Loading…
Loading…
Tender Value
₹32.3 L
EMD Value
₹64,580
Closing Date
10 Aug 2026, 4:00 pm
Er ranjit singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
BOQ
2026_PWDJK_318422_2
E-NIT No. 47 Of 2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
60 days
Ramban
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹64,580
Yes
29 Jul 2026
29 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil @90% | 1,353.6 | Cum | 187.3 | ₹2,53,529.28 |
| 0.0 | Oridinary Rock @ 10% | 150.4 | Cum | 392.8 | ₹59,077.12 |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil @90% & OR@10%@ | 113.94 | Cum | 280.52 | ₹31,962.45 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level
with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 41.38 | Cum | 5,733.6 | ₹2,37,256.37 |
| 0.0 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 8 | Cum | 4,826.5 | ₹38,612 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 14.82 | Cum | 7,788.4 | ₹1,15,424.09 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.22 | Cum | 9,821.85 | ₹1,88,775.96 |
| 0.0 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.24 | Cum | 9,395.7 | ₹30,442.07 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto/above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,738.7 | Kg | 123.2 | ₹4,60,607.84 |
| 0.9 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 196.39 | Sqm | 286.35 | ₹56,236.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1049238.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].