Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.1 Cr+₹1.3 L (1.22%)Accepted-AOC | ₹1.1 Cr+₹1.3 L (1.22%) | L2 | Accepted-AOC PROPER |
| 2 | L1₹1.1 CrRejected-AOC | ₹1.1 Cr | L1 | Rejected-AOC Not Qualified for AOC |
| 3 | L3₹1.2 Cr+₹10.1 L (9.27%)Rejected-AOC | ₹1.2 Cr+₹10.1 L (9.27%) | L3 | Rejected-AOC Not Qualified for AOC |
| 4 | L4₹1.3 Cr+₹20.5 L (18.8%)Rejected-AOC UDIANA RANGIA ASSAM | KAMRUP | ASSAM | 781030 | ₹1.3 Cr+₹20.5 L (18.8%) | L4 | Rejected-AOC Not Qualified for AOC |
| 5 | L5₹1.3 Cr+₹23.5 L (21.5%)Rejected-AOC | ₹1.3 Cr+₹23.5 L (21.5%) | L5 | Rejected-AOC Not Qualified for AOC |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
19 Jun 2020, 2:00 pmClosed
Chief Engineer
O/O Chief Engineer Water Resources Department Chandmari
Immediate measures to restoration of Baralia embankmenton on LB from Chamukhuaghat to Dusutimukh (In between ch. 12 th km to 17.70 km) for 2019-20 under SDRF.
2020_DoWR_17855_1
NALBARI/2019-20/SDRF-II/II
Open Tender
Civil Works
Works
60 days
Nalbari
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
The Executive Engineer,NalbariW.R. Division
₹3.0 L
Yes
26 Nov 2020
9 Jun 2020
20 Jun 2020
9 Jun 2020
19 Jun 2020
11 Jun 2020
Amount
Medium Jungles: Clearing medium jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% to 60 % of the area is covered by shrubs,trees etc).
Cutting bamboo , uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Uprooting bamboo clumps where bamboo already removed including removing stumps to a distance as directed.
Earth work in embankment by Tractor-trailer carriage in locally available ordinary soil excluding rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22 cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5 cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted earth work on account of shrinkage)
Compacting original ground i) Compacting original ground supporting embankment Loosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-1 and 300-2 for embankment construction as per Technical specification clause 301.4.1
Labour for ramming with cast iron rammer to proper compaction including watering if necessary , etc. complete as directed.(for ordinary soil)
Earthwork in bank trimming to the designed section /slope including removing the soils at a safe distance, complete as directed.
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-40 grade of cement concrete with graded broken course aggregates up to 12mm size down and reinforced with 4 Nos. of 4 mm dia high tensile steel wire cable at four corners with necessary cover and 4mm high tensile stirrups at 250mm C/C, in conformity with IS-6403 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia at 50 cm inside from both ends in the same face and in either face of post another 2 Nos. of holes of size 16 mm dia at 65mm inside from both ends including properly curing for 14 (fourteen) days and carriage of porcupine members from factory to the stack yard within a distance up to 100 Km complete as directed.
Carriage of Porcupine members by 40 HP Tractor -trailor including local carriage of porcupine members from stack yard to loading site up to a lead of 150m, loading , un loading at river bank near work site etc. complete as directed. (For lead beyond 2 KM and up to 5.00 Km and for all lift).
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) Launching without boat.
DIPANKA KUMAR GOSWAMI
BIPUL NATH
Jehirul Islam
MOONMOON ROY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .