Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.8 CrAccepted-AOC BONAGUND VERINAG ANANTNAG J K 192212 | ₹7.8 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹8.5 Cr+₹69.8 L (8.96%)Rejected-Finance D 245 SECTOR 10 NOIDA 201301 UTTAR PRADESH | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹8.5 Cr+₹69.8 L (8.96%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹8.7 Cr+₹86.7 L (11.1%)Rejected-Finance 137M 137 N OM SHANLI COMPLEX HOPE COLLEGE AVINASHI ROAD COIMBATORE PIN 641004 | COIMBATORE | COIMBATORE | TAMIL NADU | 641004 | ₹8.7 Cr+₹86.7 L (11.1%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹10.2 Cr+₹2.4 Cr (30.6%)Rejected-Finance OFFICE NO 112 FIRST FLOOR GANESH KHIND ROAD AUNDH PUNE 411067 | PUNE | PUNE | MAHARASHTRA | 411067 | ₹10.2 Cr+₹2.4 Cr (30.6%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹10.8 Cr+₹3.0 Cr (38.7%)Rejected-Finance | ₹10.8 Cr+₹3.0 Cr (38.7%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹17.0 Cr
EMD Value
₹14.5 L
Closing Date
7 Jul 2025, 3:00 pmClosed
General Manager/Civil/PH/SDN
USBRL Project Office, Sangaldan, Ramban, JK-182144
Balance Work of Slope Stabilization Work along the access road up to Hill Top for Sumber Station Yard _KM 110-883_ on Dharm Qazigund Section Udhampur- Srinagar-Baramulla New BG Railway Link Railway Project.
2025_IRCON_239210_1
IRCON/JK CELL/JAT/14/1014/K B/O.Tender/Pkg-Slope Stabilization-SDN-R/620
Open Tender
Civil Works
Percentage
150 days
J and K
As per tender conditions
5 documents required · 5 mandatory
₹30,000
IRCON INTERNATIONAL LIMITED
₹14.5 L
17 Sept 2025
23 Jun 2025
8 Jul 2025
23 Jun 2025
7 Jul 2025
30 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Balance Work of Slope Stabilization Work along the access road up to Hill Top for Sumber Station Yard (KM 110+883) on Dharm Qazigund Section Udhampur-Srinagar-Baramulla New BG Railway Link Railway Project. (Package: Slope Stabilization-SDN-R)
Refer BOQ | 1 | Nos | 16,97,21,259 | ₹16,97,21,259 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_271990.xls
BOQ • 0.26 MB
173828761.pdf
Tender Documents • 0.63 MB
173828762.html
Tender Documents • 0.07 MB
Financial_Bid.pdf
Tender Documents • 0.88 MB
IR_GCC.pdf
Tender Documents • 8.17 MB
Safety_Health_and_Environment_Management_System.pdf
Tender Documents • 0.20 MB
Technical_Bid.pdf
Tender Documents • 2.19 MB
Tender_Acceptance_Letter.pdf
Tender Documents • 0.08 MB
Tender_Drawings.pdf
Tender Documents • 27.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .