Loading…
Loading…
Tender Value
₹28.4 L
EMD Value
₹2.8 L
Closing Date
29 Jul 2026, 5:00 pm3d left
EE MI BANDA
EE MI BANDA
Construction of CheckDam Berraon Muktidham Block Kamasin Lot-22
2026_UPMID_1171264_22
02/MI/JET/2026-27 Dt 15-07-2026
Open Tender
Civil Works
Item Rate
90 days
BANDA
Construction of CheckDam Berraon Muktidham Block Kamasin Lot-22
2 documents required · 2 mandatory
₹1,300
EE MI BANDA
₹2.8 L
MI BANDA
22 Jul 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in mar kabar, rankar and kankar mixed hard soil including lead 30 m and lift 1.5m 40% of E/W | 319.22 | m³ | 95.2 | ₹30,389.74 |
| 2 | As above Earthwork but ift 1.5m to bed level is 60% of E/W | 478.83 | m³ | 101.5 | ₹48,601.24 |
| 3 | Earth Work in excavation in Mar, Kabar Rankar and Kankar mixed saturated soil . With 5 lifts & 30 m lead | 253.31 | m³ | 115.6 | ₹29,282.64 |
| 4 | Removal of slush from bed of Nala before excavation of saturated soil. | 54.11 | m³ | 258.3 | ₹13,976.61 |
| 5 | C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Granit Stone Grit including the cost of materials labours and etc. required for proper completion of work. | 159.37 | m³ | 5,127.7 | ₹8,17,201.55 |
| 6 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 106.66 | m³ | 5,760.1 | ₹6,14,372.27 |
| 7 | R.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 162.38 | m³ | 4,671.8 | ₹7,58,606.88 |
| 8 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm Granit Stone grit including the cost of materials labours and etc.to required for proper completion of work. | 37.66 | m³ | 6,023.8 | ₹2,26,856.31 |
| 9 | Raised struck pointing in 1:2 Cement sand mortar including the cost of material labour etc.to required for proper completion of work. | 81.52 | m² | 139.8 | ₹11,396.5 |
| 10 | Plaster in 1:3 Cement, Sand Mortar on stone masonery of checkdam. | 76.58 | m² | 216.6 | ₹16,587.23 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.35 MB
BOQ_2198985.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].