Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC PURANA BETWA GHAT DISTRICT HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210301 | ₹1.2 Cr | L1 | Accepted-AOC Financial bid accepted by the committee |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance Rejected being higher rate |
| 3 | L3₹1.4 CrRejected-Finance 1 TAHSIL ROAD MAUDAHA RAGAUL HAMIRPUR | ₹1.4 Cr | L3 | Rejected-Finance Rejected being higher rate |
Tender Value
₹1.6 Cr
EMD Value
₹10.0 L
Closing Date
24 Mar 2026, 12:00 pmClosed
S.E., Hamirpur Circle PWD Hamirpur
S.E., Hamirpur Circle PWD Hamirpur
New construction work of remaining part of Bhawani dera to Ladar link road.
2026_CEBAN_1126411_1
450/30C-Hamirpur Circle/2025 Date 27.02.2026
Open Tender
Civil Works - Roads
180 days
PD PWD Hamirpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹10.0 L
S.E., Hamirpur Circle PWD Hamirpur
6 May 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
20 Mar 2026
Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete.
Construction of Granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per clause 401.
Providing , laying, spreading material on a prepared sub grade adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined strength and to form a layer of sub base.
Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ 0.35 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508
Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510
Construction of sub grade and earthen shoulders with approved materials obtained from boorrow pits with all lifts & leads, transporting to site, spreading, grading to required slop and compacted to meet requirement of table No. 300-2 with lead upto 1000 m as per technical Specification Clause 303.1. in Patri (Carted earth)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (M 10)
Providing and laying reinforced cement concrete M 25 grade in Foundation as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
Providing and laying reinforced cement concrete M 25 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614. 709, 1204.3.7
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 S.I. No.14.6
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
Providing and laying plain/reinforced cement concrete M 20 grade in Foundation as per drawing and technical specifications clauses 802, 1202 and 1203 (1:2:4)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (M 10)
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/superstracutre as per technical specification clauses 613.4 & 1204
Laying 350 mm dia reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets
Laying 600 mm dia reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri, road furniture etc.as per direction of E.I for the period of five years from the actual completion of work (For Bituminous work) Maintenance cost for 1st year (@0 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri, road furniture etc.as per direction of E.I for the period of five years from the actual completion of work (For Bituminous work) Maintenance cost for 2nd year (@1.00 % of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri, road furniture etc.as per direction of E.I for the period of five years from the actual completion of work (For Bituminous work) Maintenance cost for 3rd year (@1.50% of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri, road furniture etc.as per direction of E.I for the period of five years from the actual completion of work (For Bituminous work) Maintenance cost for 4th year(@2.00% of total work amount S.No.1-25)
Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri, road furniture etc.as per direction of E.I for the period of five years from the actual completion of work (For Bituminous work) Maintenance cost for 5th year (@3.00% of total work amount S.No.1-25)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 5.88 MB
BOQ_2100614.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid