Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.1 LAccepted-AOC 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | ₹93.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 CrRejected-AOC 114 B A GRAND TRUNK ROAD RAJAR BAGAN BAIDYABATI HOOGHLY BAIDYABATI 712222 | BAIDYABATI | HOOGHLY | WEST BENGAL | 712222 | ₹1.1 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.2 CrRejected-AOC | ₹1.2 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹1.2 CrRejected-AOC | ₹1.2 Cr | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 112 21 A 2 K N MUKHERJEE ROAD P O TALPUKUR BARRACKPORE 24 PGS N | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | - | - | Rejected-Technical TECHNICALLY NOT QUALIFIED. |
| Sl No | Description | Qty | Unit | M/s, TRIGONE AND COMPANY L4 | Traders and Engineers Private Limited L3 | OM CORPORATION L1 | SARKAR CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months. | 12 | month | 3,40,000 ₹40.8 L | 3,19,590 ₹38.4 L | 2,56,833.52 ₹30.8 L | 3,05,500 ₹36.7 L |
| 1.10 | Labour component:(76% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect. | - | - | - | - | - | - |
| 1.20 | Non-labour component: (24% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of the O&M-work till end of the first twelve months. This also indicates the base-cost upon which monthly cost of second year of O&M-work will be determined. | - | - | - | - | - | - |
| 2.00 | Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of Second 12 months. | 12 | month | 3,42,448 ₹41.1 L | 3,21,891.05 ₹38.6 L | 2,58,682.72 ₹31.0 L | 3,07,699.6 ₹36.9 L |
| 2.10 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient increment will be in effect. | - | - | - | - | - | - |
| 2.20 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | - | - | - | - |
| 3.00 | Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of Third 12 months. | 12 | month | 3,44,969.44 ₹41.4 L | 3,24,261.13 ₹38.9 L | 2,60,587.4 ₹31.3 L | 3,09,965.19 ₹37.2 L |
| 3.10 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient (if any) increment will be in effect. | - | - | - | - | - | - |
| 3.20 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
26 Nov 2024, 1:00 pmClosed
THE DIRECTOR GENERAL (WATER SUPPLY)
5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works.
2024_KMC_764270_1
KMC/WS/GRWW/T-02/2024-25
Open Tender
Project Work
1095 days
WITHIN GRWW CLEAR WATER COMPLEX.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.3 L
2 Apr 2026
24 Oct 2024
28 Nov 2024
25 Oct 2024
26 Nov 2024
25 Oct 2024
Amount
Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months.
Labour component:(76% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect.
Non-labour component: (24% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of the O&M-work till end of the first twelve months. This also indicates the base-cost upon which monthly cost of second year of O&M-work will be determined.
Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of Second 12 months.
Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient increment will be in effect.
Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
Operation and Maintenance of 10 MG capacity SUGR and Pumping Station at Clear Water Campus of Garden Reach Water Works providing adequate number of working personnel per shift round the clock (like daily operation of H.T. pump-motor sets during all the pre-scheduled timespans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of Third 12 months.
Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient (if any) increment will be in effect.
Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined.
SARKAR CONSTRUCTION (BID ID -5776049)
Traders and Engineers Private Limited (BID ID -5734963)
M/s, TRIGONE AND COMPANY (BID ID -5753435)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Techbid10MG.pdf
Tender Documents • 0.60 MB
BOQ_1692706.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid