| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
25 Feb 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
OFFICE OF THE SUPERINTENDING ENGINEER KANCHIPURAM ELECTRICITY DISTRIBUTION CIRCLE KEDC KANCHIPURAM OLIMUGMADPET 631 502
K2 Agreement Running Works Contract for Erection Maintenance and Dismantling of electrical networks (OH Lines UG Cables etc) for carrying out extension improvement works in Tiruthani division of KEDC for a per
2021_EB_193458_1
SE/KEDC/KANCHIPURAM/ Spec No 50/20-21/dt 02.02.202
Open Tender
Electrical and Maintenance Works
Works
365 days
Kanchipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,000
Yes
26 Feb 2021
3 Feb 2021
26 Feb 2021
3 Feb 2021
25 Feb 2021
3 Feb 2021
120 days
Excavation of Structure Pole Pit 2x3x1/6 th of height
Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole
Transporting of 9.14 m poles from Road side to pole pit
Structure pole mass Concreting and coping 0.6x06x1.65 for DP structure Including cost of all the materials and cement.
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., complete including transporting of structure materials.
Excavation of stay pit 0.95x0.60x1.5m and erection of stay set complete
Sleeve concrete for stay set including all materials
Erection of HG fuse set including transport
Erection of 11 KV AB switch complete set including transport.
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt,with trough
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt,without trough
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure
Erection of L.T. Open type fuse unit including cable jumpering upto the line.
Providing LT bus bar arrangements/ cable in DT structure including fixing of cross arm and insulator.
Erection of H.T. jumpering in DP structure complete
Erection of H.T. LAS
Erection of L.T. LAS
Erection of Distribution Transformer Upto 100 KVA
Erection of Distribution Transformer Above 100KVA
Painting of two coats of Aluminium paints for Transformers structure and iron materials including cost of paint and painting of structure pole with distemper including cost of materials etc.
Loading and unloading of Distribution Transformer at site and store.
Dismantling of failed Distribution Transformer from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)Upto 100 KVA
Dismantling of failed Distribution Transformer from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)Above 100KVA
Crane hire charges
Normal Road (earth)
Tar Road
Concrete Road
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling ,coiling and loading and unloading at both sites. 3x300 sq mm XLPE (1 drum: 200 m)
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling ,coiling and loading and unloading at both sites. 3x120 sq mm XLPE (1 drum: 200 m)
Laying of 300 sq mm XLPE cable
Laying of 120 sq mm XLPE cable
Laying of 240 sq.mm cable
Laying of 120 sq.mm XPLE cable
Laying of 25 sq.mm cable
Laying of 16 sq.mm cable
Erection of RCC/RSJ/PSC pole and other poles including excavation of pole pit (pit size 2'x3'x1/6th of the length of poles)
Excavation of pole pit for 7.5/8 meters
Erection of pole pit for7.5/8 meters
Excavaion of pole pit for 9.0/9.14 meters
Erection of pole pit for /9.0/9.14 meters
Erection of base plate
Erection of V cross arm 3 1/2' size
Erection of V cross arm 4 1/2' size
Erection of Tapping channel 5 ' size
Fixing of 11 KV TI fitting
Fixing of 33 KV TI fitting
Fixing of LT 3 phase cross arm
Fixing of LTTI fitting
Fixing of single phase cross arm
Fixing of LT pin insulator with pin
Fixing of LT shackle with strap sets
Fixing of 11 KV pin insulator with GI pin
Fixing of 33 KV pin insulator with GI pin
Fixing of 11 KV strain disc with metal parts
Fixing of 33 KV strain disc with metal parts
Fixing of Aluminium knob
Providing of fly stay (excluding pole erection and earth excavation)
Concreting of poles with 1:4:8 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor)(with coping of 1' dia upto height of 1.1/2' above and 1' below ground level)7.5 meters/8 meters pole
Concreting of poles with 1:4:8 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor)(with coping of 1' dia upto height of 1.1/2' above and 1' below ground level)9.0/ 9.14 meters pole
Earthing of poles
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Upto 7/2.59 mm ACSR/7/2.50 AAAC
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Upto 7/3.35 mm ACSR/7/3.15 AAAC
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Raccoon 7/4.09
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering. Dog conductor 7/4.72
Numbering of location/each including cost of paint and labour
Providing of guarding per span excluding of stay set erection
Providing of 2 wire flat guarding(Split neutral grounding)
Providing of 4 wire flat guarding
Providing of Craddle guarding including earthing and earth pit excavation
Erection of cross bracing set 10' Centre
Erection of cross bracing set 15' Centre
Erection of cross bracing set 10' Centre
Erection of cross bracing set 15' Centre
Erection of 33 KV centre rotating AB switch complete set
Erection of 11 KV centre rotating AB switch complete set
Erection of spacers & jumpers Single phase
Erection of spacers & jumpers Three phase
Erection of spacers & jumpers Provision of Paa jumpers
Metering set loading and unloading
Loading / unloading of poles 7.5/8 meters pole (RCC/PSC)/Each
Loading / unloading of poles 9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each
Loading / unloading of poles Conductor drum of all sizes with conductor
Loading / unloading of poles Conductor drum of all sizes without conductor
Un Loading / unloading of poles Conductor drum of all sizes with conductor
Un Loading / unloading of poles Conductor drum of all sizes without conductor
Erection of metering sets
channels/Flats/Angle
Cutting of Channel/Flat/Angle
Cutting of RSJ pole cutting
Cutting of Tubular pole cutting
Cutting of Rail pole cutting
Alteration of clamps
Maintenance of DT structure for various capacity (pole mounted structure) DP Structure maintenance
Maintenance of DT structure for various capacity (pole mounted structure) TP Structure maintenance
Maintenance of DT structure for various capacity (pole mounted structure) 4P Structure maintenance
Maintenance of DT structure for various capacity (pole mounted structure) DT maintenance
Maintenance of DT structure for various capacity (pole mounted structure) Structure earthing redoing
Maintenance of DT structure for various capacity (pole mounted structure) Replacement & Structure earthing complete including earthing with 3 pipes
Yard cleaning
Watering earth pits
Maintenance of 11 KV AB Switches only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).
Tree clearance(3' on either side of line and open to sky)
Tree Clearence Pin Point location
Tree Clearence Cut Point Location
Re-sagging (HT) 7/4.72 mm
Re-sagging (HT) 7/4.09 mm
Re-sagging (HT<) 7/3.35 mm and 7/3.15 mm
Re-sagging (HT<) 7/2.59 mm and 7/2.50 mm
Dismantling of poles 7.5m/8.0m Poles
Dismantling of poles 9.0/ 9.14 Mtr. Poles/RSJ/Tubular Poles
Dismantling of Stay set complete
Dismantling of conductors upto 7/2.59 MM including Coiling and Transporting from workspot to store
Dismantling of conductors 7/3.35 MM and above including Coiling and Transporting from workspot to store
Releasing of TI Fitting
Releasing of LT S ph "X" Arm/TI Fitting
Relaasing of LT 3 ph "X" Arm
Releasing of 3' - 6" "V" Cross Arm/Tapping channal/Guarding "X" Arm
Releasing of 4' - 6" and "V" Cross Arm
Releasing of 5' "V" Cross Arm
Dismantling of Transformer Structure materials
Dismantling of AB Switch at D.T.Structure
Dismantling of H.G. fuse set
Dismantling of HT LAS at DT Structure
Dismantling of LT LAS at DT Structure
Dismantling of Open type fuse unit with all wiring complete
Dismantling of cross bracing set(10' centre)
Dismantling of cross bracing set(15' centre)
Dismantling of Top Channel (10' centre)
Dismantling of Top Channel (15' centre)
Dismantling of Guarding including Dismantling of cross arm per span
Breaking of RCC Damaged Poles after dismantling, relesing the grill including transporting to Road side
Stacking materials/Scrap
Cleaning of 110 KV Breakers including CTs and allied maintenance work
Cleaning of 110 KV LAS
Cleaning of 110 KV AB switch and applying petroleum jelly
Cleaning of 110 KV Power transformer insulators and assisiting for all other maintenance works
Cleaning of 33 KV/11 KV Breakers and CTS and allied maintenance works
Cleaning and checking of 110 KV Bus insulators
Cleaning and checking of 33 KV/11 KV AB switches including tightening of bolt and nut and applying Petroleum jelly
Releasing and refixing of clamp in 110 KV / 33 KV / 11 KV buses
Maintenance of 110 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts, and Lubricating).
Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)
ERECTION OF SINGLE POLE DT STRUCTURE Ground leveling and Bush clearing
ERECTION OF SINGLE POLE DT STRUCTURE Loading of 9mtr/9.14mtr RCC/PSC pole
ERECTION OF SINGLE POLE DT STRUCTURE Unloading of 9mtr/9.14mtr RCC/PSC pole
ERECTION OF SINGLE POLE DT STRUCTURE Labour and transporting of 9mtr/9.14mtr RCC/PSC pole upto 5KMs
ERECTION OF SINGLE POLE DT STRUCTURE Loading and unloading line of materials including stacking
ERECTION OF SINGLE POLE DT STRUCTURE Transporting of line materials from office to work spot
ERECTION OF SINGLE POLE DT STRUCTURE Excavationof Pole pit per size 3'x 3'x6'
Erection of 9mtr/9.14mtr RCC/PSC pole including baseplate
ERECTION OF SINGLE POLE DT STRUCTURE Excavation of stay pit per size 2'x 2'x6'
ERECTION OF SINGLE POLE DT STRUCTURE Erection of stayset including baseplate
ERECTION OF SINGLE POLE DT STRUCTURE Earthing of structure complete set with 3Nos earth pits excavation including providing 3nos earthpipe of size 40mmx3mtr(GI Pipe), pit size 2'x2'x2' filled with mixture of sand, charcoal and common salt in equal proportion to to depth of 1.25' and 1"jelly to a depth of 9", earth connection to be provided with GI wire,plates and bolts and Nuts.(Except 3Nos earth pipe with GI wire, plates and bolts and nuts all other materials to be supplied by Board)
Erection of Transformer structure materials including transporting from road side to work spot per set
Erection of 11KV AB Switch set including transporting from road side to work spot. Per set
Erection of HG Fuse set including transporting from road side to work spot. Per set
Mass concreting of pole with 1;4:8 mix 1/2 broken metal jelly, cement and river sand including coping. (Size height of pole).(as per civil rate) all materials will be supplied by contractor. For 2poles
Erection of HT LAS 3Nos
Erection of LT LAS 3Nos
Painting of transformer structure including cost of paint , brush etc., (1.one coat of red oxide paint in all iron materials, 2.colour washing of 2nos structure poles, 3.painting of transformers, and all iron items with aluminium paint)
Erection of LT opentype arrangements including running LT bus and jumpering complete (Both sides)
Unloading and erection of DT at Site (Excluding loading)
Name plate painting and lettering of transformer details including cost of materials and labour
Sub Total
EPF @ 13.36% to be entered by bidder
ESI @ 3.25% to be entered by bidder
stage.html
html • 0.02 MB
finance_230935.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .