Tender Value
₹99,919
Closing Date
21 Sept 2023, 2:00 pmClosed
SE/O/TTPS
O/o SE/O/TTPS
TTPS Operation Circle MPM II ACP Replacement of wornout 20 TR condenser in compressor B by reconditioned condenser and wornout 80 NB gate valves by new valves at switchyard-I
2023_EB_367557_1
CE/SE/O/TTPS/Spec.No.156/23-24
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
26 Sept 2023
7 Sept 2023
22 Sept 2023
7 Sept 2023
21 Sept 2023
7 Sept 2023
Amount
SWITCH YARD -I WORKS : Charges for cutting and dismantling the connected pipe joints of suction & discharge gas pipelines and also dismantling the connected U clamp supports by cutting, lifting the condenser 'B' at switch yard I AC plant, approximate weight 0.5 Ton using lifting arrangement, chain blocks, shifting and kept at indoor switch yard I including the cost of all consumables, T&P hire charges etc., as per the direction of Engineer in-charge.
charges for lifting the reconditioned condenser to indoor switch yard I AC Plant (approximate Weight 0.5 Ton ) by using chain block and special lifting equipments, re- fixing in existing position of condenser 'B', fixing of U – clamps &welding of clamp with condenser of structural channels , tightening of bolts & nut after aligning and fixing in correct position , as per the direction of Engineer – In charge.
Charges for re fixing of suction and discharge refrigerant gas pipe line by re-welding, Charging Nitrogen gas, Pressure testing , Leak arresting if any, releasing the Nitrogen gas, Vaccumissing the system & commissioning of the condenser - B at switch yard I AC plant as per the direction of Engineer – In charge.
Charges for Loading and Unloading of worn out 20 Tr Condenser from Switch yard I AC Plant room to central stores for devolution of the wornout 20 Tr Condenser as scrap.
Material Cost Contractor scope: 80 NB Gate Valves
MENAKA CONSTRUCTION ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .