Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.0 L Quoted ₹97,807 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT. | 1 | Nos | 24,864 ₹24,864 |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B. | 1 | Nos | 12,432 ₹12,432 |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT. | 1 | Nos | 26,800 ₹26,800 |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 8,933 ₹8,933 |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 8,933 ₹8,933 |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-3 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 3A, 3B | 1 | Nos | 12,625 ₹12,625 |
| 7.00 | Material Charges: 1)CRC 500ml | 2 | Nos | 426 ₹852 |
| 8.00 | 2)Bolt & Nuts various sizes | 4 | Kgs | 162 ₹648 |
| 9.00 | Cost of consumables (Lumsum) | 1 | Nos | 1,720 ₹1,720 |
Tender Value
Refer Docs
Closing Date
18 Aug 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPSI ES Circle EM-I Unit-III Dismantling and reassembling of HT LT terminal links of generator Transformer-III, UAT - 3A UAT 3B for conducting statutory testing of TG GT during Annual overhaul 2025
2025_EB_588141_1
CE-MTPSI-SE-ES-EM-I-OT59-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
15 May 2026
2 Aug 2025
19 Aug 2025
2 Aug 2025
18 Aug 2025
2 Aug 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for Complete cleaning washing of Generating Transformer-3 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 3A, 3B
Material Charges: 1)CRC 500ml
2)Bolt & Nuts various sizes
Cost of consumables (Lumsum)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_702684.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid