Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC 1 6 620 CHAITANYAPURI INDRA NAGAR DILSUKHNAGAR HYDERABAD TELANGANA 500060 UDYAM TS 09 0007870 37AAEPO0535A1Z8 B 36AAEPO0535A1ZA R MSME STATUS AS VERIFIED | RANGA REDDY | TELANGANA | 500060 | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹14.7 L+₹74,565 (5.33%)Rejected-Finance | L2 | Rejected-Finance Lowest 2 | |
| 3 | L3₹15.5 L+₹1.5 L (10.5%)Rejected-Finance | L3 | Rejected-Finance Lowest 3 |
Tender Value
Refer Docs
EMD Value
₹35,500
Closing Date
31 Mar 2021, 6:00 pmClosed
GE (AF) Hakimpet
GE (AF Hakimpet Secunderabad - 14
REPAIRS AND MAINTENANCE OF DG SETS AND OTHER CONNECTED WORKS AT AFS HAKIMPET UNDER GE AFS HAKIMPET
2021_MES_427626_1
8285/E8
Open Tender
Civil Works
Works
300 days
HAKIMPET
As per NIT
6 documents required · 6 mandatory
₹500
GE (AF) HAKIMPET
₹35,500
Yes
31 May 2021
3 Mar 2021
2 Apr 2021
3 Mar 2021
31 Mar 2021
17 Mar 2021
Amount
Material and Labour for servicing of DG set by carrying out the following maintenance including testing on completion at connected load complete all as specified and directed by Engineer-in-Charge for the DG set of capacity 160/180 KVA installed at various locations in AFS Hakimpet area:-
Draining out engine oil from the sump by removing drain plug, cleaning the sump thoroughly and refilling the sump with new engine oil to required level (Note: Engine Oil will be measured and paid under relevant supply only item of BOQ)
Draining out of diesel from tank and storing in cleaned containers, cleaning the tank thoroughly by removing sediments settled at the bottom and refilling the drained out diesel duly filtered.
Supply and replace complete set of fuel filters, engine oil filters and air cleaner element.
Draining out complete coolant water mixture from the radiator and re-filling the radiator with new coolant and water mixture with proportionate ratio (Note: Coolant will be measured and paid under relevant supply only item of BOQ)
Check and top up the electrolyte/distilled water in starting batteries to maintain the required specific gravity. Cleaning of battery terminals & applying petroleum jelly to battery poles & brass connectors.
Tightening all the fasteners of complete DG set to the required torque.
All as per item No.1 here-in-before but for DG set of capacity 125 KVA Make – Kirloskar/Greaves installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 100 KVA Make – Kirloskar/Greaves/Ashok Leyland installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 70/ 75 KVA Make – Kirloskar installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 62.5/63 KVA Make – Kirloskar/Ashok Leyland installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 40/50 KVA Make – Kirloskar/Greaves/Ashok Leyland installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 20/25 KVA Make – Kirloskar/Ashok Leyland installed at various locations in AFS Hakimpet.
All as per item No.1 here-in-before but for DG set of capacity 15 KVA Make – Kirloskar installed at Runway 43 ED in AFS Hakimpet.
Attending of compliants duly finding of fault or defects in enging/alternator/ AMF panel and rectification of defects including checking microprocessor based AMF control panel and connected programmed safety features, safety switches/ cut-outs / thermostats etc, removing and re-terminating the burnt wires, checking of all contactors/contacts for proper auto functioning and rectifying the faults/ faulty components by replacing with new spares and setting the relays setting of programming of operating parameters and safety limits ( if required) etc complete all as specified and directed by Engineer-in-Charge. Note :- Spair parts required to make serviceable will be measure and paid separately under respictive items os Sch A.
Supply only engine oil 10W40/20W40/20W50 against Item nos 1 to 8 for oil change of Gen set (as per recommended by manufacturer) complete all as specified and as directed.
Supply only generator radiator coolent Concentrate Blue against Item nos 1 to 8 complete all as specified and as directed.
Supply and replace the following spare parts suitable for DG sets of various capacities:-
Wire braided fuel pipe
Leak off pipe
Fuel pipe from feed pump to fuel filter inlet
Fuel pipe from fuel filter out to fuel pump inlet
Fuel pipe from tank to feed pump(upto length 1.70m)
Hose for water outlet manifold
Thermostat bypass hose
Hose for drain pipe/tapet cover gasket
Bypass hose
V' belt cogged of suitable size as per site requirement
Poly 'V' belt
De-scaling of radiator assembly by carefully removing from the engine, transporting to the workshop (if required) and removing the sediments, scales and rust etc by means of acid cleaning, high pressure water washing and air cleaning, arresting the leakages by gas welding / soldering with suitable material at workshop or at site, re-assembling the same with new gaskets including replacement of radiator cap (wherever required) and fixing to the engine for DG Set of capacity from 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No.13 here-in-before but for DG Set of capacity from 62.5 KVA to 75 KVA.
All as per item No.13 here-in-before but for DG Set of capacity upto 50 KVA.
Dismantling the defective water pump assembly and Supply and fix new water pump assembly suitable for existing DG set of capacity from 100 KVA to 180 KVA complete all as specified and directed by Engr-in-Charge.
All as per item No. 16 here-in-before but of capacity 63 KVA to 75 KVA.
All as per item No. 16 here-in-before but of capacity 40 KVA to 50 KVA.
Dismantling the defective fuel injectors & FIP from the engine and M&L for repair/calibration of fuel injectors & FIP including replacement of barrel plunger, cups & ‘O’ rings etc. for DG Set of capacity 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 19 here-in-before but for DG set of capacity 62.5 KVA to 75 KVA.
All as per item No. 19 here-in-before but for DG set of capacity 40 KVA to 50 KVA.
Taking down unserviceable flywheel gear ring and Supply and fix fly wheel gear ring set suitable for DG set of capacity 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 22 here-in-before but for DG set of capacity 25 KVA to 75 KVA.
Dismantling the fly wheel coupling between engine and alternator and Supply and replace complete set of bullet rubber bushes, coupling nuts & bolts including proper alignment of engine & alternator for smooth running for DG set of capacity 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 24 here-in-before but for DG set of capacity 62.5 KVA to 75 KVA.
Taking down unserviceable engine wiring and M&L for rewiring of engine safety control system from control panel to engine control gadgets like HWT, LLOP, shut down valve, dynamo & self-starter etc for DG set of capacity from 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 26 here-in-before but for DG set of capacity from 62.5 KVA to 75 KVA.
All as per item No. 26 here-in-before but for DG set of capacity upto 50 KVA
Dismantling the defective self starter assembly 12V/24V carefully from the DG set and carryout repair and servicing by cleaning all accessories with suitable cleaning agent and supply and replace commentator, carbon brush set, carbon brush holder, king pin holder, armature choke nut, body screens, clutch plate assay and solenoid etc re-assembling and re-fixing the same and testing on completion for DG set of capacity from 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 29 here-in-before but for DG set of capacity from 40 KVA to 75 KVA.
All as per item No. 29 here-in-before but for DG set of capacity from 15 KVA to 25 KVA
Dismantling the defective battery charging alternator carefully and carryout repair and servicing by cleaning all accessories with suitable cleaning agent and supply and replace carbon brush, brush holders, bushes/bearings, varnishing etc, re-assembling and re-fixing the same and testing on completion complete all as specified and directed by Engineer-in-Charge.
Supply and fix RPM Meter with cable suitable for DG Set including taking down of existing unserviceable meter complete all as specified and directed by Engineer-in-Charge.
Supply and fix Oil Pressure Gauge suitable for DG Sets including taking down existing unserviceable gauge complete all as specified and directed by Engineer-in-Charge.
Supply and fix Water Temperature Gauge suitable for DG Sets including taking down existing unserviceable gauge complete all as specified and directed by Engineer-in-Charge.
Supply and connect battery lead (1.50m long each) made out of PVC Insulated Plain/Striped Automobile Cables with high conductivity bright annealed copper conductor bunched together, insulated with dielectric grade PVC compound (impervious to oils, greases, acids, petrol and water) conforming to IS 2465 of size 25 sqmm soldered one end with copper/brass connector with nuts and bolts for battery pole and the other with copper lug for self starter terminal including taking down of existing u/s battery lead with connector and lug of any description complete all as specified and directed by Engineer-in-Charge.
Supply and wrap asbestos rope of 8/10 mm thick over silencer of DG sets including taking down of existing unserviceable rope complete all as specified and directed by Engineer-in-Charge. Note: Straight length of silencer is measured for the purpose of payment
Taking down unserviceable AVR of any description from alternator and supply and fix new AVR of suitable model for existing alternator of capacity 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 38 here-in-before but for DG set of capacity from 15 KVA to 125 KVA.
Supply and fix maintenance free battery 12V, 150 AH for DG set including initial filling & Charging complete all as specified and directed by Engineer-in-Charge
All as per item No. 40 here-in-before but of rating 12V, 180 AH.
Dismantling the defective alternator from DG set, transporting to civil work shop, separating the stator and rotor from alternator housing, cutting and removing burnt winding of stator completely, cleaning the slots and rewinding the stator with existing gauge of super enameled copper wire with suitable insulation, applying varnish and heating in heating chamber till completely dried and reassembling the alternator, transporting back to site and re-fixing to the DG set including proper alignment for smooth running and testing on completion for DG set of capacity 100 KVA to 180 KVA complete all as specified and directed by Engineer-in-Charge.
All as per item No. 42 here-in-before but for DG set of capacity 63 KVA to 75 KVA.
All as per item No. 42 here-in-before but for DG set of capacity 40 KVA to 50 KVA.
All as per item No. 42 here-in-before but for DG set of capacity 15 KVA to 25 KVA.
Dismantling the defective Turbo charge from the DG set and carryout repair and servicing complete all as specified and directed by Engineer-in-Charge.
Supply and fix MCCB 3 Pole, 415 V, fixed type, 25 to 100 Amps with breaking capacity 16 KA including taking down unserviceable MCCB of any description complete all as specified and directed by Engineer-in-Charge.
All as per item No.47 here-in-before, but of 125 Amps
Supply and fix MCCB 3 Pole, 415 V, Adjustable type, 160 Amps with breaking capacity 36 KA including taking down unserviceable MCCB of any description complete all as specified and directed by Engineer-in-Charge.
Supply and fix MCCB 4 Pole, 415 V, Adjustable type, 200 Amps,36KA of any description complete all as specified and directed by Engineer-in-Charge.
Supply and fix MCCB 4 Pole, 415 V, Adjustable type, 250 Amps,36KA of any description complete all as specified and directed by Engineer-in-Charge.
Supply and fix Solenoid switch 12V for 180 KVA to 100 KVA for DG Set complete all as specified and directed by Engineer-in-Charge
Supply and fix Solenoid switch 12V for 75 KVA to 15 KVA for DG Set complete all as specified and directed by Engineer-in-Charge
Servicing of AMF panel of DG sets of capacity from 15 KVA to 180 KVA installed at AFS Hakimpet Area by cleaning the complete panel with suitable cleaning agent and checking the controller relays, timer, contactors for proper functioning, replacing defective spare parts, replacement of defective wires of existing size, tightening of all connections and applying jelly on contactors complete all as specified and directed by Engineer-in-Charge:- Note : Spares required will be measured and paid separately as 'Supply Only' but cost of wires shall be included in the quoted rate.
Supply only of following spare parts of existing make & model suitable for existing DG set AMF Panels, 3 Phase, 415 Volts, 50 Hz :-
4 Pole Power Contactor of rating 32 Amps
4 Pole Power Contactor of rating 63 Amps
4 Pole Power Contactor of rating 100 Amps
4 Pole Power Contactor of rating 160 Amps
4 Pole Power Contactor of rating 200 Amps
4 Pole Power Contactor of rating 325 Amps
Control relay
Timer
Battery Charging Unit 12 Volts
Battery Charging Unit 24 Volts
AMF Logic controller relay complete assembly
Auto / Manual switch complete assembly
Indicaton lamp of existing model
Engine start/stop push button
Volt /Amp meter of existing model
M&L for painting of DG set as per existing color complete with engine, alternator and all iron structure by applying two coats of syntetic enamel paint of capacity 100 to 180 KVA complete all as specified and directed.
M&L for painting of DG set as per existing color complete with engine, alternator and all iron structure by applying two coats of syntetic enamel paint of capacity upto 50 KVA complete all as specified and directed.
Comprehensive maintenance including servicing of lift (10 passengers), electricaly operated like checking of ropes, door movements, limit switch, alignment of ropes and lift, lubrication, break panel, cable checking, normal and ruitine mantenance including renewal/replacement of defective parts for the complete contract period that i.e. 09 months complete all as specified and as directed. Make :- Johnson Note :- (i) Comprehansive maintenance includes all minor, major and consumeble repairs and replacement of spare parts/parts etc. (ii) Comprehansive maintenance does not include repair/replacement of car door/car cabin. (iii) Oil level to be checked in every month and if there is any leakage observed , it must be arrested. Again oil should be filled correctly.
Supply and fix Turbo charger suitable for 50 to 15 KVA DG Set complete all as specified and as directed.
Supply and fix Turbo charger suitable for 100 to 62.5/63 KVA DG Set complete all as specified and as directed.
Material and labour for shifting of DG Set of any capacity from existing place to any where (Radius of 5KM) directed by the Engr-in-charge including disconnection of cables, control panels and re-connecting the same and testing after completion complete all as specified and directed.
Mterial & Labour for plinth protection for DG set of any capacity by using PCC 1:3:6, 75mm thick and PCC 1:2:4, 50mm thick, neat finishing incluidng excavation, removal of soil complete all as specified and directed by the Engr-in-charge.(Dimensions : 1.34mtr x 3.9mtr x 1.78 mtr)
Haasith constructions
kaushikbrothers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .