Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.4 L+₹8,772.10 (1.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹8.4 L+₹8,772.10 (1.05%)Admitted-Finance C 226 SHALIMAR GARDEN EXTENTION 2 SAHIBABAD GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | L2 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹26,316
Closing Date
22 Sept 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Patch repair work of damaged road from Ward-72 Kaushambi Dabur Tiraha to Kaushambi Bus Depot (Dr. Burman Marg) under Vasundhara Zone.
2026_DOLBU_1184978_43
131/Nirman/2026-27 Date 10.09.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹26,316
27 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S/l of 22.4 to 53 mm gauge stone ballast stacking for measurement etc all complete as per the direction of engineer charge (As per pwd sor 2020 RMR) | 6.88 | cum | 2,151.2 | ₹14,800.26 |
| - | Consolidation of stone ballast in aggreated 40 to 63 mm to 22. 4 to 53 mm aguge stone ballast size to water bound macadam specification including spreating in uniform thickness hand packing rolling with three wheels 80-100km static roller in satges to p | 6.88 | cum | 690 | ₹4,747.2 |
| - | S/L of Take coat of bitumin @ 0.30kg/sqm including heating the vg 10bitumin spraying the bitumin boiler & cleaning and preparing the existing road surface etc all complete as per the direction of engineer in charge (As per RMR) | 1,109 | sqm | 17.6 | ₹19,518.4 |
| 4 | Providing and laying dence graded (B.M)bituminious macadam with Hmp producing an average output of 75 tonnes per hoiur usng crused aggregate from approaved quarry of specification gradeing premixed the bitumin binder vg-30 @4.5 percenrt by weight of total mix and filler transportation the hot mix to work site laying for proper completion of work as per direction of enginner in charge including all labour T&P taxs labour cess etc as per RMR | 5 | cum | 14,199.6 | ₹70,998 |
| 5 | Providing and laying bituminious (S.D.B.C)concrete with hmp crused aggregate form approved quarry of speficication from approved quarry of specification grade premixed with bitumin binder (vg-30)@ 5.4 percent by weight of total mix and filler transportation the hot mix to work site laying for proper completion of work as per direction of enginner in charge including all labour T&P taxs labour cess etc as per RMR | 38.86 | cum | 16,297.5 | ₹6,33,334.38 |
| 6 | GST | 18 | Percentage | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_2229605.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .