Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAccepted-AOC AT PO DERA COLLIERY TALCHER DIST ANGUL ODISHA PIN 759103 | ANUGUL | ODISHA | 759103 | ₹9.5 Cr | L1 | Accepted-AOC L1 (Selected through Transparent Lottery) |
| 2 | L1₹9.5 CrRejected-Finance | ₹9.5 Cr | L1 | Rejected-Finance L1 |
| 3 | L1₹9.5 CrRejected-Finance AT P O P S BANGOMUNDA DIST BOLANGIR 767040 | BANGOMUNDA | BOLANGIR | ODISHA | 767040 | ₹9.5 Cr | L1 | Rejected-Finance L1 |
| 4 | L1₹9.5 CrRejected-Finance AT PO BAZARPADA BELPAHAR DIST JHARSUGUDA | BELPAHAR | JHARSUGUDA | ₹9.5 Cr | L1 | Rejected-Finance L1 |
| 5 | L1₹9.5 CrRejected-Finance ANANDI NIWAS MAIN ROAD ROURKELA 769001 | ROURKELA | SUNDERGARH | ODISHA | 769001 | ₹9.5 Cr | L1 | Rejected-Finance L1 |
Tender Value
₹11.2 Cr
EMD Value
₹11.2 L
Closing Date
23 Dec 2025, 5:00 pmClosed
Chief Engineer, Buildings-I, Odisha, Bhubaneswar.
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of 24 Nos. E-type Quarters each at CHC, Lakhanpur in the district of Jharsuguda.
2025_EICCL_122873_2
C.E. (B) - 33 / 2025-26
Open Tender
Civil Works - Buildings
Percentage
547 days
JHARSUGUDA DIST.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹11.2 L
Yes
28 Aug 2026
9 Dec 2025
24 Dec 2025
9 Dec 2025
23 Dec 2025
9 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earth work in excavation of foundation trenches in hard soil or gravely soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 2,623.12 | Cum | 276.89 | ₹7,26,315.7 |
| 2 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 3,003.96 | Cum | 1,047.68 | ₹31,47,188.81 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 304.27 | Cum | 6,292.9 | ₹19,14,740.68 |
| 4Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. | |||||
| 4.01 | Column Base Footing | 407.36 | Cum | 7,010.79 | ₹28,55,915.41 |
| 4.02 | Plinth Beam | 90.56 | Cum | 7,881.13 | ₹7,13,715.13 |
| 4.03 | Column in Super Structure | - | - | - | - |
| 4.04 | Ground Floor | 126.64 | Cum | 16,266.74 | ₹20,60,019.95 |
| 4.05 | First Floor | 51.12 | Cum | 18,314.72 | ₹9,36,248.49 |
| 4.06 | Second Floor | 51.12 | Cum | 20,766.25 | ₹10,61,570.7 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
DTCN.pdf
Tender Documents • 36.21 MB
BOQ_570713.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .