Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15 LAccepted-AOC | ₹15 L Quoted ₹15.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.5 L+₹53,999.99 (3.60%)Rejected-Finance SHRI BHAGWAN RAMCHANDRA PATIL R A PACHERDE TA BHUDARGAD | SATARA | MAHARASHTRA | 412206 | ₹15.5 L+₹53,999.99 (3.60%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.5 L+₹53,999.99 (3.60%)Rejected-Finance NOT AVAILABLE | ₹15.5 L+₹53,999.99 (3.60%) | L3 | Rejected-Finance L3 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
1 Jun 2026, 11:00 amClosed
Executive Engineer (Works) Z P Kolhapur
Executive Engineer (Works) Z P Kolhapur
STBT TO INTERNAL ROAD AT KOOR (A) GANESH DVEKAR HOME TO RAMCHANDRA KHADE HOME LAT-16.381317 LONG-74.148693 (B)PRAVIN DESAI HOME TO SANGRAM DESAI GOTHA LAT-16.381222 LONG-74.148367 TAL-BHUDARGAD DIST-KOLHAPUR
2026_KOLHA_1303682_10
E TENDER NOTICE NO 09/2026-27
Open Tender
Civil Works
Percentage
180 days
KOLHAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹15,000
31 Jul 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed.
Item / Page No : 13 / 23
Specification No : MORTH-301
Spec. Page No : 45-53 | - | Cubic Metre | 1 | - |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils.
Item / Page No : 18 / 24
Specification No : MORTH-301, 309
Spec. Page No : 45-53, 85-89 | - | Cubic Metre | - | - |
| 3 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 80 milimetre metal, by breaking rubble obtained by blasting. (Hand broken).
Item / Page No : 54 / 250
Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | - | Cubic Metre | - | - |
| 4 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29a / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | - | Cubic Metre | 1 | - |
| 5 | Spreading 80 milimetre / 40 milimetre metal for road work including sectionong, excetra complete as directed by Engineer in charge.
Item / Page No : 58 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Cubic Metre | 1 | - |
| 6 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete.
Item / Page No : 30 / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | 1 | Cubic Metre | - | - |
| 7 | Compacting the sub grade/gravel/oversize metal (200 milimetre loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Item / Page No : 59 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Square Metre | 1 | - |
| 8 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 40 milimetre metal, by breaking rubble obtained by blasting. (Hand broken).
Item / Page No : 55 / 250
Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | - | Cubic Metre | 1 | - |
| 9 | Supplying soft murum at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29b / 24
Specification No : MORTH-408
Spec. Page No : 139-142 | - | Cubic Metre | - | - |
| 10 | Compacting the sub grade / gravel / size metal (100 milimetre loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Item / Page No : 61 / 250
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Square Metre | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
SBD_2026_27.pdf
Tender Documents • 2.99 MB
BOQ_2238387.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .