Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrQualified C1B 124 3 4 5 GIDC ESTATE NANDESARI NANDESARI VADODARA VADODARA GUJARAT 391340 UDYAM GJ 24 0009385 | VADODARA | GUJARAT | 391340 | ₹2.0 Cr | L1 | Qualified MII |
| 2 | L2₹2.5 Cr+₹50.7 L (25.9%)Qualified A 2 ADITYA BIRLA CENTRE S K AHIRE MARG WORLI MUMBAI MAHARASHTRA 400030 | MUMBAI | MAHARASHTRA | 400030 | ₹2.5 Cr+₹50.7 L (25.9%) | L2 | Qualified MII |
| 3 | L3₹3.1 Cr+₹1.2 Cr (58.8%)Qualified 5 J 5TH FLOOR MANDVI AVSAR 77 81 KAZI SAYED STREET MUMBAI MUMBAI MAHARASHTRA 400003 | MUMBAI | MAHARASHTRA | 400003 | ₹3.1 Cr+₹1.2 Cr (58.8%) | L3 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
7 Jul 2025, 3:00 pmClosed
Polyaluminium Chloride as per IS 15573 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6381934 Dated : 25-06-2025 Bid Document 1/10 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 26 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : INDIAN OIL CORPORATION LIMITED IOCL- Panipat Refinery
INDIAN OIL CORPORATION LIMITED
IOCL- Panipat Refinery
Ministry of Petroleum and Natural Gas (Iocl
Panipat Refinery) Splitting
8009165
GEM/2025/B/6381934
Two Packet Bid
Polyaluminium Chloride as per IS 15573 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
2 days
132140, INDIANOIL CORPORATION LTD. PANIPAT REFINERY, PO. BOHALI, PANIPAT 1300000
Total value wise evaluation
PRODUCT
6 documents required · 6 mandatory
Exempted
25 Jun 2025
25 Jun 2025
7 Jul 2025
Polyaluminium Chloride as per IS 15573 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria
Bidder Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6381934 Dated : 25-06-2025 Bid Document 1/10 Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 26 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : INDIAN OIL CORPORATION LIMITED IOCL- Panipat Refinery
INDIAN OIL CORPORATION LIMITED
IOCL- Panipat Refinery
Ministry of Petroleum and Natural Gas (Iocl
Panipat Refinery) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8009165.pdf
GEM_BID
1750834766.pdf
OTHER
fdd296d3e573ae582c387e5dfac99783.pdf
OTHER
ATC_db0ade35-b1b1-4919-b0f21750841840229_SINGHMATISHWAR.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .