| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-Finance | ₹11.4 L | L1 | Accepted-Finance Accept |
| 2 | L2₹11.8 LRejected-Finance 580 SURESH NAGAR HANUMAN MANDIR KE PASS THATIPUR GWALIOR 474011 | GWALIOR | MADHYA PRADESH | 474011 | ₹11.8 L | L2 | Rejected-Finance Reject |
Tender Value
₹12.5 L
EMD Value
₹9,348
Closing Date
21 Apr 2026, 5:30 pmClosed
Sushil katare
GWALIOR MUNICIPAL CORPORATION
Maintenance work of Community Hall Civil Dispensary, Drain and Tin Shed Work in ward No. 53 file No. 64/26X3/3 (Molik Nidhi)
2026_UAD_492420_1
MPGMC/64/26X3/3/Jan/2025-26
Open Tender
Civil Works - Others
90 days
Jankarya Deparment
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹9,348
18 May 2026
18 Mar 2026
23 Apr 2026
19 Mar 2026
21 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling old plaster or skirting upto15mmthickness, raking out joints and cleaning thesurfaceforplasteruptotwofloor level includingdisposal of rubbishwithin50meters leadand including scaffolding etc. | |||||
| 2UAD SOR 2021 Vol-2, I.No-5.11.4/ P. No- 47 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding upto floor level including cost of binding wire, wastage and over laps upto 12mm horizontal/ inclined position of reinforcement bars in slab and beams, plinth, chajjas, lintels, upto 4.5m vertical length of reinforcement in wall columns (over laps shall be provided as per requirement of IS : 13920; IS 456 & SP :34) etc. complete. TMT bars.. | |||||
| 3UADSOR 2021Vol-2,I.No-19.1.1/P.No-208 Centering and shuttering including strutting, propping etc.and removal of form (A)for Foundations, footings, bases of columns, etc. For mass concrete. | |||||
| 4UAD SOR 2021 Vol-2, I.No-6.3.2/ P. No-56 Brick work with chimeny brick of class designation 40 in superstructure above plinth level upto floor 2 level including the cost of scaffolding in :Cement mortar 1:6(1 cement : 6 coarse sand) | |||||
| 5Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :CementconcretegradeM-10(NominalMix)with40mmmaximumsize of stone aggregate. drain base | |||||
| 6Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :CementconcretegradeM-20(NominalMix)with20mmmaximumsize of stone aggregate. drain base | |||||
| 7UAD SOR 2021 Vol-2, I.No-5.3/ P. No-46 R.C.C. work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor two level excluding the cost of centering, shuttering and reinforcement with Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size of stone aggregate. | |||||
| 8UADSOR 2021 Vol-2,I.No-10.15.1/P.No-118 Steel work in built up M.S. tubular section (round, square or rectangular Hollow tube etc.) trusses/frame work etc./ railing work etc. i/c cutting, hoisting fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete.Hot finished welded type tubes. | |||||
| 9UADSOR2021Vol-2,I.No-10.14.1.2/P.No-118 Steel work welded in built up sections/ framed work including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | |||||
| 10UAD SOR 2021 Vol-2, I.No-11.5/ P. No-130 62 mm thick cement concrete flooring with concrete hardener topping under layer 50 mm thick cement concrete grade M-15 (Nominal Mix with 20mm maximum size of stone aggregate) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6mm nominal size) by volume. Hardening compound is mixed @ 2 litre per 50kg of cement or as per manufactures specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
TenderDocument.pdf
Tender Documents • 3.81 MB
BOQ_583043.xls
BOQ • 0.27 MB
Estimate.pdf
Additional Documents • 4.82 MB
Drawing.pdf
Additional Documents • 0.30 MB