG WITH MAIN GATE OF RDD HUT SHAMTHAN DARDPORA
2026_RDPR_323243_5
NIT81
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹6,000
14 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
8 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables, etc (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soils. | 16.31 | Cum | 479.3 | ₹7,817.38 |
| 2 | Providing and laying dry stone soiling hand packed tightly including carriage by 5km MT | 4.08 | Sqm | 1,204 | ₹4,912.32 |
| 3 | Providing and Laying in position cement concrete of specified grade including curing butexcluding the cost of centering and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 2.72 | Cum | 5,733.6 | ₹15,595.39 |
| 4 | R/R stone masonry with hard quality stones. CM in (1:6) mix @30% of A. | 7.34 | Cum | 5,402.9 | ₹39,657.29 |
| 5 | In Dry @ 70% of A. | 17.13 | Cum | 2,793.8 | ₹47,857.79 |
| 6 | P/F of steel (angle iron ( 40x40x5mm)/ flat iron (30x3mm)) for fixing of chain link fencing | 698 | Kg | 120.8 | ₹84,318.4 |
| 7 | P/F of chain link fencing 2"x2" mesh including cost of paint. | 71.38 | Sqm | 731.68 | ₹52,227.32 |
| 8 | Steel work welded in built up section/framed work, including cutting, hoisting fixing in position and applying a priming coat of approved steel primer using structural steel etc as required | 200 | Kg | 138.5 | ₹27,700 |
| 9 | Carriage of sand aggregates by MT 25Kms & head load 200m. (Qty vide item No [email protected] & [email protected] ) | 3.68 | Cum | 1,059.05 | ₹3,897.3 |
| 10 | Carriage of stones by MT 5Kms & head load 100m. (Qty vide item No 02 & 04) | 26.76 | Cum | 523.64 | ₹14,012.61 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1087266.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .