Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹12,400
Closing Date
28 Jul 2026, 9:00 am2d left
Executive.Engineer.WD.Z.P.Sindhudurg
Executive.Engineer.WD.Z.P.Sindhudurg
Providing WBM and BT surface to Animal Kapa Upto Rohilewadi tal kankavli
2026_SINDH_1317002_14
SZP/WD/TENDER/SUBE/10/26-27
Open Tender
Civil Works
Percentage
180 days
kankavli
Unemployed Engineers only
10 documents required · 10 mandatory
₹500
₹12,400
13 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 21 | Cmt | 130.65 | ₹2,743.65 |
| 2 | 2) Supplying 40mm trap metal at the road side for metal including conveying an stacking etc. complete (50 meter intial lead (excluding royalty) by breaking boulders(hand broken)Add 10% Hilly area S.E.Circular No.1 R.A. | 60 | Cmt | 1,488.1 | ₹89,286 |
| 3 | 3)Supplying soft murum at the road site, including conveying and stacking complete. | 1 | Cmt | 660.8 | ₹660.8 |
| 4 | 4) Spreading over size 40/50/60/80mm laterite /trap metal including sectioning complete 55.00 Add 10% | 60 | Cmt | 93.3 | ₹5,598 |
| 5 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete. | 15 | Cmt | 86.75 | ₹1,301.25 |
| 6 | Compacting the size metal(100 mm loose) layer 2.0 to 7.00 mtwidth with static roller, including necessary labour, materials including necessary labour, materials and artificial watering etc complete. | 600 | Smt | 27.45 | ₹16,470 |
| 7 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) (Without tackcoat) | 1,893 | Smt | 274.1 | ₹5,18,871.3 |
| 8 | Providing 20m thick premix bituminous carpet including supplying all materials, preparing and cleaning the base, heating bitumen applying tack coat at specified rate, Mixing hot bitumen and chips, laying the carpet layer and compacting etc comp. by bulk asphalt, (cold mix with prior approval) | 1,893 | Smt | 218.5 | ₹4,13,620.5 |
| 9 | Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,893 | Smt | 97.95 | ₹1,85,419.35 |
| 10 | Providing and fixing name board of size 1.00 metre x 1.08 metre of M.S. sheet and 25x25x6 mm M.S. angle including fixing in ground, painting and lettering etc. complete. | 1 | No | 4,096.45 | ₹4,096.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
Tenderform.pdf
Tender Documents • 0.70 MB
BOQ_2258151.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].