Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹92,000
Closing Date
26 Nov 2026, 2:30 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE/TP1/Chn
A10 230 KV GIS SS Guindy Chennai
Construction of 33 11KV yard equipment Plinths cable duct filling with quarry dust Metal spreading and allied other civil works etc. for the Upgradation of existing 33 11kV SS into 110 33 11kV SS at Naidumangalam with 1 16 MVA 110 33kV Power Trans
2026_EB_724914_1
CETP1-26/2026-27
Open Tender
Civil Works
Works
120 days
Naidumangalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹92,000
Yes
12 Nov 2026
12 Nov 2026
27 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 451 | M3 | - | - |
| 2 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Medium rock and dense medium rock not requiring blasting | 50 | M3 | - | - |
| 3 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete and as per the Engineer at site.. | 113 | M3 | - | - |
| 4 | R:C:C 1:1.5:3 using 12 to 20mm metal without form work including cost of all materials,curing, machine mix, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 87 | M3 | - | - |
| 5 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 37 | M3 | - | - |
| 6 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level)- RCC wall | 147 | M3 | - | - |
| 7 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M20 grade with a minimum cement content of 360 kg per M3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. Precast Cover Slabs | 19 | M3 | - | - |
| 8 | P:C:C 1:2:4 using 12 to 20mm HBG metal without form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 62 | M3 | - | - |
| 9 | PCC 1:2:4 mix using 20mm downgraded HBG machine crushed metal for foundation concrete including form work, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification and as per the Engineer at site.. | 104 | M3 | - | - |
| 10 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete and as per the Engineer at site. | 14.5 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_870315.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .