| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹51.6 LAccepted-AOC | L-1 | Accepted-AOC attached | |
| 2 | L-2₹39.3 L+₹79,516 (2.06%)Rejected-AOC VILLAGE BHAMNA KAHANGARH ROAD SAMANA DISTT PATIALA | SAMANA | PATIALA | PUNJAB | L-2 | Rejected-AOC attached |
Tender Value
₹45.3 L
EMD Value
₹91,000
Closing Date
13 Oct 2021, 11:00 amClosed
Superintending Engineer
SE 8th Circle HPPWD Hamirpur
Balance work Sajao to Chatrayana km 0.0 to 2.135 ic WBM-II, III, MT, CC Pavement and V Shape Drains in km 0.600 to 2.135
2021_CEHP_113396_1
Balance work Sajao to Chatrayana Road km 0.0 to 2.
Open Tender
Civil Works - Roads
Item Rate
185 days
Dharampur
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
EE Dharampur
₹91,000
29 Nov 2021
30 Sept 2021
13 Oct 2021
30 Sept 2021
13 Oct 2021
30 Sept 2021
Amount
Providing, laying, spreading and compacting stone aggregate of specific sizes 63-45mm (Sixty three to forty five millimetres) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN (eighty by hundred Kilo Newton) in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-II by manual means as per technical Specification Clause 405 including carriage of material within all leads, lifts and other incidental charges and as per direction of Engineer-In-Charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Providing, laying, spreading and compacting stone aggregate of specific sizes 53-22.4mm (fifty three to twenty two point four millimetres) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN (eighty by hundred Kilo Newton) in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-III by manual means as per technical Specification Clause 405 including carriage of material within all leads, lifts and other incidental charges and as per direction of Engineer-In-Charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Prime coat (with silane Nano technology) Preparing and applying of water soluble organo silance nano technology (bitumen emulsion application IRC approved ) with cationic bitumen emulsion (CSSI) and water (<1000 ppm TDS) in the ration of 1 kg (one kilogramme) organo silane nono technology : 100 kg cationic bitumen emulsin CSSI: 200 Liter water. Mixing & spraying : Take 1 (one) kilogram of organo silanne nano technology and add in 200 (two hundred) litre water while filling water in tanker/drum and than add 100 kg (one hundred kilograme) cationic bitumen emulsion under circulation. Mix the solution completely. Sprayt the solution @ 1 Litre per sq (one litre per square metre) on compacted stone base including hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Tack coat Preparing and applying of water soluble organo silance nano technology (bitumen emulsion application IRC approved ) with cationic bitumen emulsion (CRS-1) and water (<1000 ppm TDS) in the ratio of 1 kg (one kilogramme) organo silane nono technology : 100 kg cationic bitumen emulsin CRIS: 200 Liter water. Mixing & spraying : Take 1 (one) kilogram of organo silane nano technology and add in 200 (two hundred) litre water while filling water in tanker/drum and than add 100 kg (one hundred kilograme) cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution @ 0.40 Litre per sqm (zero point forty litre per square metre) on compacted stone base including hauling of materials in all leads and lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Providing, laying and rolling of open-graded premix carpet of 20 mm (twenty millimeter) thickness composed of 13.2 mm to 5.6 mm (thirteen point two millimeter to five point six millimeter) aggregates using bitumen emulsion (MS) at the rate of 2.15 Kg per sqm (two point one five kilogram per square metre) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN (eighty-one hundred kilo newton) static roller capacity, finished to required level and grades to be followed by seal coat of Type A as per Technical Specification Clause 508 by mechnical means including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Providing and laying seal coat with penetration grade bitumen VG-10 at the rate of 0.68 Kg per sqm (zero point six eight kilogram per square metre) with organosilane eno technology @ 1% per beg waight of bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B and as per Technical Specification Clause 510 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound ( where specified ) and wa ter finishing to lines and grade as per drawing and Technical specification clause 1501 including hauling of material within all leads and lifts and other incidental charges and as per direction of Engineer-In-Charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Providing and fixing Reinforced cement concrete M-15 (fifteen) grade Ordinary Kilometer stone precast of standard design as per IRC:8 fixing in position including painting and printing etc. as per drawing and technical specifications rural roads August 2004 clauses 1703 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-In-Charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Providing and fixing Reinforced cement concrete M-15 (fifteen) grade 200 mtr stone precast of standard design as per IRC:8 fixing in position including painting and printing etc. as per drawing and technical specifications rural roads August 2004 clauses 1703. () including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-In-Charge. The rates are inclusive of royality, GST or other taxes imposed by the Government.
Routine Maintenance after completion of construction work as per terms and condition of bid document that is 4 (vi) of contract data to general condition of contract and technical specifications of Ministry of Rural Development for rural roads August 2004 for rural roads including hauling/carriage of all labour equipment and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction of the Engineer-in-Charge.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
sanjeev kumar govt contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .