| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 CrAccepted-Finance | ₹2.8 Cr | 1 | Accepted-Finance Accepted |
| 2 | 2₹2.9 CrAccepted-Finance | ₹2.9 Cr | 2 | Accepted-Finance Accepted |
| 3 | 3₹3.0 CrAccepted-Finance | ₹3.0 Cr | 3 | Accepted-Finance Accepted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive Engineer, CD-VI
EE CD-VI Bharat Nagar Office Complex Delhi-52
Construction of Double lane bridge on U/S of Singalpur Bridge across Dry Munak Canal.
2026_IFC_284636_1
EE/CD-VI/ACS-82/2025-26
Open Tender
Civil Works
240 days
Delhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8.3 L
24 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil
Extra for Ist lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil.
Extra for IInd lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil.
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Extra for shuttering in circular work (20% of respective centering and shuttering items)
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : Concrete of M10 grade with minimum cement content of 220 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : M-15 grade plain cement concrete (cement contentconsidered @ 240 kg/cum)
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M35 grade with minimum cement content of 370 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M35 grade with minimum cement content of 370 kg /cum
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-35 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tube well boring machine shall not be used.1000 mm dia piles
Vertical load testing of piles in accordance with IS 2911 (Part IV)\including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submitt the design of loading platform for the approval of Engineer-in-charge Single pile above 50 tonne and upto 100 tonne Safe capacity Routine test (Test Load 1.5 times the Safe capacity)
Supply, fabrication, assembling, hoisting/erecting and fixing in position at lopacations, steel girder using structural steel of rolled single /built up sections confirming to 15:2062- Grads Fe 410 including joist, channel, angles, tee, plates etc. all as per structural drawings and ly, per detailed specifications (for materials & workmanship). The item also includes supply, testing of HSFG bolts and compatible nuts and washers. This item also includes all testes fo materials & welded fabricated parts. This item also including necessary equipment fof completing the work including necessary scaffolding /staging, launching, Preparation fabrication shop drawings, necessary templates etc. Profile cutting of components to required lengths/width and shapes/profile, smooth grinding/machining of edges/faces/all welding/bolted joints, Necessary welding (electric are welding) for required wield lengths and sizes, Providing and fixing studs of 25mm dia 325 c/c spacing through the length of span and tested as specified and Barricading of erection site.
Preparing the surface to ensure complete removal of mill scale by grit blasting confirming to SA 2.5 to achieve rust free surface specification and providing & applying inorganic zinc silicate & Epoxy Zine phosphate primer and Acrillic polyurethane paint finish as per specification.
Providing & fixing expansion joint as per drawing and design in deck slab of Road Bridge and instruction of Engineer-in-charge.
Providing & Fixing neoprene bearing of approved brand and manufacture as per specification & approved drawings.
Providing & Fixing under footpath and weep holes of 110mm dia PVC (Heavy Duty) pipe as per drawing & Direction of Engineer-in-Charge.
Providing & fixing hard drawn sheet wire mesh fabric 75x25mm of weight not less than 7.75kg/sqm fixed (welded) on frame of angle iron 50x50x6mm and T-iron 50x50x6mm with flat iron of size 20x5mm including cutting welding, hoisting and fixing in position with M.S. flat clamps of size 50x6mm of 1.15m length with nuts and bolts with existing RCC railing and applying a priming coat of steel primer of approved brand and manufacture etc. complete as per drawing and direction of Engineer-in-charge.
Extra for laying reinforced cement concrete in or under water and/ or liquid mud, including cost of pumping or bailing out water and removing slush etc., complete.
Providing & Fixing drainage spouts which 80 dia G.I. Pies in deck slab as per drawing & Direction of Engineer-in-Charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm).
Care and diversion of standing water, spring water, river water or drains and the like in working area including construction and removal of earth/coffer bundies upto DBL/existing lever where required including pumping and baliling out of the surface flowing water for keeping the working area free from standing water, flowing water seepage water for execution of entire work. Scope of item includes cost of labour charges required for bandies, pumping out of water and removal of bundies after execution of work.
Chequered terrazo tiles 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : Medium shade pigment using 50% white cement, 50% ordinary cement
75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Moorum
75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Stone aggregate 20 mm nominal size
75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Stone aggregate 40 mm nominal size
75mm thick flat dry brick tile flooring with FPS bricks tiles of class designation 75 on a bed of 12mm mud mortar including filling joints with Jamuna sand.
Providing and laying hydraulically pressed CC tiles 300x300x50mm thick 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) in single layer only over 5mm thick mortar 10mm thick joints of cement mortar 1:3 (1 cement : 3 coarse sand) to be laid over 15mm cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg I sqm
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Construction of esthetic railing at Singalpur Bridge.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
Supplying and stacking at site.
90 mm to 45 mm size stone aggregate
63 mm to 45 mm size stone aggregate
53 mm to 22.4 mm size stone aggregate
Stone screening 13.2 mm nominal size (Type A)
Stone screening 11.2 mm nominal size (Type B)
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M. @ 0.75 Kg / sqm.
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_376452.xls
BOQ • 0.34 MB
412singalpurbrudge.pdf
Tender Documents • 1.49 MB