| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.4 LAccepted-AOC R O VILL NARAIN P O SHARONTHA TEHSIL TIKKAR DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | L-1 | Accepted-AOC ok | |
| 2 | L-2₹17.5 L+₹4.1 L (30.4%)Rejected-Finance OFFICE AT CHARRI TEH SHAHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | L-2 | Rejected-Finance Reject | |
| 3 | L-3₹17.6 L+₹4.2 L (31.4%)Rejected-Finance GOVT CONTRACTOR VILLAGE SHAKRALA P O MALYANA TEHSIL SHIMLA DISTT SHIMLA | L-3 | Rejected-Finance Reject | |
| 4 | L-4₹18.3 L+₹4.9 L (36.5%)Rejected-Finance | L-4 | Rejected-Finance Reject | |
| 5 | L-5₹18.8 L+₹5.4 L (40.0%)Rejected-Finance | L-5 | Rejected-Finance Reject |
Tender Value
₹18.5 L
EMD Value
₹35,300
Closing Date
26 May 2022, 5:00 pmClosed
Executive Engineer
Division HPPWD Bharwain
Const of link road Harijan Basti Saloh Beri to Saloh km 000 to 3500 SH Const of 900mm dia RCC Hume pipe culvert at RD 0600 0821 Const of 3mtr span RCC slab culvert at RD 1855 and Const of Edge wall along with Nallah from km 1660 to 1850 LHS unde
2022_PWD_60871_1
L/R Harijan Basti Saloh Beri Under Bharwain Divn
Open Tender
Civil Works
Item Rate
182 days
Bharwain
As per tender documents
4 documents required · 4 mandatory
₹500
₹35,300
12 Oct 2022
20 May 2022
27 May 2022
21 May 2022
26 May 2022
21 May 2022
Amount
Excavation in earth work in foundation and trenches etcetera in all kind and classification of soil such as pick work, jumper work, pick jumper work, blasting work and hard blasting work and saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height including chiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removal of slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etcetera consolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying in position cement concrete 1:4:8(one cement: four sand: eight graded/crushed stone aggregate 40mm (forty miillmeter) nominal size mechanically mixed and curing complete including cost of centering and shuttering in foundation and plinth level as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying in position cement concrete 1:3:6 (one cement:three sand: six graded/crushed stone aggregate 40mm (forty millimeter) nominal size mechanically mixed and curing complete including cost of centring and shuttering in foundation and plinth level as per CPWD specification 2019 complete and the direction by the Engineer in charge including carriage of materials with in all leads and lifts and other incidentals. The rate including octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain/reinforced cement concrete M-15 (M-fifteen) grade design mix in sub structure for all type of structure complete cement contents not less than 250 kg (two hundred fifty kilogram) per cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per CPWD specification 2019 complete and the direction by the Engineer in charge including carriage of materials with in all leads and lifts and other incidentals. The rate including octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying in position cement concrete M-20 design mix to obtain the minimum compressive strength of 20N/mm² with graded crushed stone aggregate 20mm (twenty millimeter) nominal size to give smooth and even surface and cement contents not less than at the rate of 340 kg (three hundred forty kilogram) per cubic meter mechanically mixed including curing complete including cost of form work in foundation and plinth level as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying in position cement concrete M-20 design mix to obtain the minimum compressive strength of 20N/mm² with graded crushed stone aggregate 20mm (twenty millimeter) nominal size to give smooth and even surface and cement contents not less than at the rate of 340 kg (three hundred forty kilogram) per cubic meter mechanically mixed including curing complete including cost of form work in dirt wall bed plate, wheel guard as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying in position machine batched and machine mixed design mix M-25 (M-twenty five) grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix with minimum cement contents not less than 400 kgs.(four hundred kilogram) per cubic metre, including pumping of concrete to site of laying but including the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability in slab as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing steel reinforcement and Thermo-Mechanically Treated bars of grade Fe-500D or more approved make i.e. SAIL, RINL,Shyam Steel/TISCO, Jindal Panther (JSPL) for reinforced cement concrete work including bending cutting straightning and placing in position binding all complete upto any floor level/height as per CPWD specification 2019 complete and the direction by the Engineer-in-charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing and laying ( to level or slope) 900mm dia (nine hundred millimetre ) diametre reinforced cement concrete heavy duty non pressure pipes IS Class NP-2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 : 2 ( One cement : two sand) but excluding the cost of excavation, protection works, back filling, concrete and masonry work in head walls and parapets as per CPWD specification 2019 complete and the direction by the Engineer-in-charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government.
Back filling with granular material behind abutment, wing wall and return wall complete as per drawing and direction of Engineer in charge including carriage of materials/machinery required to execute the work as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Providing weepholes in brick masonry/ stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimeters) dia PVC pipe OF MAKE D-PLAST/POLY.having pressure of 4.5 kg per square meter extending through the full width of the structures with slope of 1(V):20(H) (one vertical : twenty horizontal) towards drawing face complete as per CPWD specifications 2019 complete and direction of Engineer-in-charge including carriage of materials/machinery required to execute the work in all leads and lifts and other incidentials. The rate includes octroi, royality, Malkana, toll tax, goods service tax, labour cess or other taxes imposed by the Government.
Surinder Kumar
Yash Pal Singh
Renu Sharma
Hargopal Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .