| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹15.9 L+₹35,663.24 (2.30%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹17.7 L+₹2.1 L (13.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹17.8 L+₹2.3 L (14.8%)Admitted-Finance PLOT NO 22 A SWASTISHRIRAJYABHISHEK SHAKE 350 RAMKRUSHNA GODAVARI HOUSING CO OPERATIVE SOCIETY RAMGOPALNAGAR PADEGAON TAL DIST CHHATRAPATI SAMBHAJINAGAR | AURANGABAD | MAHARASHTRA | 423701 | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹17.7 L
EMD Value
₹18,000
Closing Date
26 Feb 2026, 3:00 pmClosed
Managing Director CSCMPUL Sambhajinagar
Gandheli Dairy Plant, Gut No. 97, Po. Aadgaon Tal. and Dist. Chhatrapati Sambhajinagar
PROPOSED CONSTRUCTION OF COMPOUND WALL ( PARALLELTO ROAD) ON GUT NO 97 AT GANDHELI, POST AADGAON TQ. AND DIST CHH. SAMBHAJINAGAR (RECALL)
2026_ACMPU_1273375_2
E Tender/Compound Wall/2025-26
Open Tender
Civil Works
Percentage
90 days
at Gandheli Dairy Plant Chh Sambhajinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹18,000
5 May 2026
18 Feb 2026
27 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
Excavation for foundation in hard Murum including removing the excavated material upto distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring, strutting complete. (Lift upto 1.50 m.).S.S.R.2022-23 21.06 BDA2
Providing and laying in situ cement concrete 1:3:6 of trap / granite / quartize /gneiss metal for foundation and bedding including dewatering ,formwork mpacting,roughening them if special finish is to be provided, finishing if required and curing etc Complete.Spec.S.S.R.2022-23 24.01 BDE1
Providing and laying in situ cement concreteM-20 /1:2:4 of trap / granite / quartize /gneiss metal for reinforcement cement concrete work in foundation like raft,grillages,strips foundation and footing of reinforcment cement concrete column and steel stanchion including bailing out water, form work, compaction and finishing, curing etc complete. (Excluding steel erinforcment and structural steel) Spec..S.S.R.2022-23 25.11 BDF3
providing and casting in situ cement concrete M-20 of trap/ granite/ quartzite/ gneiss metal for reinforced cement concrete columns as per detailed designs and drawing, or as directed including centering, formwork, compacting and finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement)Spec. .S.S.R.2022-23 25.31 BDF5
Providing and casting in situ cement concrete M-20 of trap/ granite/ quartzite/ gnesis metal for reinforced cement concrete beams and lintels as per detailed designs and drawings, or as directed including, centering, form work of plywood / steel,. compaction and roughening the surface if special finishing to be provided and curing etc. complete (Excluding reinforcement). Spec.S.S.R.2022-23 25.50 BDF6
Providing and fixing in position TMT bar reinforcement (Produced from iron ore and made through blast furance route as per IS 1786-2008) of various diameters for reinforced cement concrete pile caps, footings, foundations, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules including cutting, bending, hooking the bars binding with wires or tack welding and supporting as required complete.Spec..S.S.R.2022-23 26.33 BDF17
Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in plinth as backing in composite masonry including bailing out water manually, striking joints, raking out joints and watering etc Complete. S.S.R.2022-23 27.01
Providing sand faced plaster externally in cement mortar using Kharsalia/ kasaba or similar type of sand, in all positions including base coat of 15 mm. thick in cement mortar 1:4 using water proofing compound at 1 kg. per cement bag, curing the same for not less than 3 days and keeping the surface of the base coat rough to receive the sand faced treatment 6to 8 mm. thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days, scaffolding etc.complete.Spec.S.S.R.2022-23 32.11 BDL7
Providing and erecting Y type barbed wire fencing with seven rows of wire with 2.45 mm dia G.I. pipe ( Rezan/ concentiDeleted ire 0.75 mm dia ) with hot dip and G.I. coated hooks as per drawing supported on M.S. angle 50 x 50 x 6 mm at 2.5 mtr. c/c including fixing and fastening with wire, painting M.S. angles with one coat of red lead primer and two coat of oil paint etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
E-Tender_CompoundWall.pdf
Tender Documents • 1.64 MB
eTENDERNIT.pdf
Other Document • 0.40 MB
BOQ_2201129.xls
BOQ • 0.24 MB
COMPOUND_WALL_ABSTRACT.pdf
Other Document • 2.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .