Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC 66 RISHI VIHAR PHASE II MAJITHA ROAD AMRITSAR | AMRITSAR | AMRITSAR | PUNJAB | ₹33.1 L | L1 | Accepted-AOC Accept |
| 2 | Not Admitted-Fee/PreQual/Technical KOT KHALSA ROAD AMRITSAR | AMRITSAR | AMRITSAR | PUNJAB | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹37.2 L
EMD Value
₹74,312
Closing Date
26 Feb 2026, 11:00 amClosed
Executive Engineer
Construction Division No.3 Amritsar
Construction and Renivation work in Urban Training Health Centre(U.T.H.C)Phawara Chownk Amritsar
2026_CEPW_161094_1
Tender Notice.No.28 Dt.17.02.2026c3
Open Tender
Civil Works - Buildings
Percentage
90 days
Amritsar
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,000
Yes
₹74,312
Yes
17 Sept 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work | - | - | - | - |
| 2 | Dismantling glazed tiles (to be carefully removed). | 582.21 | sqm | 133.79 | ₹77,893.88 |
| 3 | Dismantling concrete (d) Cement concrete plain 1:2:4 mix. | 0.19 | cum | 1,438.03 | ₹273.23 |
| 4 | Dismantling brick work tile, masonry or tile lining (b) In cement. | 31.87 | cum | 718.49 | ₹22,898.28 |
| 5 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of
trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 6.8 | cum | 191.74 | ₹1,303.83 |
| 6 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth. | 16.11 | cum | 6,182.76 | ₹99,604.26 |
| 7 | First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 44.18 | cum | 6,328.14 | ₹2,79,577.23 |
| 8 | Scraping (c) Cement plaster | 133.78 | sqm | 37.93 | ₹5,074.28 |
| 9 | 12.5 mm thick cement plaster 1:4. | 211.81 | sqm | 203.61 | ₹43,126.63 |
| 10 | Cement concrete 1:2:4 (a) With stone ballast or shingle (i) mixing by manual means. | 0.28 | cum | 5,355.79 | ₹1,499.62 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_326774.xls
BOQ • 0.54 MB
SBD.pdf
Tender Documents • 16.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .