Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹43.7 L
EMD Value
₹44,000
Closing Date
14 May 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, VPM
Strengthening of 1 road in Kandamangalam of Viluppuram District under NABARD 25 Package 002
2020_RDTN_162130_2
VPM/NABARD25/002
Open Tender
Civil Works
Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹44,000
Yes
15 May 2020
8 May 2020
14 May 2020
8 May 2020
14 May 2020
8 May 2020
90 days
Amount
Strengthening the road from Pakkam to Thulukanatham Road Km 0/0-1/680
Clearing the scrub jungles including all labour charges for all labour charges etc complete.km 0/0-1/680
Earthwork excavation and deposting on bank eith an intial lead and lift in hard gravelly soil for cutting side drain etc complete as per SS 20A
Picking old BT Surface upto 10cm thick
Collection & Supply and spreading of US gravel including cost & conveyance and labour charges for stacking etc., complete
Providing and laying 75mm compacted thick WBM Gr.II using 1 cum of 90 mm to 22.40 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
Providing and laying 75mm compacted thick WBM Gr.III using 1 cum of 63 mm to 26.50 mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10sqm. Of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to worksite and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel forming edge bunds watering with all leads for good water slurrying rolling and consolidation by power roller and finishing has per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all other incidental charges etc., complete for top layer.
Applying tack coat over WBM surface using 4 kg of bituminous emulsion per 10 sqm including cost and conveyance of bituminous emulsion which will be supplied by deptly at section store and cost of which will be recovered at the rates as per special condittion appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc, complete as per clause 503 of MOST specification
Providing and laying Premix carpet 20mm thickness using 0.18 cum of 13.2 IRC machine crushed metal 0.09 cum of 11.2mm IRC machine crushed metal with 14.60kg of bitumen for premixing 10 sqm of premix carpet and laying seperately seal coat type A using 0.09 of 6.70mm IRC HBG chips with 9.80kg of bitumen for 10 sqm including cost and conveyance of materials to the departmental metric gauge for pre measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for premix carpet and rolling by 80-100KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant,bitumen boiler , all other tools and plants employed etc., complete
Provision for KM stone
Provision for HM stone
Provision for the Name board
Provision for sign board
Provsion of Photo graph charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MKM Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .