| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAdmitted-Finance B 56 LANE NO 4A SECTOR 7 VASHNAVI ENCLAVE CHANNI HIMAT JAMMU 180015 | JAMMU | JAMMU AND KASHMIR | 180015 | L1 | Admitted-Finance | |
| 2 | L2₹32.7 L+₹1.8 L (5.68%)Admitted-Finance WARD NO 1 HOUSE NO 04 SUBASH NAGAR UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Admitted-Finance | |
| 3 | L3₹34.3 L+₹3.4 L (10.9%)Admitted-Finance WARD NO 16 HOUSE NO 66 SALLIAN TALAB UDHAMPUR 182 101 J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Admitted-Finance | |
| 4 | L4₹35.4 L+₹4.5 L (14.4%)Admitted-Finance HOUSE NO 108 WARD NO 08 SHAKTI NAGAR DHAR ROAD UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Admitted-Finance | |
| 5 | L5₹37.1 L+₹6.2 L (20.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOHAN LAL AND SONS L7 | slathia construction works L4 | LUXMI ELECTRONIC WORKS L3 | ANIKET TRADERS L1 | ASIA BUILDER L6 | DAVINDER SINGH L2 | PROACH ASSOCIATES BUILDERS & ENGINEERS L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down after shutdown and disconnecting existing primary/secondary side of repairable transformer of capacity upto 630 KVA indoor /outdoor type and removing/ taking down for repair from existing cable and including earth wire all as specified and directed by Engr-in-Charge.
Note :-
(i)The contractor shall return the transformer duly repaired with in 20 days other wise a penalty of Rs 1000/- per day will be recovered from the firm.
(ii) All type of T &P i.e Hydra etc for lifting of transformer and safely equipment shall be provided by the contractor. | 10 | Each | 200 ₹2,000 Lowest | 2,000 ₹20,000 | 6,000 ₹60,000 | 2,500 ₹25,000 | 4,000 ₹40,000 | 2,000 ₹20,000 | 3,000 ₹30,000 |
| 2.00 | M&L for shifting including loading unloading and transporting to contractor workshop/ authorised workshop of transformer of size 63 to 630 KVA capacity with suitable arrangement i.e hydra, crane etc. after complete repair and satisfactory restoring from contractor’s workshop or working site including testing etc and reconnecting with existing primary power cable and secondary power cable side & earthing of transformer after taking shut down and including testing & commissioning on existing load in the presence of officer nominated and re-testing at site as per norms and direction of Engr-in-Charge
Note :-
(i) Winding wire and other items/spares and new transformer oil mentioned in above will be measured and paid separately.
(ii) Placing /removing standby transformer in the place of defective transformer under repair including loading /unloading, shifting including transportation and make the system/phase sequence etc shall be the responsibility of the contractor, contractor quoted rates shall be inclusive of all these factors. Nothing extra shall be extra paid to contractor/vendor. | 10 | Each job | 6,000 ₹60,000 | 10,000 ₹1,00,000 | 14,500 ₹1,45,000 | 2,500 ₹25,000 Lowest | 12,000 ₹1,20,000 | 9,000 ₹90,000 | 6,000 ₹60,000 |
| 3.00 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for secondary original size copper wire complete with all required insulation/ varmishing materials complete all as specified and directed by Engineer-in-Charge. | 360 | Kg | 1,000 ₹3,60,000 | 1,150 ₹4,14,000 | 876 ₹3,15,360 Lowest | 1,100 ₹3,96,000 | 1,100 ₹3,96,000 | 1,125 ₹4,05,000 | 880 ₹3,16,800 |
| 4.00 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for primary original size copper wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 260 | Kg | 1,000 ₹2,60,000 | 1,150 ₹2,99,000 | 876 ₹2,27,760 Lowest | 1,100 ₹2,86,000 | 1,100 ₹2,86,000 | 1,125 ₹2,92,500 | 880 ₹2,28,800 |
| 5.00 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for secondary original size aluminium wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 50 | Kg | 1,000 ₹50,000 | 300 ₹15,000 Lowest | 496 ₹24,800 | 800 ₹40,000 | 300 ₹15,000 Lowest | 300 ₹15,000 Lowest | 390 ₹19,500 |
| 6.00 | M&L for winding the transformer 63 KVA to 630 KVA suitable for primary original size aluminium wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 40 | Kg | 1,000 ₹40,000 | 300 ₹12,000 Lowest | 496 ₹19,840 | 800 ₹32,000 | 399 ₹15,960 | 300 ₹12,000 Lowest | 390 ₹15,600 |
| 7.00 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 63 to 100 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 15 | Each | 200 ₹3,000 | 700 ₹10,500 | 160 ₹2,400 | 100 ₹1,500 Lowest | 800 ₹12,000 | 750 ₹11,250 | 890 ₹13,350 |
| 8.00 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 160 to 250 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 15 | Each | 200 ₹3,000 | 700 ₹10,500 | 160 ₹2,400 | 100 ₹1,500 Lowest | 1,100 ₹16,500 | 1,000 ₹15,000 | 1,100 ₹16,500 |
| 9.00 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 315 to 400 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 12 | Each | 200 ₹2,400 | 700 ₹8,400 | 160 ₹1,920 | 100 ₹1,200 Lowest | 1,200 ₹14,400 | 1,000 ₹12,000 | 1,200 ₹14,400 |
| 10.00 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 630 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 1 | Each | 200 ₹200 | 700 ₹700 | 160 ₹160 | 100 ₹100 Lowest | 1,500 ₹1,500 | 1,200 ₹1,200 | 1,500 ₹1,500 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
21 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) Jammu
HQ CWE (AF) Jammu Air Force Station Jammu
CA NO CWEAFJ-32/2026-27 REPAIR/MAINTENANCE OF 11KV/33KV POWER AND DISTRIBUTION TRANSFORMER ALONGWITH SERVO VOLTAGE STABILIZERS AND CONNECTED WORKS AS SUCH DEHYDRATION, TESTING, COMMISSIONING ETC AT AF STATION UDHAMPUR UNDER GE (AF) UDHAMPUR
2026_MES_789865_1
CA NO CWEAFJ-32/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Udhampur
As per NIT and Tender document
9 documents required · 9 mandatory
₹500
GE (AF) Udhampur
₹98,000
Yes
28 Oct 2026
17 Sept 2026
23 Oct 2026
17 Sept 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down after shutdown and disconnecting existing primary/secondary side of repairable transformer of capacity upto 630 KVA indoor /outdoor type and removing/ taking down for repair from existing cable and including earth wire all as specified and directed by Engr-in-Charge.
Note :-
(i)The contractor shall return the transformer duly repaired with in 20 days other wise a penalty of Rs 1000/- per day will be recovered from the firm.
(ii) All type of T &P i.e Hydra etc for lifting of transformer and safely equipment shall be provided by the contractor. | 10 | Each | 1.25 | ₹12.5 |
| 2 | M&L for shifting including loading unloading and transporting to contractor workshop/ authorised workshop of transformer of size 63 to 630 KVA capacity with suitable arrangement i.e hydra, crane etc. after complete repair and satisfactory restoring from contractor’s workshop or working site including testing etc and reconnecting with existing primary power cable and secondary power cable side & earthing of transformer after taking shut down and including testing & commissioning on existing load in the presence of officer nominated and re-testing at site as per norms and direction of Engr-in-Charge
Note :-
(i) Winding wire and other items/spares and new transformer oil mentioned in above will be measured and paid separately.
(ii) Placing /removing standby transformer in the place of defective transformer under repair including loading /unloading, shifting including transportation and make the system/phase sequence etc shall be the responsibility of the contractor, contractor quoted rates shall be inclusive of all these factors. Nothing extra shall be extra paid to contractor/vendor. | 10 | Each job | - | - |
| 3 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for secondary original size copper wire complete with all required insulation/ varmishing materials complete all as specified and directed by Engineer-in-Charge. | 360 | Kg | -1.25 | - |
| 4 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for primary original size copper wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 260 | Kg | -2.5 | - |
| 5 | M&L for winding the transformer of size 63 KVA to 630 KVA suitable for secondary original size aluminium wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 50 | Kg | -3.75 | - |
| 6 | M&L for winding the transformer 63 KVA to 630 KVA suitable for primary original size aluminium wire complete with all required insulation/ varnishing materials complete all as specified and directed by Engineer-in-Charge. | 40 | Kg | -5 | - |
| 7 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 63 to 100 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 15 | Each | -6.25 | - |
| 8 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 160 to 250 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 15 | Each | -7.5 | - |
| 9 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 315 to 400 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 12 | Each | -8.75 | - |
| 10 | S & F in repair secondary stud bush of brass complete with nuts bolts and washers of brass for 630 KVA transformer complete all as specified and directed by Engineer-in-Charge. | 1 | Each | -10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_885433.xls
BOQ • 0.79 MB
32TENDERDOC.pdf
Tender Documents • 1.19 MB
DATECORR32.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .