Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.2 LAccepted-AOC | ₹64.2 L | L1 | Accepted-AOC Lowest (L1) |
| 2 | L2₹64.5 L+₹32,742.96 (0.51%)Rejected-Finance 487 A 1 GOPAL MISHRA ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹64.5 L+₹32,742.96 (0.51%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹64.8 L+₹64,843.90 (1.01%)Rejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹64.8 L+₹64,843.90 (1.01%) | L3 | Rejected-Finance Not L1 |
| 4 | Rejected-Technical 55 SURYA SEN STREET ROOM NO 307 KOLKATA 700009 | KOLKATA | WEST BENGAL | 700009 | - | - | Rejected-Technical Shortfall documents as asked in the shortfall process not submitted |
| 5 | Rejected-Technical 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | - | - | Rejected-Technical Shortfall documents as asked in the shortfall process not submitted |
Tender Value
₹64.2 L
EMD Value
₹1.3 L
Closing Date
14 Aug 2026, 5:00 pmClosed
EE, (Elec.), Housing Sector, KMDA (Erstwhile KIT )
OFFICE OF THE EXECUTIVE ENGINEER ELECTRICAL DIVISION, HOUSING SECTOR , KMDA(KIT WING) Unnayan Bhawan, DJ-11, Sector-II, 1st Floor, Block-A, Salt Lake, Kolkata- 700 091
Round the clock operation and cleaning in different housing schemes pump rooms of erstwhile KIT presently under Housing sector, KMDA
2026_KMDA_1035021_1
KMDA/HOUSING /EE (Elec.)/ NIT-10/ 2026-2027
Open Tender
ELECTRICAL WORKS ORG
Percentage
365 days
Different housing schemes pump rooms of erstwhile
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.3 L
Yes
11 Sept 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Round the clock operation and cleaning in different housing schemes pump rooms as per direction of EIC a) Total 23 nos semi skilled labour for 01 month i.e 23X1=23 Man-month | 12 | Month | 4,48,914 | ₹53,86,968 |
| 2 | Add LWC @ 1% on Total amount over item No. 1 | 53,86,968 | Percentage | 0.01 | ₹53,869.68 |
| 3 | Add GST @ 18% on Total amount over item No. 1 to 2 | 54,40,837.68 | Percentage | 0.18 | ₹9,79,350.78 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 12.66 MB
Tendernotice_3.pdf
PDF • 0.06 MB
BOQ_2542330.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .