| 1 | L1₹29.1 LAccepted-AOC | ₹29.1 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹29.3 L+₹20,046 (0.69%)Rejected-Finance 258 0 2ND FLOOR KILPAUK GARDEN ROAD KILPAUK REGENCY VILLAGE TOWN KILPAUK CITY CHENNAI CHENNAI TAMIL NADU 600010 INDIA | CHENNAI | TAMIL NADU | 600010 | ₹29.3 L+₹20,046 (0.69%) | L2 | Rejected-Finance Being L2 |
Tender Value
₹29.3 L
EMD Value
₹58,560
Closing Date
9 Sept 2021, 3:30 pmClosed
EXECUTIVE ENGINEER
No 1, RUE DUMAS, PORT DEPARTMENT, PONDICHERRY/
Minor maintenance cum running of the various systems in dredger karaikal to keep it fit and operational
2021_PORT_8391_1
3335/PORT/EE/AE(M2)/Maint. /2021-22
Open Tender
Miscellaneous Works
Works
365 days
Pondicherry Port
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
Yes
₹58,560
7 Mar 2022
2 Sept 2021
13 Sept 2021
2 Sept 2021
9 Sept 2021
2 Sept 2021
Amount
Running maintenance of dredger 'karaikal'
Strengthening the upper side of cutter ladder by welding with M.S plate of size 8’ x 4’ and thickness 10mm.All material, men and machineries are at the contractor’s cost.
Fabrication and welding of bollard each of dia 8” x 6mm thick x 300mm height. All material, men and machineries are at the contractor’s cost.
Fabrication and welding of bollard flange of dia 10” x 10mm. All material, men and machineries are at the contractor’s cost.
Fabrication and welding of Port side cabin footsteps hand railing with M.S pipe of dia 1.5” x 6m length. All material, men and machineries are at the contractor’s cost.
Fabrication and welding of hand railing near the Port side spud with 1.5” dia pipe and 6mtr length. All material, men and machineries are at the contractor’s cost.
Fabrication and fitting of Port side spud bracket pin with SS Rod of dia 75 mm and 300mm length.
All 5Nos electrical motors in the dredger are to be tested and necessary services to be undertaken with spares at contractor’s cost.
Servicing of 3Nos Hydraulic tank suction gate valve with the necessary spares at the contactor’s cost.
Removal of 3Nos old filter and replacement of Hydraulic tank suction filter with new one. All material, men and machineries are at the contractor’s cost.
Carrying out B check of both the Main Engine and Auxillary Engine. The necessary B check kit ,Engine oil and coolant are at the contractor’s cost.
Removal of old Hydraulic and gear oil and replacing with 840 ltrs of Hydraulic oil 68 and 60 ltr of gear oil EP 90. All material, men and machineries are at the contractor’s cost.
Chipping, scrapping and painting, an approximate area of 436 sq.m consisting of dredger sides, deck, superstructure and cabin deck. Two coats of Zinc rich primer to be applied in the entire area followed by two coats of Polyurethane epoxy paint. All material, men and machineries are at the contractor’s cost.
Charges for running the various systems in dredger ‘karaikal’ for a period 20 days every month. All the systems of the dredger namely the Main Engine, Auxiliary Engine, the Hydraulic pumps, swing winches, ladder winch, spud rams, all electrical motors are to be run one hour daily for 20 days in a month. The necessary labour, Diesel, Hydraulic oil, Engine oil and gear oil are at the contractor’s cost.
Tebma Marine Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .