Loading…
Loading…
Tender Value
₹4.7 L
EMD Value
₹9,434
Closing Date
7 Aug 2026, 4:00 pm
Executive Engineer, Malda Ars Area W/S Divn, PHED.
The Executive Engineer, Malda Ars Area W/S Divn, PHED. DOULATPUR PHE COMPLEX, MALIHA MALDA-732102
Damaged Pipe Line including Functional House Tap connection at Nimaisara under command area of Arapur Water Supply scheme at English Bazar Block under Malda Arsenic Area Water Supply Division, PHE Dte.
2026_PHED_1034198_7
WBPHED/EE/MAAD/NIeT _05 of 2026-2027.
Open Tender
CIVIL WORKS
Percentage
DOULATPUR PHE COMPLEX, MALIHA MALDA-732102
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,434
Yes
24 Jul 2026
24 Jul 2026
10 Aug 2026
25 Jul 2026
7 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all type of plain cement concrete works, stacking serviceable materials at site and removing rubish as directed with in a lead of 75 mtr.
In ground floor including roof. (a) upto 150 mm thick. | 10 | Cu.M | 939 | ₹9,390 |
| 2 | Above 150 mm thick. | 10 | Cu.M | 1,417 | ₹14,170 |
| 3 | Bitu Bituminous pucca road (approx. 450mm depth) cutting by using gaiti, chisel, hammer etc. and picking up the withdrawing excavated materials and removing the same within a distance of 30mtr. | 6 | Cu.M | 1,023 | ₹6,138 |
| 4 | Emergency horaizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrengement etc.
All complete as per direction of E.I.C (For 80 mm dia to 200 mm dia pipes.) | 2 | /Mtr | 4,970.19 | ₹9,940.38 |
| 5 | Supplying, aligning & Laying of UPVC Pipes & specials Class-III conforming to 1.5 4985-2000 (6 kg/cm2) with solvent cament joint (as per S 14182- 1994) including supply of fabricated UPVC fitting (as per IS 101-1988) with latest revision & amendments if any including earthworks in excavation in any kind of soill including mixed and morrum soil, soil mixed with boulder, road sub grade and its flank of adequate with having a maximum depth to keep the top surface of pipe 1.2 mtr.below of the existing ground level, including, dewatering and prepairing the bottom surface, lowering the pipes & specials (including UPVC adopter etc) valve (valve will be supplied departmentally free of cost) and jointing the pipes & specials with chemical solvent cement joint with supply of solvent cement including cutting pipes to required sizes & smoothing the cut and to make it suitable for solvent cement joints, including carriage of valves from the deppt. Store to work site, filling of the trenches with excavated earth and removing the surplus earth from the site including washing cleaning & disinfection with required quantity of bleaching powder, inclusive of all labour, tools & plants etc. all complete as per specification & instruction of E.I.C (Rate inclusive of all taxes including loading unloading stacking, carriage and all other charges whit so ever) (A) Pressure Rating: Class - III (I) Laying of pipe line including cost of pipe fittings/specials but excluding cost of valvesa) 90 mm (OD) | 100 | /Mtr | 342 | ₹34,200 |
| 6 | 160mm dia | 18 | /Mtr | 974 | ₹17,532 |
| 7 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @Rs.10.00/m3, if contractor used water from deptt, source B) For UPVC Pipe a) 90 mm (OD) | 100 | /Mtr | 3.6 | ₹360 |
| 8 | Making village Road (average 3 m width) crossing by horizontal auger boring for accomodation of laying of average 3 (three) nos 15 mm dia pipes for FHTC or as per direction of Engineer-in-charge. | 20 | Mtr | 188 | ₹3,760 |
| 9Supplying, fitting and fixing in position G.I. pipes of TATA make for abovbeground works with all necessary accessories, specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials, jointing materials cutting pipes, making threads, cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of 7 painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials. Payment for painting will be made seperately). | |||||
| 9.01 | (i) 15 mm dia. medium quality | 50 | Mtr. | 192 | ₹9,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 4.38 MB
BOQ_2540077.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].