| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr | L1 | Accepted-AOC Accepted at the rate of price Rs. 39219600.00 |
| 2 | L2₹4.0 Cr+₹7.2 L (1.83%)Rejected-Finance 71 KESHAV NAGAR SITAPUR ROAD LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹4.0 Cr+₹7.2 L (1.83%) | L2 | Rejected-Finance Not Accepted due to high rate quoted |
| 3 | L3₹4.1 Cr+₹19.8 L (5.04%)Rejected-Finance | ₹4.1 Cr+₹19.8 L (5.04%) | L3 | Rejected-Finance Not Accepted due to high rate quoted |
| 4 | L4₹4.1 Cr+₹22.0 L (5.62%)Rejected-Finance NONE | ₹4.1 Cr+₹22.0 L (5.62%) | L4 | Rejected-Finance Not Accepted due to high rate quoted |
| 5 | L5₹4.2 Cr+₹25.1 L (6.39%)Rejected-Finance | ₹4.2 Cr+₹25.1 L (6.39%) | L5 | Rejected-Finance Not Accepted due to high rate quoted |
Tender Value
₹6.0 Cr
EMD Value
₹11.9 L
Closing Date
22 Feb 2025, 12:00 pmClosed
S.E. Ayodhya-Ambedkar Nagar Circle, PWD, Ayodhya
S.E. Ayodhya-Ambedkar Nagar Circle, PWD, Ayodhya
Widening and Strengthening of Chhataura- Kothi- Dhaurahra-Mangalpur- Gurudutt khera road (ODR) in km-11, 12, 13 , 14
2025_CEUFZ_1007276_1
794/2yataAyo-AmbC/2025 Date07-02-2025
Open Tender
Civil Works
Fixed-rate
360 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.9 L
Yes
28 Mar 2025
17 Feb 2025
22 Feb 2025
17 Feb 2025
22 Feb 2025
17 Feb 2025
Amount
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead of 1km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge.(Local Earth)
Construction of embankment/shoulder with approved material obtained from borrow pits with all lifts and lead of 1km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including cost of all material,Labour,T&P etc. complete as per MORT&H specification and as per direction of Engineer-in-charge.(Carted Earth)
Construction of granular sub-base by (GSB Gr-1) providing coarse graded of approved quarry material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, including cost of all material, Labour, T&P, etc complete as per MORTH clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate of approved quarry to wet mix macadam after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% cement and 3.5% Emulsion in uniform single layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORTH clause 406
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared above ETA surface cleaned with mechanical broom.Including cost of all material,Labour,T&P etc. complete as per MORTH specification including cost of material, Labour, T&P etc. .Complete as per MORT&H Specification.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 30 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509.
PCC in 1:3:6 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications.
Sand Fillling in foundation trenches as per drawing and technical specification.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing and laying 600mm reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
Providing and laying 900mm reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.
Pointing with cement mortar (1:2) on brickwork as per drawing and technical specification .
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M 20
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications as per MORT&H.
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification.
Providing and laying Reinforced cement concrete in M-25 grade concrete including reinforcement and formwork complete as per drawing and Technical specification and as per relevant clauses of section 1500, 1600, 1700 and clause 2704 of specification .
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Providing and laying of hot appiled thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250gms per sqm area, Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC : 35 The finished surface to be level, uniform and free from streak and holes.
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% (Item No. 1 to 20)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% (Item No. 1 to 20)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% (Item No. 1 to 20)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% (Item No. 1 to 20)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% (Item No. 1 to 20)
S.S. INFRA (BID ID -4985957)
M/S ANANDESHWAR ENTERPRISES (BID ID -4976909)
P.K. Construction (BID ID -4984978)
M/s Alok Infra Projects (BID ID -4986007)
M/S ADISHAKTI TRADING CO. (BID ID -4985353)
M/S RAKESH KUMAR SINGH THEKEDAR (BID ID -4985972)
M/S SRI RAM TRADERS (BID ID -4970925)
M/S J AND V INFRATECH PRIVATE LIMITED (BID ID -4970937)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1804603.xls
BOQ • 0.30 MB
163627343.pdf
Tender Documents • 0.22 MB
163627345.html
Tender Documents • 0.05 MB
SBD_F.pdf
Tender Documents • 1.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .