| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.5 L+₹2,293.05 (0.91%)Rejected-AOC | ₹2.5 L+₹2,293.05 (0.91%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L2 | SRI ABIRAMI ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete. | 4 | m3 | 4,310 ₹17,240 | 4,308 ₹17,232 Lowest |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 19 | m3 | 145 ₹2,755 | 135 ₹2,565 Lowest |
| 3.00 | Desilting the existing SWDrain as per Instruction of departmental officers..including all initial lead and lift etc complete. | 4 | m3 | 100 ₹400 | 97 ₹388 Lowest |
| 4.00 | Dismantling the damaged PCC WALL as per Instruction of departmental officers..including all initial lead and lift etc complete. | 5 | m3 | 500 ₹2,500 | 486 ₹2,430 Lowest |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all
materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 3 | m3 | 5,400 ₹16,200 | 5,338 ₹16,014 Lowest |
| 6.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 37 | m2 | 350 ₹12,950 | 337 ₹12,469 Lowest |
| 7.00 | Cement concrete 1:3:6 mix (one cement Three sand and Six aggregates) using 20 mm size hard broken stones from approved quarry complying with standard specification | 10 | m3 | 6,045 ₹60,419.78 | 6,037 ₹60,339.82 Lowest |
| 8.00 | Plastering in Cement Morter 1: 5 Mix using 20 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 28 | M2 | 600 ₹16,800 | 586 ₹16,408 Lowest |
| 9.00 | Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | 19 | m2 | 1,200 ₹22,802.4 | 1,154 ₹21,928.31 Lowest |
| 10.00 | Supply and Fabrication of RTS Rods in Various Dia. Including Cutting, Bending and Tying with all Labour Charges Etc., Complete. | 4 | qtl | 9,152 ₹36,608 Lowest | 9,152 ₹36,608 Lowest |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
19 Mar 2025, 3:00 pmClosed
Assistant commissioner, westzone
westzone, coimbatore corporation
Reconstruction of Culverts at Pudhukinar street 1st Cross in Ward No 41 of West Zone.
2025_MAWS_531810_23
E7/WESTZONE/2025
Open Tender
Civil Works
Works
90 days
westzone, coimbatore corporation
As per the tender document attached
4 documents required · 4 mandatory
₹0
₹3,000
11 May 2026
12 Mar 2025
20 Mar 2025
12 Mar 2025
19 Mar 2025
12 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
SWD.pdf
Tender Documents • 0.68 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_633156.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .