Tender Value
₹40.7 L
EMD Value
₹81,400
Closing Date
14 Jun 2026, 6:00 pm
XEN WDSC NOHAR
OFFICE OF XEN WDSC NOHAR BLOCK NOHAR
Package-2 Construction of Tanka at Arable Land Total 21 Works in MJSA 2.2 Project Block-Nohar
2026_WDSC_564445_1
NIT 2 NOHAR 26-27 MJSA 2ND PHSE
Open Tender
Civil Works - Water Works
GP KHUIYAN BLOCK NOHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
0075-00-800-52-01
₹81,400
3 Jun 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
14 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation for foundation trenches upto 1.5 mt depth including ramming the bottom, finishing & dressing of side, filling the gape with soil & disposal of surplus soil upto 50 mt. lead (In ordinary soil(cum)(RDPR BSR item 2A) | 441.69 | Cu.m | 143.92 | ₹63,568.02 |
| 1.01 | Additional lift from 1.5 to 3.0 m | 358.95 | Cu.m | 166.72 | ₹59,844.14 |
| 1.02 | Additional lift from 3.0 m to 4.5 m | 177.08 | Cu.m | 189.52 | ₹33,560.2 |
| 2 | P/L cement concrete for foundation in 1:5:10 ( 1 cement : 5 bajri : 10 stone ballast) including curing, compaction etc complete(cum)(RDPR BSR item 9A) | 35.89 | Cu.m | 3,629.72 | ₹1,30,270.65 |
| 3 | Ist class brick masonary for foundation & plinth in 1:6 (1 cement : 6 bajri) filling the joints, curing etc complete.(Cum)(RDPR BSR item 20A) | 409.76 | Cu.m | 4,075.31 | ₹16,69,899.03 |
| 4 | P/L C/C in1:1.5:3 ratio in R.C.C. work for slab,lintel,beam,chhajja etc. compation &curing complete using 12mm size of stone ballast excluding cost of centering & shuttetring(Cum)(RDPR BSR item 13B) | 12.11 | Cu.m | 6,103.97 | ₹73,919.08 |
| 5 | P/L reinforcement for R.C.C. work as per specification(RDPR BSR item 61) | 1,210.4 | kg | 86.18 | ₹1,04,312.27 |
| 6 | Centering & Shuttering for R.C.C. work upto 4.5m height including laying & removing complete(RDPR BSR item 93B) | 67.69 | Sq.m | 270.38 | ₹18,302.02 |
| 7 | P/L stone patties roof as per jodhpur practice, including filling the gape with stone chips in 1:4 cm, as per specification (sqm.) Span 1.5-2.4 m(RDPR BSR item 45B) | 235.05 | Sq.m | 1,810.6 | ₹4,25,581.53 |
| 8 | अधिक पकी ईंटो का खरंजा किसी भी वोंड व केम्बर तथा ग्रेड में लगाना तथा जोड़ों में मिट्टी भरकर ईंटों के ऊपर फैलाना सहित । पट्ट ईंट में (RDPR BSR item 150B) | 1,978.93 | Nos | 247.48 | ₹4,89,745.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.72 MB
BOQ_1004526.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid