Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance LANE NO 05 HNO 56 SHIV VIHAR TALAB TILLO JAMMU | ₹3.2 L | L1 | Accepted-Finance Financially accepted |
| 2 | L2₹3.2 L+₹7,317 (2.31%)Accepted-Finance | ₹3.2 L+₹7,317 (2.31%) | L2 | Accepted-Finance Financially accepted |
| 3 | L3₹3.3 L+₹10,397 (3.28%)Accepted-Finance 111 MINI SHOPPING COMPLEX NEAR HOTEL ASIA NEHRU MARKET JAMMU JAMMU KASHMIR 180004 | JAMMU | JAMMU AND KASHMIR | 180004 | ₹3.3 L+₹10,397 (3.28%) | L3 | Accepted-Finance Financially accepted |
| 4 | L4₹3.4 L+₹20,183 (6.37%)Accepted-Finance | ₹3.4 L+₹20,183 (6.37%) | L4 | Accepted-Finance Financially accepted |
| 5 | L5₹3.4 L+₹23,014 (7.27%)Accepted-Finance | ₹3.4 L+₹23,014 (7.27%) | L5 | Accepted-Finance Financially accepted |
Tender Value
₹40 L
EMD Value
₹50,000
Closing Date
17 Apr 2023, 4:00 pmClosed
Executive Engineer
Office of the XEN Jal Shakti PHE (M) Div. Kathua
Annual Rate Contract For Repair and Maintenance of power transformers of Various Capacities Installed at Tube Wells and Pumping Stations of Jal Shakti PHE Mech. Division Kathua
2023_PHE_209371_1
e-NIT 03/JSPHEMK of 2023-24
Open Tender
Miscellaneous Works
Item Wise
7 days
Kathua District
As per SBD
2 documents required · 2 mandatory
₹1,000
Executive Engineer Jal Shakti PHE (M) Div. Kathua
₹50,000
26 Apr 2023
6 Apr 2023
18 Apr 2023
6 Apr 2023
17 Apr 2023
6 Apr 2023
Amount
63 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available.
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of LV copper coil per kg
Reconditioning of LV Aluminium coil per kg
Providing and fitting of HV leg coil copper S.E (per Kg)
Providing and fitting of HV leg coil copper DPC (per Kg)
Providing and fitting of HV leg coil Aluminium S.E (per Kg)
Providing and fitting of HV leg coil Aluminium DPC (per Kg)
Providing and fitting of LV leg coil copper DPC (per Kg)
Providing and fitting of LV leg coil Aluminium DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod (metal part) per rod
Providing & fitting of LV bush rod (metal part) per rod
Providing & fitting of gasket set
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Arresting of oil leakages if any by way of welding etc.
Painting of transformer body
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Manual carriage/Head load carriage of trabsformer from road side (to & fro)
a) upto 500M
b). Upto 1 km
c). Upto 2km
d). Upto 3km
100 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of LV copper coil per kg
Reconditioning of LV Aluminium coil per kg
Providing and fitting of HV leg coil copper S.E (per Kg)
Providing and fitting of HV leg coil copper DPC (per Kg)
Providing and fitting of HV leg coil Aluminium S.E (per Kg)
Providing and fitting of HV leg coil Aluminium DPC (per Kg)
Providing and fitting of LV leg coil copper DPC (per Kg)
Providing and fitting of LV leg coil Aluminium DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod (metal part) per rod
Providing & fitting of LV bush rod (metal part) per rod
Providing & fitting of gasket set
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Arresting of oil leakages if any by way of welding etc.
Painting of transformer body
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Manual carriage/Head load carriage of trabsformer from road side (to & fro)
a) upto 500M
b). Upto 1 km
c). Upto 2km
d). Upto 3km
150 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of LV copper coil per kg
Reconditioning of LV Aluminium coil per kg
Providing and fitting of HV leg coil copper S.E (per Kg)
Providing and fitting of HV leg coil copper DPC (per Kg)
Providing and fitting of HV leg coil Aluminium S.E (per Kg)
Providing and fitting of HV leg coil Aluminium DPC (per Kg)
Providing and fitting of LV leg coil copper DPC (per Kg)
Providing and fitting of LV leg coil Aluminium DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod (metal part) per rod
Providing & fitting of LV bush rod (metal part) per rod
Providing & fitting of gasket set
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Arresting of oil leakages if any by way of welding etc.
Painting of transformer body
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Manual carriage/Head load carriage of trabsformer from road side (to & fro)
a) upto 500M
b). Upto 1 km
c). Upto 2km
d). Upto 3km
250 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of LV copper coil per kg
Reconditioning of LV Aluminium coil per kg
Providing and fitting of HV leg coil copper S.E (per Kg)
Providing and fitting of HV leg coil copper DPC (per Kg)
Providing and fitting of HV leg coil Aluminium S.E (per Kg)
Providing and fitting of HV leg coil Aluminium DPC (per Kg)
Providing and fitting of LV leg coil copper DPC (per Kg)
Providing and fitting of LV leg coil Aluminium DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod (metal part) per rod
Providing & fitting of LV bush rod (metal part) per rod
Providing & fitting of gasket set
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Arresting of oil leakages if any by way of welding etc.
Painting of transformer body
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Manual carriage/Head load carriage of trabsformer from road side (to & fro)
a) upto 500M
b). Upto 1 km
c). Upto 2km
d). Upto 3km
400 KVA Transformer
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas).
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas) including head load carriage.
Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available
Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault.
Reconditioning of LV copper coil per kg
Reconditioning of LV Aluminium coil per kg
Providing and fitting of HV leg coil copper S.E (per Kg)
Providing and fitting of HV leg coil copper DPC (per Kg)
Providing and fitting of HV leg coil Aluminium S.E (per Kg)
Providing and fitting of HV leg coil Aluminium DPC (per Kg)
Providing and fitting of LV leg coil copper DPC (per Kg)
Providing and fitting of LV leg coil Aluminium DPC (per Kg)
Providing & fitting of HV bushing
Providing & fitting of LV bushing
Providing & fitting of HV bush rod (metal part) per rod
Providing & fitting of LV bush rod (metal part) per rod
Providing & fitting of gasket set
Providing & fitting of LT terminal plate
Providing & fitting of Oil drain valve
Providing & fitting of core laminations per Kg
Providing & fitting of sundry items
Heat treatment of repaired transformer
Arresting of oil leakages if any by way of welding etc.
Painting of transformer body
Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating.
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles and carriage to the site of work (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer
Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions.
Manual carriage/Head load carriage of trabsformer from road side (to & fro)
a) upto 500M
b). Upto 1 km
c). Upto 2km
d). Upto 3km
Providing and filling of transformer oil for topping (per litre)
Rebate of copper scrap per kg
Rebate of Aluminium scrap per kg
Rebate of old T-oil per ltr.
Rebate of burnt core lamination per kg
M/S EXPERT ELECTRICAL MECHANICAL AND ENGINEERING WORKS
AADISHWAR ELECTRICAL AND MECHANICAL WORKS
JAIMA ELECTRICALS
Major Electricals
Vinod Kumar
SAMBYAL ENG AND ELECT WORKS
Rakesh electrical works
PERFECT ELECTRICAL WORKS
PARVEEN ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .