| 1 | 1₹3.5 LAccepted-Finance 4 13 B PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹3.7 L+₹21,009.45 (6.00%)Accepted-Finance D NO 82 1 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 2 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹4,700
Closing Date
28 Mar 2022, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I Circle CA FP Break down Preventive maintenance works in Hydrant Emulsifyre headers such as dismantling and erection of pipe lines of various sizes patch welding replacement of fire hydrant post removing of slabs and earth work and dewater
2022_EB_225545_1
CE / MTPS-I / SE / M-I / CA / OT. 263 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
120 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹4,700
Yes
31 Mar 2022
14 Mar 2022
29 Mar 2022
14 Mar 2022
28 Mar 2022
14 Mar 2022
Amount
Charges for removing and assembling the RCC slab in hydrant system underground pipe line trench for attending of water leak.
Excavation of earth work in the underground pipe line.
Refilling the excavated soil after completion of work.
Charges for dismantling of 300NB worn out M.S ERW pipe by cutting etc.,
Charges for Erection, laying, cutting and welding of 300 NB M.S ERW Pipeline
Charges for dismantling of 200 mm dia damaged M.S ERW pipe by cutting etc.,
Charges for erection of 200 mm dia M.S ERW pipe by cutting and welding etc.,
Charges for dismantling of 150 NB damaged M.S ERW pipe by cutting & welding.
Charges for erection of 150 NB dia New M.S ERW pipe by cutting & welding.
Charges for dismantling of 80/100 NB dia damaged M.S ERW pipe by cutting & welding.
Charges for erection of new M.S ERW 80NB/100NB pipe by cutting & welding.
Charges for cutting, grinding, cleaning and welding of 150 /100/ 80 NB bend, flange and fabricated reducers with new erected M.S ERW pipe per Joint.
Charges for cutting, grinding, cleaning and welding of 200 NB bend, flange and fabricated reducers with new erected M.S ERW pipe per Joint.
Charges for fabrication of patch plate size (150mmx100mm x5.4mm thick) for 100NB M.S ERW pipe, cleaning the underground 100NB M.S. ERW pipe punctured area ,Top of pipe opening 200x150mm size by cutting, fixing the patch plate bottom of the pipe (inside) by welding, closing the top of opening by aligning and welding in the existing line.
Charges for fabrication of patch plate size (150mmx100mm x5.4mm thick) for 150NB/200NB M.S ERW pipe, cleaning the underground 150NB/200NB M.S. ERW pipe punctured area ,Top of pipe opening 200x150mm size by cutting, fixing the patch plate bottom of the pipe (inside) by welding, closing the top ofopening by aligning and welding in the existing line
Charges for fabrication of patch plate size (150mmx100mm) 7.01thick plate by cleaning the punctured 350 NB M.S.ERW pipe, aligning and patch welding in Hydrant / Emulsifyre header
Charges for Fabrication of patch plate size (150mmx100mm) 7.01 thick plate by cleaning the punctured 300 NB M.S.ERW pipe, aligning and patch welding in Hydrant / Emulsifyre header.
Charges for Fabrication of patch plate size (150mm x 100mm) 7.01 thick plate by cleaning the punctured 200 NB M.S.ERW pipe, aligning and patch welding.
Charges for providing and dismantling scaffolding arrangement up to the height of 8 mtr for pipe line changing work.
Charges for fabrication of new single headed hydrant post out of 80 mm ф M.S ERW pipe 2 metre length and welding with MS bend one side and M.S flanges on both sides.
Charges for replacement of punctured single headed hydrant post along with landing valve by new post with landing valve with new gasket by cleaning the flange surface and wrapping the pipe by tar sheet up to 1 metre.
Charges for dewatering
Charges for wrapping of tar sheet on the underground line.
Charges for Painting the fabricated 200/150/100/80 NB M.S ERW pipe lines with one coat enamel red oxide primer
Charges for Painting of two coats of enamel red paint to the fabricated 200/150/100/80 NB M.S ERW pipe lines.
Cost of Synthetic Enamel Post Office Red Paint
Cost of Thinner
Cost of cutting Gas
Cost of Electrodes Welding Rod
Cost of Consumables and T&P
Bidder Name
S PANDURANGAN
A R CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .