| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹14.4 CrAccepted-AOC | ₹14.4 Cr Quoted ₹14.9 Cr | L2 | Accepted-AOC L1 IN NEGOTIATION |
| 2 | L1₹14.5 CrRejected-AOC N A | ₹14.5 Cr | L1 | Rejected-AOC L2 |
| 3 | L3₹16.8 CrRejected-AOC | ₹16.8 Cr | L3 | Rejected-AOC L3 |
Tender Value
₹14.7 Cr
EMD Value
₹29.4 L
Closing Date
27 Sept 2023, 12:00 pmClosed
Amit Kumar
Division - Road Maintenanceand Urban Amenities
UPGRADATION OF MASTER ROAD DIVIDING SECTOR 106/109 (ASSET ID 132), GURUGRAM.
2023_HRY_309450_1
20236264F0CD 2D2A 4C45 B50E 9A8160889CD0720001
Open Tender
Civil Works
270 days
Gurugram
2 documents required · 2 mandatory
₹1,180
₹29.4 L
Yes
25 Jan 2024
6 Sept 2023
27 Sept 2023
6 Sept 2023
27 Sept 2023
6 Sept 2023
Amount
Granular Sub-Base with Coarse Graded Material - Grading-III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications
Providing Precast R.C.C. grating with frame 300x300 mm horizontal grating in concrete chambers, including the cost of R.C.C. Grating, Transportation and Installation at site up to the satisfaction of Engineer-in-Charge
Providing and laying RCC Slab of drain cover size (1.0mx0.5mx0.15m) at the missing slab portions of drain, including the cost of concreting, shuttering, reinforcement and transporting and to the satisfaction of Engineer in charge.
Providing and applying primer coat with bitumen VG-10 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORTandH specifications
Providing and laying 40mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 40 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications
Providing and laying 80mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 40 @ 4.0% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORTandH specifications
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORTandH specifications
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORTandH specifications.
Recovery- Credit of Steel reinforcement of 80% length for R.C.C. work recovered from exsiting drain available at site, where not included in the complete rate of RCC dismantle, Complete as per Engineer in charge. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road. However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price. The price qouted against the recovery material shall have minimum reserve price of 34.00/- per kg).
Recovery- Credit of Kerb Stone (The amount computed by rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. kerb stones obtained from dismantling of existing median, islands has been calculated taking assumption that 70% of existing kerb stones will be retrieved and can be reused by the contractor at any other site. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency quotes lesser than reserve price. The price quoted against the recovery of existing kerb stones shall have minimum reserve price of Rs. 2226/- per cum.)
Recovery Item- Credit of unusable material received from Milling of BC i.e. 80% of obtained material. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road. However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / milling and if material after milling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price. The price qouted against the recovery material shall have minimum reserve price of 2194.00/- per cum).
Bidder Name
Amount
Y D Builders and Hotels Pvt Ltd(GSTN-07AAACY0026D1ZW)
P C Gupta and Co(GSTN-06AAEPG5955G1ZR)
SHIVA BUILD TECH PRIVATE LIMITED(GSTN-06AAFCS2631B1ZW)
P C Gupta and Co
SHIVA BUILD TECH PRIVATE LIMITED
Y D Builders and Hotels Pvt Ltd
SHIVA BUILD TECH PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid