Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC | 1 | Accepted-AOC Overall Lowest L-1 | |
| 2 | 2₹3.4 L+₹33,340 (10.8%)Rejected-AOC R O AT VILL BHADIWA POST AMBA DISTT VARANASI UP 221104 | VARANASI | VARANASI | UTTAR PRADESH | 221104 | 2 | Rejected-AOC Overall L-2 | |
| 3 | 3₹3.7 L+₹64,149 (20.7%)Rejected-AOC | 3 | Rejected-AOC Overall L-3 |
Tender Value
₹3.1 L
EMD Value
₹6,200
Closing Date
4 May 2020, 5:00 pmClosed
Superintending Engineer, O and MC-I
Superintending Engineer, Operation And Maintenance Circle-I, ATPS, Anpara Thermal Power Project, Anpara
Repair of the assembly part by machining, cutting, small welding work ,boring, facing, drilling, thread cutting etc. to give the subject part smooth and desired finish so as to fit with main assembly of pumps at D.M. Plant, ATPS, Anpara
2020_RVUNL_443358_1
01/OMC-I/OGD/ATPS/2020-21
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Anpara Sonebhadra
Please refer Tender Document
3 documents required · 3 mandatory
₹590
Dy. C.A.O., C.F.A.And B.O., ATPS, Anpara
₹6,200
27 Jul 2020
5 Mar 2020
8 May 2020
5 Mar 2020
4 May 2020
5 Mar 2020
Amount
Spider of clarified pump, waste water pump and Degrasser Pump
Impeller casing spider of clarified pump, waste water pump and Degrasser Pump
Line shaft/Impeller shaft/pump shaft of clarified pump, waste water pump and Degrasser Pump
Shafts (line/pump/impeller) of clarified pump, waste water pump and Degrasser Pump
Shaft of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Shaft of BFP pump.
Mounting spindle of bearing of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Discharge bowl/intermediate bowl/impeller casing/suction bell of of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Discharge bowl/intermediate bowl/impeller casing /suction bell of Boiler Fill pump.
Bearing housing of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Bearing housing/ guide vane of Boiler Fill pump.
Shaft of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Shaft of Boiler Fill Pump
Impeller of clarified pump, waste water pump and Degrasser Pump, make up pump, alkali dosing pump, unloading pump, regenration pump etc
Pump shaft of regenration pump and blower
Lower stool/Stuffing box housing /impeller shaft/ Intermediate shaft/gland shaft/head shaft of Boiler Fill Pump.
Re-metallising of worn-out/damaged portion of the given part by standard quality low hydrogen electrodes metal suitable to the parent material of the given assembly part for C.I. parts
Re-metallising of worn-out/damaged portion of the given part by standard quality low hydrogen electrodes metal suitable to the parent material of the given assembly part for Alloy steel parts
Re-metallising of worn-out/damaged portion of the given part by standard quality low hydrogen electrodes metal suitable to the parent material of the given assembly part for S.S. parts
A.K. CONSTRUCTION CO.
M/S THE RELIABLE ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .