Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.5 L
EMD Value
₹9,040
Closing Date
4 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
XEN LRWD SMC
XEN LRWD SMC OFFICE KARANAGAR SGR
Construction of lane drain near the House Mohammad Abdullah Dar at Qazi Masjid Karfali Mohalla Habba Kadal
2026_HAUDD_327890_3
NIET 44 e-tendering /2025-26 LRWD
Open Tender
Civil Works
Percentage
60 days
srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
CAO AC 0216010200000007
₹9,040
13 Oct 2026
13 Oct 2026
5 Nov 2026
14 Oct 2026
4 Nov 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling damged tile work in floors including stacking material within 50 meters lead.including disposal of unservicable material within 50m lead as per directions of engineer incharge. | 120.81 | SQM | 89.95 | ₹10,866.86 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix) | 5.23 | CUM | 1,725.2 | ₹9,022.8 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: (1 meter from cutting edge ) All kinds of soil | 11.9 | CUM | 479.3 | ₹5,703.67 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.6 | CUM | 5,202.9 | ₹23,933.34 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.23 | CUM | 5,733.6 | ₹64,388.33 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 12.14 | CUM | 6,591.25 | ₹80,017.78 |
| 7 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | 37.17 | SQM | 286.35 | ₹10,643.63 |
| 8 | 12mm thick cement plaster 1:4 mix (1 Cement :4 sand ) | 52.79 | SQM | 283.8 | ₹14,981.8 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete job including all carriages complete job.
(a) (Welded.) | 1,237 | KG | 138.2 | ₹1,70,953.4 |
| 11 | P/F of PVC pipe/fittings line heavy duty (Prince made). (Grade-B) with fittings complete job.
A) 100 mm dia | 21.34 | RM | 365 | ₹7,789.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1110187.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .