Tender Value
₹15.2 L
EMD Value
₹30,360
Closing Date
12 Mar 2020, 4:00 pmClosed
ER. VINOD GUPTA
Office of the Deputy General Manager, JKPCC Ltd., Unit 9th Doda.
Construction of Sump Tank, Compound Wall, Gate Pillars, Providing and Fixing of 2 No. Gates, Construction of drain and plinth Protection to Construction of Govt. Degree College at Kilhotran.
2020_PWDJK_94237_2
e-NIT NO 43/DODA of 2019-20 Dt. 03-03-2020.
Open Tender
Civil Works
Item Rate
30 days
KILHOTRAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
Financial Controller, JKPCC Ltd.
₹30,360
Yes
29 Apr 2020
4 Mar 2020
13 Mar 2020
4 Mar 2020
12 Mar 2020
6 Mar 2020
Amount
Earth work in excavation by manual means 70% in all kind of soil and 30% in ordinary rock in trenches for foundations, drains, pipes, cables etc. (Not exceding 1.5 mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5 mtr. Including disposal of excavated earth upto 1 mtr. from cutting edge. disposed earth is to be levelled and neatly dressed.
Earth work in excavation by manual means 80% in all kind of soil and 20% in ordinary rock in trenches for foundations, drains, pipes, cables etc. (Not exceding 1.5 mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5 mtr. Including disposal of excavated earth upto 1 mtr. from cutting edge. disposed earth is to be levelled and neatly dressed.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level in 1:4:8 (1 cement: 4 coarse sand: 8 crushed graded stone aggregate 40mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 crushed graded stone aggregate 20mm nominal size).
Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centring and shuttering, finishing and reinforcement -All work upto plinth level in 1:1.5:3 (1 cement: 1.5 coarse sand: 3 crushed graded stone aggregate 20mm nominal size).
Reinforcement for RCC work including straightening cutting, bending placing in position.
Centering and shuttering including strutting propping etc. and removal of form work for Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets etc.
Centring and shuttering including strutting, propping etc. and removal of form for Coulmns, pillars, piers, abutments, posts and struts.
Brick work with common burnt clay FPS (Non modular) bricks of class designation 75 in superstructure above plinth level to floor five level ( by manual means).
Half brick masnory with bricks of class designation 75 in foundation and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand).
20mm thick cement sand plaster in 1:6 mix (1 cement : 6 coarse sand).
20mm thick cement sand plaster in 1:3 mix (1 cement : 3 coarse sand)
15 mm thick cement sand plaster on the rough side of single or half brick wall of mix: 1:6 (1 cement : 6 fine sand).
6mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat of neat cement and thick coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.
Finishing walls with two or more coats of water proofing cement paint of approved brand and manufacture on new surface including one coat of primer.
Making plinth protection 50 mm thick of cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well rammed, consolidated and grouted with fine sand including finishing the top smooth.
Providing and fixing gang saw cut mirror polished (premoulded and pre polished), machine cut for kitchen platform, vanity counters windows sills facias and similar locations of required size of approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand) with joints treated with white cement, mixed with matching pigment epoxy touch ups, including rubbing, curing moulding and polishing to edge to give high gloss finish etc. complete at all levels 18mm thick leather brown granite slabs.
Providing and fixing of ornamental type iron gates with frame and diagonals braces of 40x40x6mm angle iron 3mm gusset plates at the junctions and corner, fixing of 1 mm thick M.S sheet 25 mm dia pulleys including applying priming coat and painting two coats with synthetic enamel paint of required shade.
Cement concrete flooring 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggreagte) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20mm nominal size aggregate. (a) crushed)
Carriage of sand from source to site of work by an avg. distance 50Km by M.T.
Carriage of 20mm and down gauge aggregate from source to site of work by an average distance 33 Km by M.T.
Carriage of 40mm and down gauge aggregate from source to site of work by an average distance 33 Km by M.T.
Carriage of 2nd class (100 b or 75 A ) Bricks from source to site of work by an average of distance 250 Km by M.T.
ISHAQ AHMED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .