Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.3 LAdmitted-Finance ASHOK NAGAR BALRAM GALI DORANDA RANCHI | -29.60% | ₹24.3 L | L1 | Admitted-Finance |
| 2 | L2₹25.9 LAdmitted-Finance | -25.00% | ₹25.9 L | L2 | Admitted-Finance |
| 3 | L3₹27.6 LAdmitted-Finance HOUSE NO 105 PARWEZ COLONY WARD NO 05 KISHUNPUR BUTI BUTI SADAR RANCHI JHARKHAND 835217 | RANCHI | RANCHI | JHARKHAND | 835217 | -20.00% | ₹27.6 L | L3 | Admitted-Finance |
| 4 | L4₹30.1 LAdmitted-Finance AT PO RAY PS KHALARI DISTT RANCHI JHARKHAND | RANCHI | JHARKHAND | 829205 | -12.71% | ₹30.1 L | L4 | Admitted-Finance |
| 5 | L5₹32.5 LAdmitted-Finance HOUSE NO 872 KUMAR BAGH ROAD ARSANDEY KANKE RANCHI JHARKHAND 834006 | RANCHI | RANCHI | JHARKHAND | 834006 | -5.85% | ₹32.5 L | L5 | Admitted-Finance |
Tender Value
₹34.5 L
EMD Value
₹69,500
Closing Date
6 Apr 2026, 6:00 pmClosed
EE RMC
RMC
Construction of RCC Drain at different lanes of Deendayal Nagar under Ward No-03 of RMC Ranchi
2026_UDD_112210_1
258/ENG 2026
Open Tender
Civil Works
120 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹69,500
9 Jul 2026
1 Apr 2026
7 Apr 2026
1 Apr 2026
6 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Dismantling Pucca Bricks or lime work including stacking serviceable materials in countable stacks within 15M Lead and Disposal of unserviceable materials with all leads all complete as per Direction of E/ | - | m3 | - | - |
| 2Dismantling Plain cementor lime concrete including stacking serviceable materials in countable stacks within 15M Lead and Disposal of unserviceable materials with all leads all complete as per Direction of E/ | |||||
| 3Dismantling RCC work including stacking serviceable materials in countable stacks within 15M Lead and Disposal of unserviceable materials with all leads all complete as per Direction of E/ | |||||
| 4Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | |||||
| 5Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | |||||
| 6Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | |||||
| 7Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | |||||
| 8Reinforced cement concrete work in beams, suspended floors, foors having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | |||||
| 9Providing Tor steel reinforcement of 8 mmdia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_151471.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid